National Environmental Policy Act Procedures, 45998-46009 [E7-15867]
Download as PDF
45998
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
text of the proposed amendment to
§ 301.6033–5 is the same’’.
SUPPLEMENTARY INFORMATION:
Background
The notice of proposed rulemaking by
cross-reference to temporary regulations
and notice of proposed rulemaking that
are the subjects of this correction are
under sections 6011, 6033, 6071, and
4965 of the Internal Revenue Code.
LaNita Van Dyke,
Chief, Publications and Regulations Branch,
Legal Processing Division, Associate Chief
Counsel (Procedure and Administration).
[FR Doc. E7–16080 Filed 8–15–07; 8:45 am]
BILLING CODE 4830–01–P
Need for Correction
As published, proposed regulations
(REG–142039–06 and REG–139268–06)
contain errors that may prove to be
misleading and are in need of
clarification.
Correction of Publication
Accordingly, the publication of the
proposed regulations (REG–142039–06
and REG–139268–06) which were the
subjects of FR Doc.E7–12902), is
corrected as follows:
§ 53.4965–4
[Corrected]
1. On page 36933, column 1,
§ 53.4365–4(c) Example 2., line 12 of the
paragraph, the language ‘‘by Notice
2006–16 (2006–9 IRB 538). The’’ is
corrected to read ‘‘by Notice 2006–16
(2006–9 IRB 538)). The’’.
§ 53.4965–8
[Corrected]
2. On page 36936, column 3,
§ 53.4965–8(e), line 2 of the paragraph,
the language ‘‘periods. If a transaction
(other than a’’ is corrected to read
‘‘periods. If a transaction other than a’’.
PART 301—PROCEDURE AND
ADMINISTRATION
3. On page 36938, column 1,
paragraph 8, line 2, the language ‘‘301
continues to read, part, as follows:’’ is
corrected to read ‘‘301 continues to
read, in part, as follows:’’.
rwilkins on PROD1PC63 with PROPOSALS
§ 301.6011(g)–1
[Corrected]
4. On page 36938, column 1,
§ 301.6011(g)–1(a)(2)(i), line 4 of the
paragraph, the language ‘‘of its taxexempt, tax-indifferent or tax-’’ is
corrected to read ‘‘of its tax-exempt, tax
indifferent or tax-’’.
5. On page 36938, column 1,
§ 301.6011(g)–1(a)(2)(ii), line 3 of the
paragraph, the language ‘‘exempt, taxindifferent or tax-favored’’ is corrected
to read ‘‘exempt, tax indifferent or taxfavored’’.
§ 301.6033–5
[Corrected]
6. On page 36939, column 1,
§ 301.6033–5, line 1 of the paragraph,
the language ‘‘[The text of this section
is the same’’ is corrected to read ‘‘[The
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
DEPARTMENT OF AGRICULTURE
Forest Service
36 CFR Part 220
RIN 0596–AC49
National Environmental Policy Act
Procedures
Forest Service, USDA.
Notice of proposed rule; request
for comment.
AGENCY:
ACTION:
SUMMARY: The Forest Service is
proposing to move its National
Environmental Policy Act (NEPA)
implementing procedures from Forest
Service Manual (FSM) 1950 and Forest
Service Handbook (FSH) 1909.15 to 36
Code of Federal Regulations, part 220
(36 CFR 220). The Agency also proposes
to clarify existing NEPA procedures and
add new procedures to incorporate
Council on Environmental Quality
(CEQ) guidance and to better align
Agency NEPA procedures with Agency
decision processes.
Agency explanatory guidance
interpreting CEQ and Agency
procedures in regulation will remain in
FSH 1909.15. Agency NEPA authority,
objectives, policy, and responsibilities
will remain in FSM 1950.
This rule would meet 40 CFR 1507.3
by placing Agency-implementing
procedures in their proper regulatory
position. Maintaining Agency
explanatory guidance in directives
would facilitate timely Agency
responses to new ideas, new
information, procedural interpretations,
training needs, and editorial changes to
assist field units when implementing
the NEPA process. Finally, the proposed
changes to the Forest Service NEPA
procedures are intended to provide an
environmental analysis process that fits
better with modern thinking on
decisionmaking, collaboration, and
adaptive management to meet the intent
of NEPA through establishing
incremental alternative development,
and adaptive management principles.
DATES: Comments must be received in
writing by October 15, 2007.
ADDRESSES: Comments concerning this
notice should be sent by e-mail to
PO 00000
Frm 00051
Fmt 4702
Sfmt 4702
fsnepa@contentanalysisgroup.com, or
by facsimile to 801–397–2601, or via the
U.S. Postal Service to: NEPA
Implementation Procedures, C/O
Content Analysis Group, 1584 South
500 West, Suite 201, Woods Cross, UT
84010. Electronic or facsimile comments
are preferred. If comments are sent via
U.S. Postal Service, please do not
submit duplicate electronic or facsimile
comments. Please confine comments to
the proposed move of existing NEPA
procedures from FSH to regulation,
proposed changes to existing NEPA
procedures, and proposed new NEPA
procedures and explain the reasons for
any recommended changes.
All comments, including names and
addresses when provided, are placed in
the record and are available for public
inspection and copying.
FOR FURTHER INFORMATION CONTACT: Joe
Carbone, Ecosystem Management Staff,
(202) 205–0884, Forest Service, USDA.
Individuals who use telecommunication
devices for the deaf (TDD) may call the
Federal Information Relay Service
(FIRS) at 1–800–877–8339 between 8
a.m. and 8 p.m. Eastern Standard Time,
Monday through Friday.
SUPPLEMENTARY INFORMATION:
Background and Need for the Proposed
Rule
Council on Environmental Quality
(CEQ) regulations at 40 CFR 1507.3
require Federal agencies to adopt
procedures as necessary to supplement
CEQ’s regulations implementing the
National Environmental Policy Act
(NEPA) and to consult with CEQ during
their development and prior to
publication in the Federal Register. The
regulation further encourages agencies
to publish agency explanatory guidance
for CEQ’s regulations and agency
procedures.
In 1979, the Forest Service chose to
combine its implementing procedures
and explanatory guidance in Agency
directives (Forest Service Manual 1950
and Forest Service Handbook 1909.15).
The blending of NEPA implementing
procedures with explanatory guidance
requires the Forest Service to provide
for public notice and comment and to
consult with CEQ, as required by 40
CFR1507.3, when amending any
guidance for explaining CEQ or Agency
procedures, resulting in an increased
administrative burden for the Agency
and CEQ.
This proposal would meet the intent
of 40 CFR 1507.3 by placing Agencyimplementing procedures in their
proper regulatory position. Placing
Agency explanatory guidance in
directives would facilitate quicker
E:\FR\FM\16AUP1.SGM
16AUP1
rwilkins on PROD1PC63 with PROPOSALS
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
Agency responses to new ideas, new
information, procedural interpretations,
training needs, and editorial changes.
Since the last major update of Forest
Service NEPA policy in 1992, CEQ has
issued guidance the Agency wishes to
incorporate in its regulation. The
Agency also wants to incorporate
several concepts that are currently used,
but for which there are no explicit
provisions in the current procedures.
Finally, this proposal would allow for
better integrating of NEPA procedures
and documentation into current Agency
decisionmaking processes, including
collaborative and incremental
decisionmaking.
Almost 30 years ago, CEQ stated in its
preamble to the final NEPA
implementing regulations (Nov. 29,
1978, 43 FR 55978) that the
Environmental Impact Statement (EIS)
has ‘‘tended to become an end in itself,
rather than a means to making better
decisions. They noted further; ‘‘One
serious problem with the administration
of NEPA has been the separation
between an agency’s NEPA process and
its decisionmaking process. In too many
cases bulky EISs have been prepared
and transmitted but not used by the
decision-maker.’’ The innovation at that
time was a new requirement for a
‘‘Record of Decision’’ (ROD) to show
‘‘how the EIS was used in arriving at the
decision.’’ At that time, CEQ broadened
the focus from emphasis on a single
document (EIS) to ‘‘emphasize the entire
NEPA process, from early planning
through assessment and EIS preparation
through decisions and provisions for
follow-up.’’ Today, after receiving
comments on a draft EIS, agencies
prepare a final EIS and document their
decision in a ROD, tying the analysis
from the EIS to the final agency
decision.
