Northern Natural Gas Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Cunningham Storage Boundary Extension Project and Request for Comments on Environmental Issues, 46989-46990 [E7-16523]
Download as PDF
Federal Register / Vol. 72, No. 162 / Wednesday, August 22, 2007 / Notices
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
construction of any facilities at this
time. Any future proposal to construct
jurisdictional facilities at the
Cunningham Storage Field would be
subject to an appropriate environmental
review by the Commission.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility on My Land? What Do I Need
To Know?’’ was attached to the project
notice that Northern provided to
landowners. This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is
available for viewing on the FERC
Internet Web site (https://www.ferc.gov).
Nathaniel J. Davis, Sr.,
Acting Deputy Secretary.
[FR Doc. E7–16536 Filed 8–21–07; 8:45 am]
Summary of the Proposed Project
Northern is proposing to extend its
existing Cunningham Gas Storage Field
by 4,800 acres in order to protect the
integrity of the storage field. Northern
believes that third party operators
outside of the storage field boundaries
are producing storage gas. The location
of the proposed storage field extension
is shown in Appendix 1.2
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–107–000]
Northern Natural Gas Company; Notice
of Intent To Prepare an Environmental
Assessment for the Proposed
Cunningham Storage Boundary
Extension Project and Request for
Comments on Environmental Issues
jlentini on PROD1PC65 with NOTICES
August 15, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Cunningham Storage Boundary
Extension Project involving Northern
Natural Gas Company’s (Northern)
extension of the certificated boundary of
the Cunningham Gas Storage Field in
Pratt and Kingman Counties, Kansas.1
This EA will be used by the
Commission in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
If you are a landowner receiving this
notice, you may be contacted by a gas
storage company representative about
the acquisition of natural gas storage
rights beneath your property. The gas
storage company would seek to
negotiate a mutually acceptable
agreement for the rights to operate a
natural gas storage field beneath your
property. It should be noted that the
current proposal does not involve the
1 Northern’s
application was filed with the
Commission under Section 7 of the Natural Gas Act.
VerDate Aug<31>2005
16:26 Aug 21, 2007
Jkt 211001
Land Requirements
No facilities would be constructed.
Northern’s proposal is for extension of
the certificated Cunningham Storage
Field boundary by an additional 4,800
acres. This area is located due north and
adjacent to the northern boundary of the
storage field.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping’’. The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, the Commission staff
requests public comments on the scope
of the issues to address in the EA. All
comments received are considered
during the preparation of the EA. State
and local government representatives
are encouraged to notify their
2 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices, other than Appendix 1 (map), are
available on the Commission’s Web site at the
‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary refer to the last page of
this notice. Copies of the appendices were sent to
all those receiving this notice in the mail.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
46989
constituents of this proposed action and
encourage them to comment on their
areas of concern.
In the EA we 3 will discuss impacts
that could occur as a result of the
storage field extension. We will also
evaluate possible alternatives to the
proposed project or portions of the
project, and make recommendations on
how to lessen or avoid impacts on the
various resource areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the public participation
section below.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal,
alternatives to the proposal, and
measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of the comments for
the attention of Gas Branch 3.
• Reference Docket No. CP07–107–
000.
• Mail your comments so that they
will be received in Washington, DC on
or before September 17, 2007.
The Commission strongly encourages
electronic filing of any comments or
interventions or protests to this
proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
3 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects
(OEP).
E:\FR\FM\22AUN1.SGM
22AUN1
46990
Federal Register / Vol. 72, No. 162 / Wednesday, August 22, 2007 / Notices
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s
Guide. Before you can file comments
you will need to create a free account
which can be created on-line.
We may mail the EA for comment. If
you are interested in receiving it, please
return the Information Request
(Appendix 2). If you do not return the
Information Request, you will be taken
off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding, or ‘‘intervenor’’. To become
an intervenor you must file a motion to
intervene according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Intervenors
have the right to seek rehearing of the
Commission’s decision. Motions to
Intervene should be electronically
submitted using the Commission’s
eFiling system at https://www.ferc.gov.
Persons without Internet access should
send an original and 14 copies of their
motion to the Secretary of the
Commission at the address indicated
previously. Persons filing Motions to
Intervene on or before the comment
deadline indicated above must send a
copy of the motion to the Applicant. All
filings, including late interventions,
submitted after the comment deadline
must be served on the Applicant and all
other intervenors identified on the
Commission’s service list for this
proceeding. Persons on the service list
with e-mail addresses may be served
electronically; others must be served a
hard copy of the filing.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
jlentini on PROD1PC65 with NOTICES
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities.
VerDate Aug<31>2005
16:26 Aug 21, 2007
Jkt 211001
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called
eSubscription, which allows you to
keep track of all formal issuances and
submittals in specific dockets. This can
reduce the amount of time you spend
researching proceedings by
automatically providing you with
notification of these filings, document
summaries and direct links to the
documents. Go to https://www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–16523 Filed 8–21–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1864–079]
Upper Peninsula Power Company;
Notice of Application for Amendment
of License and Soliciting Comments,
Motions To Intervene, and Protests
August 15, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
License to Permanent Modifications to
Articles 401 and 402.
b. Project No: 1864–079.
c. Date Filed: July 3, 2007.
d. Applicant: Upper Peninsula Power
Company.
e. Name of Project: Bond Falls
Hydroelectric Project.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
f. Location: On the Ontonagon River,
in Ontonagon and Gogebic Counties,
Michigan, and Vilas County, Wisconsin.
One of the project’s four developments,
Bond Falls, occupies 73.5 acres of land
within the Ottawa National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Terry P. Jensky,
Vice President, Energy Supply
Operations, Upper Peninsula Power
Company, 700 North Adams Street, P.O.
