Download as PDF rwilkins on PROD1PC63 with NOTICES Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Notices franchised service area. The electric energy which Sierra Power proposes to export to Canada would be surplus energy purchased from electric utilities, Federal power marketing agencies, and other entities within the United States. Sierra Power will arrange for the delivery of exports to Canada over the international transmission facilities owned by Basin Electric Power Cooperative, Bonneville Power Administration, Eastern Maine Electric Cooperative, International Transmission Co., Joint Owners of the Highgate Project, Long Sault, Inc., Maine Electric Power Company, Maine Public Service Company, Minnesota Power, Inc., Minnkota Power Cooperative, Inc., New York Power Authority, Niagara Mohawk Power Corp., Northern States Power Company, Vermont Electric Power Company, and Vermont Electric Transmission Co. The construction, operation, maintenance, and connection of each of the international transmission facilities to be utilized by Sierra Power has previously been authorized by a Presidential permit issued pursuant to Executive Order 10485, as amended. Procedural Matters: Any person desiring to become a party to these proceedings or to be heard by filing comments or protests to this application should file a petition to intervene, comment, or protest at the address provided above in accordance with 385.211 or 385.214 of the Federal Energy Regulatory Commission’s Rules of Practice and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each petition and protest should be filed with DOE on or before the date listed above. Comments on the Sierra Power application to export electric energy to Canada should be clearly marked with Docket No. EA–329. Additional copies are to be filed directly with Doug White, Brad Nesiba, Sierra Power Asset Marketing, 3773 Cherry Creek North Drive, Suite 655, Denver, CO 80209 and Steven A. Weiler, Justin P. Moeller, Leonard, Street and Deinard, PA, The Army and Navy Club Building, 1627 Eye Street, NW., Suite 610, Washington, DC 20006. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to the National Environmental Policy Act of 1969, and a determination is made by DOE that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address VerDate Aug<31>2005 17:27 Aug 15, 2007 Jkt 211001 provided above and at https:// www.oe.energy.gov/304.htm. Issued in Washington, DC, on August 10, 2007. Anthony J. Como, Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability. [FR Doc. E7–16130 Filed 8–15–07; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Issuance of Order August 9, 2007. BE Allegheny, LLC (Docket No. ER07– 1112–000); BE CA LLC (Docket No. ER07–1113–000); BE Cleco LLC (Docket No. ER07–1114–000); BE Colquitt LLC (Docket No. ER07–1115–000); BE Ironwood LLC (Docket No. ER07–1116– 000); BE KJ LLC (Docket No. ER07– 1117–000); BE Rayle LLC (Docket No. ER07–1118–000); BE Red Oak LLC (Docket No. ER07–1119–000); BE Satilla LLC (Docket No. ER07–1120–000); BE Tenaska LLC (Docket No. ER07–1121– 000); and BE Walton LLC (Docket No. ER07–1122–000) BE Allegheny LLC, BE CA LLC, BE Cleco LLC, BE Colquitt LLC, BE Ironwood LLC, BE KJ LLC, BE Rayle LLC, BE Red Oak LLC, BE Satilla LLC, BE Tenaska LLC and BE Walton LLC (collectively, the BE Subsidiaries) filed applications for market-based rate authority, with accompanying rate schedules. The proposed market-based rate schedules provide for the sale of energy, capacity and ancillary services at market-based rates. The BE Subsidiaries also requested waivers of various Commission regulations. In particular, the BE Subsidiaries requested that the Commission grant blanket approval under 18 CFR Part 34 of all future issuances of securities and assumptions of liability by BE Subsidiaries. On August 9, 2007, pursuant to delegated authority, the Director, Division of Tariffs and Rates-Central, granted the request for blanket approval under Part 34 (Director’s Order). The Director’s Order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard concerning the blanket approvals of issuances of securities or assumptions of liability by the BE Subsidiaries, should file a protest with the Federal Energy Regulatory PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 46051 Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing protests is September 10, 2007. Absent a request to be heard in opposition to such blanket approvals by the deadline above, the BE Subsidiaries are authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of the BE Subsidiaries, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of the BE subsidiaries issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E7–16034 Filed 8–15–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL07–31–001] DTE Pontiac North LLC; Notice of Filing August 9, 2007. Take notice that on June 19, 2007, pursuant to section 1266 of the Public Utility Holding Company Act of 2005 (2005), 366.1 of the Federal Energy Regulatory Commission’s regulations, 18 CFR 366.1 (2006) and Order No. 667, E:\FR\FM\16AUN1.SGM 16AUN1