Almost 20 years later, a CEQ report,
‘‘The National Environmental Policy
Act—A Study of Its Effectiveness After
Twenty-five Years’’ (January 1997)
stated that ‘‘frequently NEPA takes too
long and costs too much, agencies make
decisions before hearing from the
public, documents are too long and
technical for many people to use’’ and
according to Federal agency NEPA
liaisons, ‘‘the EIS process is still
frequently viewed as merely a
compliance requirement rather than as a
tool to effect better decision-making.
Because of this, millions of dollars,
years of time, and tons of paper have
been spent on documents that have little
effect on decisionmaking.’’ They point
out ‘‘some citizens’ groups and
concerned individuals view the NEPA
process as largely a one-way
communications track that does not use
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
their input effectively’’ and ‘‘when they
are invited to a formal scoping meeting
to discuss a well-developed project
about which they have heard little, they
may feel they have been invited too late
in the process.’’ Finally, the report
states, ‘‘some citizens complain that
their time and effort spent providing
good ideas are not reflected in changes
to proposals.’’
A 2005 National Environmental
Conflict Resolution Advisory Committee
(NECRAC) Report chartered by the U.S.
Institute for Environmental Conflict
Resolution of the Morris K. Udall
Foundation reflected further on the state
of the NEPA process 27 years after CEQ
published its regulations and
recommended furthering the evolution
of making section 102 procedural
requirements less an end in themselves
and more as a means to fulfill the
policies set out in section 101. The
report calls for improvements in the
‘‘traditional model for NEPA
implementation’’ where ‘‘agencies
announce their plans, share their
analyses of potential impacts of a range
of options, solicit public comment,
make decisions, deal with the fallout, if
any, and move on to the next project.’’
This model results in agency decisions
‘‘based on a collection of views and
interests’’ but ‘‘generally not a collective
decision.’’ The report goes on to state
that while not a failure, the traditional
model for NEPA ‘‘does not take full
advantage of the many strengths of
section 101.’’
The NECRAC recognized that
‘‘Americans expect to be able to work
things out and make things better over
time. It is not inevitable, and it is clearly
not desirable, that society’s ability to
constructively address and resolve
conflicts should languish or fail to adapt
to changing times. The current state of
environmental and natural resource
decision-making is dominated by the
traditional model, which too often fails
to capture the breadth and quality of the
values and purposes of NEPA.’’ The
Committee called for Federal
decisionmaking that ‘‘enables interested
parties’’ to ‘‘engage more effectively in
the decisionmaking process’’ where
‘‘interested parties are no longer merely
commenters on a Federal proposal, but
act as partners in defining Federal
plans, programs, and projects.’’
The Federal Government has placed
increasing emphasis on ‘‘cooperating
agencies’’ ‘‘cooperative conservation,’’
‘‘collaboration,’’ and ‘‘environmental
conflict resolution.’’ CEQ guidance and
direction on cooperating agencies and
environmental conflict resolution
includes:
PO 00000
Frm 00052
Fmt 4702
Sfmt 4702
45999
• CEQ Memorandum for Heads of
Federal Agencies: Designation of NonFederal Agencies to be Cooperating
Agencies in Implementing the
Procedural Requirements of NEPA, July
28, 1999;
• CEQ Memorandum for Heads of
Federal Agencies: Cooperating Agencies
in Implementing the Procedural
Requirements of the National
Environmental Policy Act, January 30,
2002; and
• CEQ & OMB Memorandum on
Environmental Conflict Resolution, 28
November 2005.
As a part of its continuing efforts to
improve the implementation of NEPA,
CEQ issued a NEPA Task Force report
in 2003 entitled ‘‘Modernizing NEPA
Implementation’’, which included
recommendations to further
collaboration in the NEPA process.
Other Federal efforts include Executive
Order 13352 on Facilitation of
Cooperative Conservation, August 26,
2004, and Forest Service continuing
emphasis on collaboration in Agency
planning, NEPA analysis and
decisionmaking (see https://
www.partnershipresourcecenter.org/
policy/ for a list of laws and Forest
Service policies related to
collaboration).
As the Forest Service integrates the
NEPA process and EIS into its
collaborative and cooperative
decisionmaking, the Agency needs an
option to provide EIS documentation
that reflects the way this interactive and
incremental decisionmaking occurs.
There is a need to ensure that the EIS
is used in ‘‘arriving at the decision.’’ In
order to do this, Forest Service NEPA
procedures need an option to reflect a
more modern environmental analysis
process that fits better with today’s
collaborative processes and is used
differently than the traditional NEPA
documentation model currently
assumes. A ‘‘one size fits all’’ approach
to NEPA documentation has not been
effective. The option of providing
documentation that reflects the
collaborative processes as described in
these procedures will allow the Forest
Service to document the analysis that
best fits the particular situation. As the
NECRAC Report points out, there
continues to be focus on preparing
NEPA documents such as an EIS or
environmental assessment (EA) for
litigation rather than to facilitate an
informed decision process. The
proposed NEPA documentation
requirements are intended to enable
interested parties to engage more
effectively in the decisionmaking
process rather than merely as
E:\FR\FM\16AUP1.SGM
16AUP1
rwilkins on PROD1PC63 with PROPOSALS
46000
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
commenters on proposals and
documents.
Rather than a document to be used
only for a final Agency decision, the EIS
could evolve as the decision evolves
incrementally and be useful throughout
the process. The EIS would then be used
as a tool to foster a collaborative and
incremental decision-making process
rather than an end in itself. The record
would reflect a history of how the
detailed statement was used in
collaborative and incremental
decisionmaking and the final draft and
final EISs would address a more
narrowly focused Agency action for a
final decision. The responsible official
will make available preliminary draft
and/or preliminary final EISs to keep
interested parties informed as the
analysis progresses. While the proposed
regulation does not require a decision to
be made collaboratively, it does allow
the Agency to meet the procedural
requirements of section 102 (2) of NEPA
while fostering fulfillment of the act’s
purpose in section 101.
Proposed NEPA procedures to allow
for better alignment of an EIS with
Agency decisionmaking include: (1)
Allowing proposals and alternative(s) to
be explored and modified throughout
the NEPA process (36 CFR 220.2 (e)),
and (2) allowing the circulation of
multiple preliminary detailed
statement(s) without filing requirements
(36 CFR 220.2(g)(2)).
The intent is to use environmental
information effectively by multiple
parties during the NEPA process rather
than only at distinct comment periods
for a draft and final impact statement.
This is to allow efficient and effective
use of an EIS to influence Agency
decisionmaking as interested parties
regularly exchange and discuss issues;
differences; and necessary
environmental, social, and economic
effects analyses while alternatives are
explored, evaluated, and modified
throughout the process. The intent is to
focus on a deliberative public process
and appropriate disclosure outlined in
section 102 of NEPA to promote the
act’s purposes.
The Agency is also proposing to
incorporate adaptive management into
its procedures. This would allow
procedural flexibility to manage natural
resources in light of uncertainties.
As Agency NEPA procedures are
being moved from the Forest Service
Directive System to the Code of Federal
Regulations, the following key changes
would be made:
• Clarify actions subject to NEPA by
summarizing the relevant CEQ
regulations in one place.
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
• Recognize Agency obligations to
take immediate emergency responses
and emphasize the options available for
subsequent proposals to address actions
related to the emergency when normal
NEPA processes are not possible.
• Incorporate CEQ guidance language
regarding what past actions are
‘‘relevant and useful’’ in illuminating or
predicting direct and indirect effects of
a proposed action when doing
cumulative effects analysis.