Box 19001, Green Bay, WI 54307–9001;
(715) 355–2047.
i. FERC Contact: Jake Tung,
Telephone (202) 502–8757, and e-mail:
hong.tung@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protest:
September 17, 2007. All documents
(original and eight copies) should be
filed with: Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. The
Commission’s Rules of Practice and
Procedure require all intervenors filing
documents with the Commission to
serve a copy of that document on each
person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: The
applicant proposes to amend the license
for the Bond Falls Hydroelectric Project
at the Bergland Development (Lake
Gogebic), as follows: (1) change end of
month target elevations from 1295.7 to
1295.9 ft msl in June and from 1295.7
to 1295.5 ft msl in August and
September; (2) change minimum flow
trigger-elevations to match the proposed
target elevations from 1295.4 to 1295.9
ft msl in June, from 1295.4 to 1295.7 ft
msl in July, and from 1295.4 to 1295.5
ft msl for the period August 1 through
September 14.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
E:\FR\FM\22AUN1.SGM
22AUN1
Agencies
[Federal Register Volume 72, Number 162 (Wednesday, August 22, 2007)]
[Notices]
[Pages 46989-46990]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-16523]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP07-107-000]
Northern Natural Gas Company; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Cunningham Storage Boundary
Extension Project and Request for Comments on Environmental Issues
August 15, 2007.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Cunningham Storage Boundary
Extension Project involving Northern Natural Gas Company's (Northern)
extension of the certificated boundary of the Cunningham Gas Storage
Field in Pratt and Kingman Counties, Kansas.\1\ This EA will be used by
the Commission in its decision-making process to determine whether the
project is in the public convenience and necessity.
---------------------------------------------------------------------------
\1\ Northern's application was filed with the Commission under
Section 7 of the Natural Gas Act.
---------------------------------------------------------------------------
If you are a landowner receiving this notice, you may be contacted
by a gas storage company representative about the acquisition of
natural gas storage rights beneath your property. The gas storage
company would seek to negotiate a mutually acceptable agreement for the
rights to operate a natural gas storage field beneath your property. It
should be noted that the current proposal does not involve the
construction of any facilities at this time. Any future proposal to
construct jurisdictional facilities at the Cunningham Storage Field
would be subject to an appropriate environmental review by the
Commission.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility on My Land? What Do I Need To Know?'' was attached to the
project notice that Northern provided to landowners. This fact sheet
addresses a number of typically asked questions, including the use of
eminent domain and how to participate in the Commission's proceedings.
It is available for viewing on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
Northern is proposing to extend its existing Cunningham Gas Storage
Field by 4,800 acres in order to protect the integrity of the storage
field. Northern believes that third party operators outside of the
storage field boundaries are producing storage gas. The location of the
proposed storage field extension is shown in Appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices, other
than Appendix 1 (map), are available on the Commission's Web site at
the ``eLibrary'' link or from the Commission's Public Reference
Room, 888 First Street, NE., Washington, DC 20426, or call (202)
502-8371. For instructions on connecting to eLibrary refer to the
last page of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail.
---------------------------------------------------------------------------
Land Requirements
No facilities would be constructed. Northern's proposal is for
extension of the certificated Cunningham Storage Field boundary by an
additional 4,800 acres. This area is located due north and adjacent to
the northern boundary of the storage field.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
This process is referred to as ``scoping''. The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this Notice of Intent, the Commission staff
requests public comments on the scope of the issues to address in the
EA. All comments received are considered during the preparation of the
EA. State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
In the EA we \3\ will discuss impacts that could occur as a result
of the storage field extension. We will also evaluate possible
alternatives to the proposed project or portions of the project, and
make recommendations on how to lessen or avoid impacts on the various
resource areas.
---------------------------------------------------------------------------
\3\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section below.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal, and measures to avoid or lessen
environmental impact. The more specific your comments, the more useful
they will be. Please carefully follow these instructions to ensure that
your comments are received in time and properly recorded:
Send an original and two copies of your letter to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas
Branch 3.
Reference Docket No. CP07-107-000.
Mail your comments so that they will be received in
Washington, DC on or before September 17, 2007.
The Commission strongly encourages electronic filing of any
comments or interventions or protests to this proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
[[Page 46990]]
on the Commission's Web site at https://www.ferc.gov under the ``e-
Filing'' link and the link to the User's Guide. Before you can file
comments you will need to create a free account which can be created
on-line.
We may mail the EA for comment. If you are interested in receiving
it, please return the Information Request (Appendix 2). If you do not
return the Information Request, you will be taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding, or ``intervenor''. To
become an intervenor you must file a motion to intervene according to
Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214). Intervenors have the right to seek rehearing of the
Commission's decision. Motions to Intervene should be electronically
submitted using the Commission's eFiling system at https://www.ferc.gov.
Persons without Internet access should send an original and 14 copies
of their motion to the Secretary of the Commission at the address
indicated previously. Persons filing Motions to Intervene on or before
the comment deadline indicated above must send a copy of the motion to
the Applicant. All filings, including late interventions, submitted
after the comment deadline must be served on the Applicant and all
other intervenors identified on the Commission's service list for this
proceeding. Persons on the service list with e-mail addresses may be
served electronically; others must be served a hard copy of the filing.
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners who are
potential right-of-way grantors, whose property may be used temporarily
for project purposes, or who own homes within distances defined in the
Commission's regulations of certain aboveground facilities.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on ``General Search'' and enter the
docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription, which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-16523 Filed 8-21-07; 8:45 am]
BILLING CODE 6717-01-P