Agencies

[Federal Register Volume 72, Number 158 (Thursday, August 16, 2007)]
[Notices]
[Page 46051]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-16034]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


 Notice of Issuance of Order

August 9, 2007.

BE Allegheny, LLC (Docket No. ER07-1112-000); BE CA LLC (Docket No. 
ER07-1113-000); BE Cleco LLC (Docket No. ER07-1114-000); BE Colquitt 
LLC (Docket No. ER07-1115-000); BE Ironwood LLC (Docket No. ER07-1116-
000); BE KJ LLC (Docket No. ER07-1117-000); BE Rayle LLC (Docket No. 
ER07-1118-000); BE Red Oak LLC (Docket No. ER07-1119-000); BE Satilla 
LLC (Docket No. ER07-1120-000); BE Tenaska LLC (Docket No. ER07-1121-
000); and BE Walton LLC (Docket No. ER07-1122-000)

    BE Allegheny LLC, BE CA LLC, BE Cleco LLC, BE Colquitt LLC, BE 
Ironwood LLC, BE KJ LLC, BE Rayle LLC, BE Red Oak LLC, BE Satilla LLC, 
BE Tenaska LLC and BE Walton LLC (collectively, the BE Subsidiaries) 
filed applications for market-based rate authority, with accompanying 
rate schedules. The proposed market-based rate schedules provide for 
the sale of energy, capacity and ancillary services at market-based 
rates. The BE Subsidiaries also requested waivers of various Commission 
regulations. In particular, the BE Subsidiaries requested that the 
Commission grant blanket approval under 18 CFR Part 34 of all future 
issuances of securities and assumptions of liability by BE 
Subsidiaries.
    On August 9, 2007, pursuant to delegated authority, the Director, 
Division of Tariffs and Rates-Central, granted the request for blanket 
approval under Part 34 (Director's Order). The Director's Order also 
stated that the Commission would publish a separate notice in the 
Federal Register establishing a period of time for the filing of 
protests. Accordingly, any person desiring to be heard concerning the 
blanket approvals of issuances of securities or assumptions of 
liability by the BE Subsidiaries, should file a protest with the 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426, in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure. 18 CFR 385.211, 385.214 
(2004).
    Notice is hereby given that the deadline for filing protests is 
September 10, 2007.
    Absent a request to be heard in opposition to such blanket 
approvals by the deadline above, the BE Subsidiaries are authorized to 
issue securities and assume obligations or liabilities as a guarantor, 
indorser, surety, or otherwise in respect of any security of another 
person; provided that such issuance or assumption is for some lawful 
object within the corporate purposes of the BE Subsidiaries, compatible 
with the public interest, and is reasonably necessary or appropriate 
for such purposes.
    The Commission reserves the right to require a further showing that 
neither public nor private interests will be adversely affected by 
continued approvals of the BE subsidiaries issuance of securities or 
assumptions of liability.
    Copies of the full text of the Director's Order are available from 
the Commission's Public Reference Room, 888 First Street, NE., 
Washington, DC 20426. The Order may also be viewed on the Commission's 
Web site at https://www.ferc.gov, using the eLibrary link. Enter the 
docket number excluding the last three digits in the docket number 
filed to access the document. Comments, protests, and interventions may 
be filed electronically via the Internet in lieu of paper. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-16034 Filed 8-15-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.