• Clarify that an alternative(s)
including the proposed action may be
modified through an incremental
process.
• Clarify that adaptive management
strategies may be incorporated into an
alternative(s), including the proposed
action.
• Incorporate CEQ guidance that
states EAs need only analyze the
proposed action if there are no
unresolved conflicts concerning
alterative uses of available resources.
Section-by-Section Description of
Proposed Changes
The majority of implementing
procedures found in FSH 1909.15 will
transfer to 36 CFR part 220 and remain
intact with organizational and
grammatical changes added to reflect
regulatory requirements. Rule
organization, additions to current
procedures, and significant changes to
current procedures are outlined below.
Agency explanatory guidance
interpreting CEQ regulations and this
rule will remain in FSH 1909.15.
CEQ guidance memos, court cases,
and Agency manual and handbook
direction can be reviewed at https://
www.fs.fed.us/emc/nepa.
Section 220.1 Purpose and Scope.
This section outlines the intent of the
rule and identifies to which authority
the rule is subject.
Section 220.2 Applicability. This
section establishes that all Agency
organizational elements are subject to
the rule.
Section 220.3 Definitions. This
section incorporates from FSH 1909.15
definitions for Decision Document,
Decision Memo, Decision Notice,
Environmentally Preferable Alternative,
and adds definitions for Adaptive
Management, Preliminary
Environmental Impact Statements,
Reasonably Foreseeable Future Actions,
and Responsible Official.
Section 220.4 General Requirements.
This section establishes procedures that
apply to NEPA documents. Paragraph
(a) Sets forth which Agency actions are
subject to NEPA requirements by
compiling pertinent sections from CEQ
regulations in one place. Paragraph (b)
PO 00000
Frm 00053
Fmt 4702
Sfmt 4702
clarifies expectations for Agency NEPA
compliance in the case of emergencies.
This section clarifies that responsible
officials can take immediate actions in
response to the immediate effects of
emergencies necessary to mitigate harm
to life, property, or important resources
without complying with the procedural
requirements of NEPA, the CEQ
regulations, or these proposed
regulations. Furthermore, responsible
officials can take urgent actions to
respond to the immediate effects of an
emergency when there is not sufficient
time to comply with the procedural
requirements of NEPA, the CEQ
regulations, or these proposed
regulations by consulting with the
Washington Office (and CEQ in cases
where the response action is expected to
have significant environmental impacts)
about alternative arrangements.
Paragraph (c) states how the NEPA
process is to be integrated with Agency
decisionmaking. Paragraph (d)
incorporates FSH language for the
Schedule of Proposed Actions.
Paragraph (e) incorporates FSH language
on scoping and further states that a
Schedule of Proposed Actions is not
intended to be used as the sole scoping
mechanism for a proposed action.
Paragraph (f) consolidates and amends
FSH language by incorporating CEQ
guidance of June 24, 2005, which
clarifies what past actions should be
considered in a cumulative effects
analysis. Paragraph (g) establishes
language on the management of
classified information. Paragraph (h)
establishes language on incorporation
by reference; and (i) clarifies situations
involving applicants.
Section 220.5 Environmental Impact
Statements (EIS). This section
incorporates language from chapter 20
of the FSH. Paragraph (a) lays the
foundation for which Agency actions
with significant environmental effects
normally require the preparation of an
EIS. Existing FSH language, establishing
specific classes of actions requiring an
EIS would be moved to the rule with the
exception of the present category for
EISs required by law or regulation. This
category is not needed as there are no
laws or regulations presently requiring
an EIS for a specific class of actions and
if there are any in the future, such laws
and regulations would apply regardless
of this rule. Also, the rule lists classes
of actions that ‘‘normally’’ require an
EIS rather than the current language
requiring an EIS. The change is
consistent with the CEQ regulations at
40 CFR 1507.3(b)(2)(i). Paragraph (b)
incorporates FSH language on the
development and content of a Notice of
E:\FR\FM\16AUP1.SGM
16AUP1
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
Intent. Paragraph (c) incorporates FSH
language on the cancellation of a Notice
of Intent. Paragraph (d) allows for
variation in content and format of an
EIS as long as it is consistent with CEQ
regulations. Paragraph (e) amends FSH
language on the development of
alternatives by establishing that:
(1) No specific number of alternatives
is required or prescribed;
(2) The No Action alternative may be
considered through the effects analysis
by contrasting the impacts of the
proposed action and an alternative(s)
with the current condition and expected
future condition;
(3) As the decisionmaking/analysis
process progresses an alternative(s),
including the proposed action, may be
modified through an incremental
process. This enhances the collaborative
decisionmaking process by allowing the
responsible official, interested and
affected persons, and agencies to make
appropriate adjustments to the
alternative(s) as the analysis progresses;
and
(4) Adaptive management strategies
may be incorporated into an
alternative(s), including the proposed
action. Adaptive management strategies
would be clearly articulated and the
effects of said strategies analyzed in the
document.
Paragraph (f) establishes language on
the documentation of environmental
effects related to incremental alternative
development and adaptive management.
Paragraph (g) amends FSH language on
circulating and filing the draft and final
EIS by including language that allows
for making multiple preliminary EIS(s)
available to the public. Paragraph (h)
incorporates FSH language on the
distribution of the record of decision.
Section 220.6 Categorical
Exclusions. This section incorporates
implementing language found in
chapter 30 of the FSH. The headings are
changed to be more explanatory but the
content remains the same as the current
FSH. No new categorical exclusions are
proposed.
Section 220.7 Environmental
Assessment (EA). This section
incorporates implementing language
found in chapter 40 of the FSH.
Paragraph (a) consolidates FSH language
outlining when an EA shall be prepared
and indicating that there is no standard
document format. Paragraph (b)
establishes new language outlining what
information shall be included in an EA
based on CEQ guidance; specifically an
EA must include: a description of the
need for the project; a description of the
proposed action and reasonable
alternative(s) that meet the proposal’s
need for action; a brief description of
analysis to determine whether to
prepare an EIS; and a list of Tribes,
agencies, and persons consulted.
Consistent with the National
Environmental Policy Act, Section
102(E) and 40 CFR 1501.2(c), when
there are no unresolved conflicts
concerning alternative uses of available
resources, the Agency need only analyze
the proposed action. While this
46001
provision is not intended to limit the
alternatives to be considered, it
recognizes situations where there are no
conflicts and therefore no compelling
need for alternatives. A stand-alone No
Action alternative is not required. The
environmental analysis may document
consideration of a no-action alternative
through the effects analysis by
contrasting the impacts of the proposed
action and any alternatives with the
current condition and expected future
condition if the proposed action were
not implemented. As the
decisionmaking/analysis process
progresses, the alternative(s), including
the proposed action, may be modified
through an incremental process. This
enhances the collaborative
decisionmaking process by allowing the
responsible official, interested and
affected persons, and agencies to make
appropriate adjustments to the
alternative(s) as the analysis progresses.
The modifications made during the
process should be documented and
available to the public and in the record.
Adaptive management strategies may be
incorporated into an alternative(s),
including the proposed action. Adaptive
management strategies should be clearly
articulated and the effects of said
strategies analyzed in the document.
Paragraph (c) incorporates FSH language
on content for a Decision Notice.
Paragraph (d) incorporates FSH
language on availability of the EA,
Decision Notice, and Finding of No
Significant Impact.
SIDE-BY-SIDE COMPARISON OF MAJOR CHANGES TO EXISTING PROCEDURES
Current procedures
Proposed procedures
Emergency Response [§ 220.4(b)]
Quotes CEQ regulation (1506.11) and directs Agency official to call the
Washington Office for other than fire suppression.
Clarifies responsibilities for initial actions related to an emergency as
well as proposals to address subsequent actions related to emergencies beyond initial response.
Cumulative Effects (Past Actions) [§ 220.4(e)]
Paraphrases CEQ definition of cumulative impacts and states that consideration must be given to past actions.
