Bridgeline Holdings, L.P.; Notice of Deferral of Action on Petition for Rate Approval, 46977 [E7-16534]
Download as PDF
Federal Register / Vol. 72, No. 162 / Wednesday, August 22, 2007 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR07–14–000]
Bridgeline Holdings, L.P.; Notice of
Deferral of Action on Petition for Rate
Approval
August 16, 2007.
On August 2, 2007, Bridgeline
Holdings, L.P. (Bridgeline) filed a
motion for a sixty-day deferral of action
on its Petition for Rate Approval filed
on June 1, 2007, in the above-docketed
proceeding. Bridgeline states that it
intends to acquire by way of merger all
interest and assets of Bridgeline
Distribution and Bridgeline Storage on
or about September 1, 2007. Because of
these transactions, Bridgeline is
requesting a sixty-day deferral of action
on its petition for rate approval filed in
Docket No. PR07–14–000 until the
merger of these assets is complete.
Bridgeline further states that on or about
September 1, 2007, they will make the
necessary filings to the Commission to
facilitate this merger. At that time
Bridgeline intends to withdraw the
instant petition for rate approval in the
above-docketed proceeding.
Upon consideration, notice is hereby
given that a sixty-day deferral of action
on its Petition for Rate Approval is
granted to and including October 2,
2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–16534 Filed 8–21–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR07–17–000]
CCPS Transportation, LLC; Notice of
Petition for Declaratory Order
jlentini on PROD1PC65 with NOTICES
August 15, 2007.
Take notice that, on August 13, 2007,
CCPS Transportation, LLC (CCPS),
pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2007),
tendered for filing to the Commission a
petition to issue a declaratory order
confirming the proposed capacity
allocation and rate structure for the
planned expansion of the Spearhead
Pipeline, which will increase
Spearhead’s average annual capacity to
carry crude petroleum between
Flanagan, Illinois and Cushing,
VerDate Aug<31>2005
16:26 Aug 21, 2007
Jkt 211001
Oklahoma by 65,000 barrels per day.
Subject to the Commission’s approval of
this petition, the Spearhead expansion
is targeted to go into service in the first
quarter of 2009.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. eastern time,
August 31, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–16505 Filed 8–21–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
46977
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–434–000]
CenterPoint Energy Gas Transmission
Company; Notice of Request Under
Blanket Authorization
August 15, 2007.
Take notice that on August 10, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT), 1111 Louisiana
Street, Houston, Texas 77002–5231,
filed in Docket No. CP07–434–000, a
prior notice request pursuant to sections
157.205 and 157.211 of the Federal
Energy Regulatory Commission’s
regulations under the Natural Gas Act
for authorization to construct, own, and
operate a delivery point, located in
Caddo County, Louisiana, all as more
fully set forth in the application, which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Specifically, CEGT proposes to install
a six-inch tap and a six-inch orifice
meter skid with six-inch flow control
regulator on CEGT’s Line N in order to
serve Calumet Lubricants Company,
L.P.. CEGT estimates the cost of
construction to be $208,457. CEGT
states that the facilities will have the
capability of delivering up to 10,000 Dth
per day.
Any questions regarding the
application should be directed to
Lawrence O. Thomas, Director—Rate &
Regulatory, CenterPoint Energy Gas
Transmission Company, P.O. Box
21734, Shreveport, Louisiana 71151, or
call at (318) 429–2804.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
E:\FR\FM\22AUN1.SGM
22AUN1
Agencies
[Federal Register Volume 72, Number 162 (Wednesday, August 22, 2007)]
[Notices]
[Page 46977]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-16534]
[[Page 46977]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PR07-14-000]
Bridgeline Holdings, L.P.; Notice of Deferral of Action on
Petition for Rate Approval
August 16, 2007.
On August 2, 2007, Bridgeline Holdings, L.P. (Bridgeline) filed a
motion for a sixty-day deferral of action on its Petition for Rate
Approval filed on June 1, 2007, in the above-docketed proceeding.
Bridgeline states that it intends to acquire by way of merger all
interest and assets of Bridgeline Distribution and Bridgeline Storage
on or about September 1, 2007. Because of these transactions,
Bridgeline is requesting a sixty-day deferral of action on its petition
for rate approval filed in Docket No. PR07-14-000 until the merger of
these assets is complete. Bridgeline further states that on or about
September 1, 2007, they will make the necessary filings to the
Commission to facilitate this merger. At that time Bridgeline intends
to withdraw the instant petition for rate approval in the above-
docketed proceeding.
Upon consideration, notice is hereby given that a sixty-day
deferral of action on its Petition for Rate Approval is granted to and
including October 2, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-16534 Filed 8-21-07; 8:45 am]
BILLING CODE 6717-01-P