References CEQ guidance explaining that a past action must be ‘‘relevant and useful’’ in illuminating or predicting direct and indirect effects of a proposed action. (CEQ Memo, 6/24/05).
rwilkins on PROD1PC63 with PROPOSALS
Class of Actions Normally Requiring an EIS [§ 220.5(a)]
Identifies four classes: proposed actions where an EIS is required by
law or regulation; proposals to carry out or approve aerial application
of chemical pesticides; proposals that would substantially alter the
undeveloped character of an inventoried roadless area; and proposals for major Federal actions that may significantly affect the
quality of the human environment.
Existing classes of actions requiring an EIS are now listed as ‘‘normally’’ requiring an EIS. Existing class for EISs required by law or
regulation is no longer included as there are no specific classes of
actions that are currently required by law to prepare an EIS.
Format for an EIS [§ 220.5(d)]
Focusing on CEQ procedures
VerDate Aug<31>2005
18:05 Aug 15, 2007
References CEQ procedures.
Jkt 211001
PO 00000
Frm 00054
Fmt 4702
Sfmt 4702
E:\FR\FM\16AUP1.SGM
16AUP1
46002
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
SIDE-BY-SIDE COMPARISON OF MAJOR CHANGES TO EXISTING PROCEDURES—Continued
Current procedures
Proposed procedures
Alternative Development for an EIS [§ 220.5(e)]
Paraphrases CEQ regulations
Provides an option that alternative(s) and the proposed action may be
modified through an incremental process that must be documented
and available in the record. Alternative(s) may include an adaptive
management strategy that is clearly articulated, analyzed, and prespecified.
Environmental Effects [§ 220.5(f)]
Paraphrases CEQ regulations and is prescriptive on what to consider.
References CEQ requirements and describes that the responsible official must disclose any effects considered during the incremental development of an alternative(s) or adaptive management strategy.
Circulation of Preliminary EIS(s) [§ 220.5(g)(2)]
Does not specifically allow circulation of preliminary detailed statement(s).
Allows for the circulation of preliminary detailed statement(s).
Content for an EA [§ 220.7(b)]
Quotes CEQ regulation at 40 CFR 1508.9(b)
Regulatory Certification
rwilkins on PROD1PC63 with PROPOSALS
National Environmental Policy Act
The proposed rule would move
existing procedures for implementing
the National Environmental Policy Act
(NEPA) from Agency handbook to 36
CFR part 220 and provide additional
direction by regulation. The rule would
not directly impact the environment.
The CEQ does not direct agencies to
prepare a NEPA analysis or document
before establishing agency procedures
that supplement the CEQ regulations for
implementing NEPA. Agency NEPA
procedures are procedural guidance to
assist agencies in the fulfillment of
agency responsibilities under NEPA, but
are not the agency’s final determination
of what level of NEPA analysis is
required for a particular proposed
action. The requirements for
establishing agency NEPA procedures
are set forth at 40 CFR 1505.1 and
1507.3. The determination that
establishing agency NEPA procedures
does not require NEPA analysis and
documentation has been upheld in
Heartwood, Inc. v. U.S. Forest Service,
73 F. Supp. 2d 962, 972–73 (S.D. III.
1999), aff’d 230 F.3d 947. 954–55 (7th
Cir. 2000).
Regulatory Impact
This proposed rule has been reviewed
under USDA procedures and Executive
Order 12866, Regulatory Planning and
Review. It has been determined that this
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
Clarifies that when no unresolved conflicts concerning alternative uses
of available resources exist the Agency need only analyze the proposed action. An alternative(s), including the proposed action may
be modified through an incremental process. Adaptive management
strategies may be incorporated into an alternative(s). (CEQ memos
September 8, 2005, and December 9, 2002).
is not an economically significant
action. This action to issue agency
regulations will not have an annual
effect of $100 million or more on the
economy nor adversely affect
productivity, competition, jobs, the
environment, public health or safety,
nor State or local governments. This
action will not interfere with an action
taken or planned by another agency.
This action will not alter the budgetary
impact of entitlements, grants, user fees,
or loan programs or the rights and
obligations of recipients of such
programs. However, because of the
extensive interest in National Forest
System (NFS) planning and decisionmaking, this proposed rule to establish
Agency implementing procedures for
NEPA in the Code of Federal
Regulations has been designated as
significant and, therefore, is subject to
Office of Management and Budget
review under E.O. 12866.
In accordance with the Office of
Management and Budget (OMB)
Circular A–4, ‘‘Regulatory Analysis,’’ a
cost/benefit analysis was conducted.
The analysis compared the costs and
benefits associated with the current
condition of having Agency
implementing procedures combined
with Agency explanatory guidance in
Forest Service Handbook (FSH) and the
proposed condition of having
implementing direction in regulation
and explanatory guidance in FSH.
PO 00000
Frm 00055
Fmt 4702
Sfmt 4702
Many benefits and costs associated
with the proposed rule are not
quantifiable. Benefits, including
collaborative and participatory public
involvement to more fully address
public concerns, timely and focused
environmental analysis, flexibility in
preparation of environmental
documents, and improved legal
standing indicate a positive effect of the
new rule.
Moving implementing NEPA
procedures from the FSH to regulation
is expected to provide a variety of
potentially beneficial effects. The rule
would meet 40 CFR 1507.3 by placing
Agency-implementing procedures in
their proper regulatory position.
Maintaining Agency explanatory
guidance in the FSH would facilitate
timely Agency responses to new ideas,
new information, procedural
interpretations, training needs, and
editorial changes to addresses and
internet links to assist field units when
implementing the NEPA process.
Finally, the proposed changes to the
Forest Service NEPA procedures are
intended to provide the Forest Service
specific options to meet the intent of
NEPA through collaboration, the
establishment of incremental alternative
development, and the use of adaptive
management principles.
Based on the context of this analysis,
no one factor creates a significant factor,
but taken together does create the
E:\FR\FM\16AUP1.SGM
16AUP1
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
potential for visible improvements in
the Agency’s NEPA program.
Federalism
The Agency has considered this
proposed rule under the requirements of
Executive Order 13132, Federalism. The
Agency has concluded that the
proposed rule conforms with the
federalism principles set out in this
Executive Order; will not impose any
compliance costs on the states; and will
not have substantial direct effects on the
states or the relationship between the
national government and the states, or
on the distribution of power and
responsibilities among the various
levels of government. Therefore, the
Agency has determined that no further
assessment of federalism implications is
necessary.
Consultation and Coordination With
Indian Tribal Governments
Pursuant to Executive Order 13175 of
November 6, 2000, ‘‘Consultation and
Coordination with Indian Tribal
Governments’’, the Agency has assessed
the impact of this proposed rule on
Indian Tribal governments and has
determined that it does not significantly
or uniquely affect communities of
Indian Tribal governments. The
proposed rule deals with requirements
for NEPA analysis and has no direct
effect regarding the occupancy and use
of NFS land.
The Agency has also determined that
this proposed rule does not impose
substantial direct compliance costs on
Indian Tribal governments or preempt
Tribal law. Therefore, it has been
determined that this proposed rule does
not have Tribal implications requiring
advance consultation with Indian
Tribes.
rwilkins on PROD1PC63 with PROPOSALS
No Takings Implications
This proposed rule has been analyzed
in accordance with the principles and
criteria contained in Executive Order
12630, Governmental Actions and
Interference with Constitutionally
Protected Property Rights, and it has
been determined that the proposed rule
does not pose the risk of a taking of
protected private property.
Civil Justice Reform
This proposed rule has been reviewed
under Executive Order 12988 of
February 7, 1996, ‘‘Civil Justice
Reform’’. After adoption of this
proposed rule, (1) All State and local
laws and regulations that conflict with
this rule or that would impede full
implementation of this rule would be
preempted; (2) no retroactive effect
would be given to this proposed rule;
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
46003
and (3) the proposed rule would not
require the use of administrative
proceedings before parties could file
suit in court challenging its provisions.
Authority: 42 U.S.C. 4321 et seq.; E.O.
11514; 40 CFR parts 1500–1508; 7 CFR part
1b.
Unfunded Mandates
(a) Purpose. This part establishes
USDA Forest Service procedures for
compliance with the National
Environmental Policy Act (NEPA) of
1969 (42 U.S.C. 4321 et seq.) and the
Council on Environmental Quality
(CEQ) regulations for implementing the
procedural provisions of NEPA (40 CFR
parts 1500–1508).
(b) Scope. This part supplements, and
is to be used in conjunction with, the
CEQ regulations and U.S. Department of
Agriculture regulations at 7 CFR part 1b.
Pursuant to Title II of the Unfunded
Mandates Reform Act of 1995 (2 U.S.C.
1531–1538), which the President signed
into law on March 22, 1995, the Agency
has assessed the effects of this proposed
rule on State, local, and Tribal
governments and the private sector.
This proposed rule does not compel the
expenditure of $100 million or more by
any State, local, or Tribal government or
anyone in the private sector. Therefore,
a statement under section 202 of the act
is not required.
This proposed rule has been reviewed
under Executive Order 13211, Actions
Concerning Regulations That
Significantly Affect Energy Supply,
Distribution, or Use. It has been
determined that this proposed rule does
not constitute a significant energy action
as defined in the Executive order.
Controlling Paperwork Burdens on the
Public
This proposed rule does not contain
any additional record keeping or
reporting requirements or other
information collection requirements as
defined in 5 CFR part 1320 that are not
already required by law or not already
approved for use, and therefore,
imposes no additional paperwork
burden on the public. Accordingly, the
review provisions of the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501
et seq.) and its implementing
regulations at 5 CFR part 1320 do not
apply.
List of Subjects in 36 CFR Part 220
Administrative practice and
procedure, Environmental policy,
National forests.
Therefore, for the reasons set forth in
the preamble, the Forest Service
proposes to add part 220 to Title 36 of
the Code of Federal Regulations as
follows:
PART 220—NATIONAL
ENVIRONMENTAL POLICY ACT
(NEPA) COMPLIANCE
PO 00000
Purpose and scope.
Applicability.
Definitions.
General requirements.
Environmental impact statements.
Categorical exclusions.
Environmental assessment.
Frm 00056
Fmt 4702
§ 220.2
Purpose and Scope.
Applicability.
This part applies to all organizational
elements of the USDA Forest Service.
Energy Effects
Sec.
220.1
220.2
220.3
220.4
220.5
220.6
220.7
§ 220.1
Sfmt 4702
§ 220.3
Definitions.
The following definitions supplement
terms defined at 40 CFR parts 1500–
1508.
Adaptive management. A system of
management practices based on clearly
identified outcomes and monitoring to
determine if management actions are
meeting desired outcomes; and, if not,
facilitating management changes that
will best ensure that outcomes are met
or re-evaluated. Adaptive management
recognizes that knowledge about natural
resource systems is sometimes
uncertain.
Decision Document. A record of
decision, decision memo, or decision
notice.
Decision Memo. A concise written
record of the responsible official’s
decision to implement an action
categorically excluded from
documentation in an environmental
impact statement or environmental
assessment. A decision memo is
applicable to a prescribed set of
categories.
Decision Notice. A concise written
record of the responsible official’s
decision to implement an action when
an environmental assessment and
finding of no significant impact has
been prepared.
Environmentally Preferable
Alternative. The environmentally
preferable alternative is the alternative
that will best promote the national
environmental policy as expressed in
NEPA’s section 101. Ordinarily, this
means the alternative that causes the
least harm to the biological and physical
environment; it also means the
alternative which best protects and
preserves historic, cultural, and natural
resources.
Preliminary Environmental Impact
Statement. An interim environmental
E:\FR\FM\16AUP1.SGM
16AUP1
46004
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
document that a responsible official
may use to initiate discussion, solicit
comments, and inform interested parties
and agency personnel while proposals,
alternatives, and environmental effects
are explored and considered prior to
filing a draft or final environmental
impact statement. A preliminary
environmental impact statement is an
option available for responsible officials
to use and is not required.
Reasonably Foreseeable Future
Actions. Those activities not yet
undertaken, for which there are existing
decisions, funding, or identified
proposals.
Responsible Official. The Agency
employee who has the authority to make
and implement a decision on a
proposed action.
rwilkins on PROD1PC63 with PROPOSALS
§ 220.4
General Requirements.
(a) Proposed actions subject to the
National Environmental Policy Act
requirements (42 U.S.C. 4321 et seq.). A
Forest Service proposal is subject to the
National Environmental Policy Act
Requirements when all of the following
apply:
(1) The Forest Service has a goal and
is actively preparing to make a decision
on one or more alternative means of
accomplishing that goal (40 CFR
1508.23);
(2) The proposed action is subject to
Forest Service control and responsibility
(40 CFR 1508.18);
(3) The proposed action would cause
effects on the natural and physical
environment and the relationship of
people with that environment (40 CFR
1508.14) that can be meaningfully
evaluated (40 CFR 1508.23); and
(4) The proposed action is not
statutorily exempt from the
requirements of section 102(2) of the
National Environmental Policy Act.
(b) Emergency responses. (1) If the
responsible official determines that an
emergency exists that makes it
necessary to take emergency actions
before completing a NEPA analysis and
documentation in accordance with the
provisions in §§ 220.5 and 220.7, then
these provisions apply.
(2) The responsible official may take
emergency actions necessary to control
the immediate impacts of the emergency
to mitigate harm to life, property, or
important resources. When taking such
actions, the responsible official shall
take into account the probable
environmental consequences of the
emergency action and mitigate
foreseeable adverse environmental
effects to the extent practical.
(3) If the responsible official
determines that proposed emergency
actions beyond actions noted in
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
paragraph (b)(2) of this section are not
likely to have significant environmental
impacts, the responsible official shall
document that determination in an EA
and FONSI prepared in accordance with
these regulations, unless categorically
excluded (§ 220.6). If the responsible
official finds that the nature and scope
of the subsequent actions related to the
emergency require taking such proposed
actions prior to completing an EA and
FONSI, the responsible official shall
consult with the Washington Office
about alternative arrangements for
NEPA compliance. Consultation with
the Washington Office must be
coordinated through the appropriate
Regional Office.
(4) If the responsible official
determines that proposed emergency
actions beyond actions noted in
paragraph (b)(2) of this section are likely
to have significant environmental
impacts, then the responsible official
shall consult with CEQ, through the
appropriate Regional Office and the
Washington Office, about alternative
arrangements as soon as possible.
Alternative arrangements address the
proposed actions necessary to control
the immediate impacts of the
emergency. Other proposed actions
remain subject to NEPA analysis and
documentation in accordance with these
regulations.
(c) Agency Decisionmaking. (1) Forest
Service Manual 1906 outlines Agency
planning and decisionmaking. Forest
Service Manual 1950 identifies the
responsible official for the NEPA
process as the Agency employee who
has the delegated authority to make and
implement a decision on a proposed
action.
(2) For each Forest Service proposal
(§ 220.4(a)), the responsible official shall
coordinate and integrate NEPA review
and relevant environmental documents
with Agency decisionmaking by:
(i) Completing the environmental
document review before making a
decision on the proposal, consistent
with 40 CFR 1506.1;
(ii) Considering environmental
documents, public and Agency
comments (if any) on those documents,
and Agency responses to those
comments (40 CFR 1505.1(d));
(iii) Including environmental
documents, comments, and responses as
part of the administrative record (40
CFR 1505.1(c));
(iv) Considering the alternatives
analyzed in environmental document(s)
before rendering a decision on the
proposal; and
(v) Making a decision encompassed
within the range of alternatives
PO 00000
Frm 00057
Fmt 4702
Sfmt 4702
analyzed in the environmental
documents (40 CFR 1505.1(e)).
(d) Schedule of Proposed Actions. (1)
A Schedule of Proposed Actions shall
be published quarterly to inform
interested persons where to get
information about proposed Forest
Service actions, including the status of
environmental analyses.
(2) The Schedule of Proposed Actions
shall include proposals that will result
in Agency decision documents (§ 220.3).
(3) Actions proposed and decided
between scheduled publications shall be
identified in the next schedule.
(4) The Schedule of Proposed Actions
shall include a contact for additional
information on Forest Service proposals
and actions.
(e) Scoping (40 CFR 1501.7). (1)
Scoping is required for all Forest
Service proposed actions, including
those that would appear to be
categorically excluded from further
analysis and documentation in an
environmental assessment or an
environmental impact statement
(§ 220.6).
(2) Scoping shall be consistent with
40 CFR 1501.7. However, because the
nature and complexity of a proposed
action determine the scope and
intensity of analysis, no single scoping
technique is required or prescribed.
(3) The Schedule of Proposed Actions
is not intended to be used as the sole
scoping mechanism for a proposed
action.
(f) Cumulative Effects Considerations
of Past Actions (40 CFR 1508.7). In
accordance with The Council on
Environmental Quality Guidance
Memorandum on Consideration of Past
Actions in Cumulative Effects Analysis
dated June 24, 2005, the analysis of
cumulative effects begins with
consideration of the direct and indirect
effects on the environment that are
expected or likely to result from the
alternative proposals for agency action.
Agencies then look for present effects of
past actions that are, in the judgment of
the agency, relevant and useful because
they have a significant cause-and-effect
relationship with the direct and indirect
effects of the proposal for agency action
and its alternatives. CEQ regulations do
not require the consideration of the
individual effects of all past actions to
determine the present effects of past
actions. Once the agency has identified
those present effects of past actions that
warrant consideration, the agency
assesses the extent that the effects of the
proposal for agency action or its
alternatives will add to, modify, or
mitigate those effects. The final analysis
documents an agency assessment of the
cumulative effects of the actions
E:\FR\FM\16AUP1.SGM
16AUP1
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
rwilkins on PROD1PC63 with PROPOSALS
considered (including past, present, and
reasonable foreseeable future actions) on
the affected environment. With respect
to past actions, during the scoping
process and subsequent preparation of
the analysis, the agency must determine
what information regarding past actions
is useful and relevant to the required
analysis of cumulative effects.
Cataloging past actions and specific
information about the direct and
indirect effects of their design and
implementation could in some contexts
be useful to predict the cumulative
effects of the proposal. The CEQ
regulations, however, do not require
agencies to catalogue or exhaustively
list and analyze all individual past
actions. Simply because information
about past actions may be available or
obtained with reasonable effort does not
mean that it is relevant and necessary to
inform decisionmaking.
(g) Classified information (40 CFR
1507.3(c)). To the extent practicable, the
responsible official shall segregate any
information classified in accordance
with Executive order or statute. The
responsible official shall maintain the
confidentiality of such information in a
manner required for the information
involved. Such information may not be
included in any publicly disclosed
documents. If such material cannot be
reasonably segregated, or if segregation
would leave essentially meaningless
material, the responsible official must
withhold the entire analysis document
from the public; however, the
responsible official shall otherwise
prepare the analysis documentation in
accordance with applicable regulations.
(h) Incorporation by Reference.
Consistent with 40 CFR 1502.21,
material may be incorporated by
reference into any environmental or
decision document. This material must
be reasonably available to the public
and its contents briefly described in the
environmental or decision document.
(i) Applicants. The responsible
official shall make policies or staff
available to advise potential applicants
of studies or other information
foreseeably required for acceptance of
their applications. For situations
involving an applicant, the responsible
official should initiate the NEPA
process upon acceptance of an
application in accordance with 36 CFR
251.54(g).
§ 220.5
Environmental Impact Statements.
(a) Classes of Actions Normally
Requiring Environmental Impact
Statements—
(1) Class 1: Proposals to carry out or
to approve aerial application of
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
chemical pesticides on an operational
basis. Examples include:
(i) Applying chemical insecticides by
helicopter on an area infested with
spruce budworm to prevent serious
resource loss.
(ii) Authorizing the application of
herbicides by helicopter on a major
utility corridor to control unwanted
vegetation.
(iii) Applying herbicides by fixedwing aircraft on an area to release trees
from competing vegetation.
(2) Class 2: Proposals that would
substantially alter the undeveloped
character of an inventoried roadless
area of 5,000 acres or more (FSH
1909.12). Examples include:
(i) Constructing roads and harvesting
timber in a 56,000-acre inventoried
roadless area where the proposed road
and harvest units impact 3,000 acres in
only one part of the roadless area.
(ii) Constructing or reconstructing
water reservoir facilities in a 5,000-acre
unroaded area where flow regimens may
be substantially altered.
(iii) Approving a plan of operations
for a mine which would cause
considerable surface disturbance over
700 acres in a 10,000 acre roadless area.
(3) Class 3: Other proposals to take
major Federal actions that may
significantly affect the quality of the
human environment. Examples include:
(i) Approving the use of 1,500 acres of
National Forest System land to
construct and operate an all-season
recreation resort complex.
(ii) Authorizing the Bureau of Land
Management to offer the sale of leases
for oil and natural gas resources from
beneath 400,000 acres of National Forest
System lands that have historically
demonstrated a relatively high potential
for discovery and development of oil
and natural gas.
(iii) Approving the construction and
operation of an international gas
pipeline beneath a previously
undeveloped 30-mile long, 1,000-foot
wide corridor within an ecologically
sensitive area of National Forest System
land.
(b) Notice of Intent. A notice of intent
shall be prepared and published in the
Federal Register as soon as practicable
after deciding that an environmental
impact statement will be prepared. In
addition to the requirements of 40 CFR
1508.22, notices of intent must include
the following:
(1) Title of the responsible official(s);
(2) Any permits or licenses required
to implement the proposed action and
the issuing authority;
(3) Lead, joint lead, or cooperating
agencies if identified; and
(4) Address(es) to which comments
may be sent.
PO 00000
Frm 00058
Fmt 4702
Sfmt 4702
46005
(c) Withdrawal Notice. A withdrawal
notice must be published in the Federal
Register if, after publication of the
notice of intent or notice of availability,
an environmental impact statement is
no longer necessary. A withdrawal
notice must refer to the date and page
number of the previously published
notice.
(d) Environmental Impact Statement
Format and Content. The responsible
official may use any environmental
impact statement format and design as
long as the statement is in accordance
with 40 CFR 1502.10.
(e) Alternative(s). The environmental
impact statement shall document the
examination of reasonable alternatives
to the proposed action. Reasonable
alternatives should meet the purpose
and need and address one or more
significant issues (40 CFR 1501.7)
related to the proposed action. Since an
alternative may be developed to address
more than one significant issue, no
specific number of alternatives is
required or prescribed. In addition to
the requirements at 40 CFR 1502.14 the
responsible official has an option to use
the following procedures to develop and
analyze alternatives.
(1) The effects of the no-action
alternative may be documented by
contrasting the current condition and
expected future condition should the
proposed action not be undertaken with
the impacts of the proposed action and
any reasonable alternatives.
(2) To facilitate collaborative
processes and sound decisions, the
responsible official may collaborate
with interested parties to modify the
proposed action and alternative(s) under
consideration prior to issuing a draft
environmental impact statement. In
such cases, the responsible official may
consider the incremental changes as
alternatives considered. The
documentation of these incremental
changes to a proposed action or
alternatives may be incorporated by
reference in accordance with 40 CFR
1502.21 rather than duplicating the
description and analysis in the
statement.
(3) A proposed action or alternative(s)
may include adaptive management
strategies allowing for adjustment of the
action during implementation. If the
adjustments to an action are clearly
articulated and pre-specified in the
description of the alternative and fully
analyzed, then the action may be
adjusted during implementation
without the need for further analysis.
Adaptive management includes a
monitoring component, approved
adaptive actions that may be taken, and
E:\FR\FM\16AUP1.SGM
16AUP1
46006
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
environmental effects analysis for the
adaptive actions approved.
(f) Environmental Effects. In addition
to the environmental consequences
requirements at 40 CFR 1502.16, the EIS
must include the impacts considered
during any incremental alternative
development process and the
environmental effects of any adaptive
management strategy.
(g) Circulating and Filing Draft and
Final Environmental Impact Statements.
(1) The draft and final EISs shall be filed
with the Environmental Protection
Agency’s Office of Federal Activities in
Washington, DC (40 CFR 1506.9).
(2) If preliminary drafts are prepared
the responsible official shall make those
multiple preliminary draft and
preliminary final EISs available to those
interested and affected persons and
agencies for comment; however,
requirements at 40 CFR 1506.10 and 40
CFR 1502.19 shall only apply to the last
draft and final EIS.
(3) When the responsible official
determines that an extension of the
review period on a draft EIS is
appropriate, notice shall be given in the
same manner used for inviting
comments (40 CFR 1503.1) on the draft.
(h) Distribution of the Record of
Decision. The responsible official shall
notify interested or affected parties of
the availability of the record of decision
as soon as practical after signing.
rwilkins on PROD1PC63 with PROPOSALS
§ 220.6
Categorical Exclusions.
(a) General. A proposed action may be
categorically excluded from further
analysis and documentation in an EIS or
EA only if there are no extraordinary
circumstances related to the proposed
action and if:
(1) The proposed action is within one
of the categories established by the
Secretary at 7 CFR part 1b.3; or
(2) The proposed action is within a
category listed in section 220.6(d)(e).
(b) Resource conditions. (1) Resource
conditions that should be considered in
determining whether extraordinary
circumstances related to a proposed
action warrant further analysis and
documentation in an EA or an EIS are:
(i) Federally listed threatened or
endangered species or designated
critical habitat, species proposed for
Federal listing or proposed critical
habitat, or Forest Service sensitive
species.
(ii) Flood plains, wetlands, or
municipal watersheds.
(iii) Congressionally designated areas,
such as wilderness, wilderness study
areas, or national recreation areas.
(iv) Inventoried roadless areas.
(v) Research natural areas.
(vi) American Indians and Alaska
Native religious or cultural sites.
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
(vii) Archaeological sites, or historic
properties or areas.
(2) The mere presence of one or more
of these resource conditions does not
preclude use of a categorical exclusion
(CE). It is the existence of a cause-effect
relationship between a proposed action
and the potential effect on these
resource conditions and if such a
relationship exists, the degree of the
potential effect of a proposed action on
these resource conditions that
determines whether extraordinary
circumstances exist.
(c) Scoping. If the responsible official
determines, based on scoping, that it is
uncertain whether the proposed action
may have a significant effect on the
environment, prepare an EA. If the
responsible official determines, based
on scoping, that the proposed action
may have a significant environmental
effect, prepare an EIS.
(d) Categories of actions for which a
project or case file and decision memo
are not required. A supporting record
and a decision memo are not required,
but at the discretion of the responsible
official, may be prepared for the
following categories:
(1) Orders issued pursuant to 36 CFR
part 261—Prohibitions to provide shortterm resource protection or to protect
public health and safety. Examples
include but are not limited to:
(i) Closing a road to protect bighorn
sheep during lambing season.
(ii) Closing an area during a period of
extreme fire danger.
(2) Rules, regulations, or policies to
establish Service-wide administrative
procedures, program processes, or
instructions. Examples include but are
not limited to:
(i) Adjusting special use or recreation
fees using an existing formula.
(ii) Proposing a technical or scientific
method or procedure for screening
effects of emissions on air quality
related values in Class I wildernesses.
(iii) Proposing a policy to defer
payments on certain permits or
contracts to reduce the risk of default.
(iv) Proposing changes in contract
terms and conditions or terms and
conditions of special use authorizations.
(v) Establishing a Service-wide
process for responding to offers to
exchange land and for agreeing on land
values.
(vi) Establishing procedures for
amending or revising forest land and
resource management plans.
(3) Repair and maintenance of
administrative sites. Examples include
but are not limited to:
(i) Mowing lawns at a district office.
(ii) Replacing a roof or storage shed.
(iii) Painting a building.
PO 00000
Frm 00059
Fmt 4702
Sfmt 4702
(iv) Applying registered pesticides for
rodent or vegetation control.
(4) Repair and maintenance of roads,
trails, and landline boundaries.
Examples include but are not limited to:
(i) Authorizing a user to grade,
resurface, and clean the culverts of an
established National Forest System
road.
(ii) Grading a road and clearing the
roadside of brush without the use of
herbicides.
(iii) Resurfacing a road to its original
condition.
(iv) Pruning vegetation and cleaning
culverts along a trail and grooming the
surface of the trail.
(v) Surveying, painting, and posting
landline boundaries.
(5) Repair and maintenance of
recreation sites and facilities. Examples
include but are not limited to:
(i) Applying registered herbicides to
control poison ivy on infested sites in a
campground.
(ii) Applying registered insecticides
by compressed air sprayer to control
insects at a recreation site complex.
(iii) Repaving a parking lot.
(iv) Applying registered pesticides for
rodent or vegetation control.
(6) Acquisition of land or interest in
land. Examples include but are not
limited to:
(i) Accepting the donation of lands or
interests in land to the National Forest
System.
(ii) Purchasing fee, conservation
easement, reserved interest deed, or
other interests in lands.
(7) Sale or exchange of land or interest
in land and resources where resulting
land uses remain essentially the same.
Examples include but are not limited to:
(i) Selling or exchanging land
pursuant to the Small Tracts Act.
(ii) Exchanging National Forest
System lands or interests with a State
agency, local government, or other nonFederal party (individual or
organization) with similar resource
management objectives and practices.
(iii) Authorizing the Bureau of Land
Management to issue leases on
producing wells when mineral rights
revert to the United States from private
ownership and there is no change in
activity.
(iv) Exchange of administrative sites
involving other than National Forest
System lands.
(8) Approval, modification, or
continuation of minor, short-term (1
year or less) special uses of National
Forest System lands. Examples include
but are not limited to:
(i) Approving, on an annual basis, the
intermittent use and occupancy by a
State-licensed outfitter or guide.
E:\FR\FM\16AUP1.SGM
16AUP1
rwilkins on PROD1PC63 with PROPOSALS
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
(ii) Approving the use of National
Forest System land for apiaries.
(iii) Approving the gathering of forest
products for personal use.
(9) Issuance of a new permit for up to
the maximum tenure allowable under
the National Forest Ski Area Permit Act
of 1986 (16 U.S.C. 497b) for an existing
ski area when such issuance is a purely
ministerial action to account for
administrative changes, such as a
change in ownership of ski area
improvements, expiration of the current
permit, or a change in the statutory
authority applicable to the current
permit. Examples of actions in this
category include, but are not limited to:
(i) Issuing a permit to a new owner of
ski area improvements within an
existing ski area with no changes to the
master development plan, including no
changes to the facilities or activities for
that ski area.
(ii) Upon expiration of a ski area
permit, issuing a new permit to the
holder of the previous permit where the
holder is not requesting any changes to
the master development plan, including
changes to the facilities or activities.
(iii) Issuing a new permit under the
National Forest Ski Area Permit Act of
1986 to the holder of a permit issued
under the Term Permit and Organic
Acts, where there are no changes in the
type or scope of activities authorized
and no other changes in the master
development plan.
(10) Amendment to or replacement of
an existing special use authorization
that involves only administrative
changes and does not involve changes
in the authorized facilities or increase in
the scope or intensity of authorized
activities, or extensions to the term of
authorization, when the applicant or
holder is in full compliance with the
terms and conditions of the special use
authorization. Examples include but are
not limited to:
(i) Amending a special use
authorization to reflect administrative
changes such as adjustment to the land
use fees, inclusion of non-discretionary
environmental standards or updating a
special use authorization to bring it into
conformance with current laws or
regulations (for example, new
monitoring required by water quality
standards).
(ii) Issuance of a new special use
authorization to reflect administrative
changes such as, a change of ownership
or control of previously authorized
facilities or activities, or conversion of
the existing special use authorization to
a new type of special use authorization
(for example, converting a permit to a
lease or easement).
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
(e) Categories of actions for which a
project or case file and decision memo
are required. A supporting record is
required and the decision to proceed
must be documented in a decision
memo for the categories of action in
paragraphs (e)(1) through (e)16 of this
section. As a minimum, the project or
case file should include any records
prepared, such as: the names of
interested and affected people, groups,
and agencies contacted; the
determination that no extraordinary
circumstances exist; a copy of the
decision memo; and a list of the people
notified of the decision.
(1) Construction and reconstruction of
trails. Examples include but are not
limited to:
(i) Constructing or reconstructing a
trail to a scenic overlook.
(ii) Reconstructing an existing trail to
allow use by handicapped individuals.
(2) Additional construction or
reconstruction of existing telephone or
utility lines in a designated corridor.
Examples include but are not limited to:
(i) Replacing an underground cable
trunk and adding additional phone
lines.
(ii) Reconstructing a power line by
replacing poles and wires.
(3) Approval, modification, or
continuation of minor special uses of
National Forest System lands that
require less than five contiguous acres
of land. Examples include but are not
limited to:
(i) Approving the construction of a
meteorological sampling site.
(ii) Approving the use of land for a
one-time group event.
(iii) Approving the construction of
temporary facilities for filming of staged
or natural events or studies of natural or
cultural history.
(iv) Approving the use of land for a
40-foot utility corridor that crosses one
mile of a National Forest.
(v) Approving the installation of a
driveway, mailbox, or other facilities
incidental to use of a residence.
(vi) Approving an additional
telecommunication use at a site already
used for such purposes.
(vii) Approving the removal of
mineral materials from an existing
community pit or common-use area.
(viii) Approving the continued use of
land where such use has not changed
since authorized and no changes in the
physical environment or facilities are
proposed.
(4) Reserved.
(5) Regeneration of an area to native
tree species, including site preparation
that does not involve the use of
herbicides or result in vegetation type
conversion. Examples include but are
not limited to:
PO 00000
Frm 00060
Fmt 4702
Sfmt 4702
46007
(i) Planting seedlings of superior trees
in a progeny test site to evaluate genetic
worth.
(ii) Planting trees or mechanical seed
dispersal of native tree species
following a fire, flood, or landslide.
(6) Timber stand and/or wildlife
habitat improvement activities that do
not include the use of herbicides or do
not require more than one mile of low
standard road construction. Examples
include but are not limited to:
(i) Girdling trees to create snags.
(ii) Thinning or brush control to
improve growth or to reduce fire hazard
including the opening of an existing
road to a dense timber stand.
(iii) Prescribed burning to control
understory hardwoods in stands of
southern pine.
(iv) Prescribed burning to reduce
natural fuel build-up and improve plant
vigor.
(7) Modification or maintenance of
stream or lake aquatic habitat
improvement structures using native
materials or normal practices. Examples
include but are not limited to:
(i) Reconstructing a gabion with stone
from a nearby source.
(ii) Adding brush to lake fish beds.
(iii) Cleaning and resurfacing a fish
ladder at a hydroelectric dam.
(8) Short-term (1 year or less) mineral,
energy, or geophysical investigations
and their incidental support activities
that may require cross-country travel by
vehicles and equipment, construction of
less than one mile of low standard road,
or use and minor repair of existing
roads. Examples include but are not
limited to:
(i) Authorizing geophysical
investigations which use existing roads
that may require incidental repair to
reach sites for drilling core holes,
temperature gradient holes, or seismic
shot holes.
(ii) Gathering geophysical data using
shot hole, vibroseis, or surface charge
methods.
(iii) Trenching to obtain evidence of
mineralization.
(iv) Clearing vegetation for sight paths
or from areas used for investigation or
support facilities.
(v) Redesigning or rearranging surface
facilities within an approved site.
(vi) Approving interim and final site
restoration measures.
(vii) Approving a plan for exploration
which authorizes repair of an existing
road and the construction of one-third
mile of temporary road; clearing
vegetation from an acre of land for
trenches, drill pads, or support
facilities.
(9) Implementation or modification of
minor management practices to improve
E:\FR\FM\16AUP1.SGM
16AUP1
rwilkins on PROD1PC63 with PROPOSALS
46008
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
allotment condition or animal
distribution when an allotment
management plan is not yet in place.
Examples include but are not limited to:
(i) Rebuilding a fence to improve
animal distribution.
(ii) Adding a stock watering facility to
an existing water line.
(iii) Spot seeding native species of
grass or applying lime to maintain
forage condition.
(10) Hazardous fuels reduction
activities using prescribed fire, not to
exceed 4,500 acres; and mechanical
methods for crushing, piling, thinning,
pruning, cutting, chipping, mulching,
and mowing, not to exceed 1,000 acres.
Such activities:
(i) Shall be limited to areas:
(A) In the wildland-urban interface; or
(B) Condition Classes 2 or 3 in Fire
Regime Groups I, II, or III, outside the
wildland-urban interface.
(ii) Shall be identified through a
collaborative framework as described in
‘‘A Collaborative Approach for
Reducing Wildland Fire Risks to
Communities and Environment 10-Year
Comprehensive Strategy
Implementation Plan’’;
(iii) Shall be conducted consistent
with Agency and Departmental
procedures and applicable land and
resource management plans;
(iv) Shall not be conducted in
wilderness areas or impair the
suitability of wilderness study areas for
preservation as wilderness; and
(v) Shall not include the use of
herbicides or pesticides or the
construction of new permanent roads or
other new permanent infrastructure; and
may include the sale of vegetative
material if the primary purpose of the
activity is hazardous fuels reduction.
(11) Post-fire rehabilitation activities,
not to exceed 4,200 acres (such as tree
planting, fence replacement, habitat
restoration, heritage site restoration,
repair of roads and trails, and repair of
damage to minor facilities such as
campgrounds), to repair or improve
lands unlikely to recover to a
management approved condition from
wildland fire damage, or to repair or
replace minor facilities damaged by fire.
Such activities:
(i) Shall be conducted consistent with
Agency and Departmental procedures
and applicable land and resource
management plans;
(ii) Shall not include the use of
herbicides or pesticides or the
construction of new permanent roads or
other new permanent infrastructure; and
(iii) Shall be completed within 3 years
following a wildland fire.
(12) Harvest of live trees not to exceed
70 acres, requiring no more than 1⁄2 mile
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
of temporary road construction. Do not
use this category for even-aged
regeneration harvest or vegetation type
conversion. The proposed action may
include incidental removal of trees for
landings, skid trails, and road clearing.
Examples include but are not limited to:
(i) Removal of individual trees for
sawlogs, specialty products, or
fuelwood.
(ii) Commercial thinning of
overstocked stands to achieve the
desired stocking level to increase health
and vigor.
(13) Salvage of dead and/or dying
trees not to exceed 250 acres, requiring
no more than 1⁄2 mile of temporary road
construction. The proposed action may
include incidental removal of live or
dead trees for landings, skid trails, and
road clearing. Examples include but are
not limited to:
(i) Harvest of a portion of a stand
damaged by a wind or ice event and
construction of a short temporary road
to access the damaged trees.
(ii) Harvest of fire-damaged trees.
(14) Commercial and non-commercial
sanitation harvest of trees to control
insects or disease not to exceed 250
acres, requiring no more than 1⁄2 mile of
temporary road construction, including
removal of infested/infected trees and
adjacent live uninfested/uninfected
trees as determined necessary to control
the spread of insects or disease. The
proposed action may include incidental
removal of live or dead trees for
landings, skid trails, and road clearing.
Examples include but are not limited to:
(i) Felling and harvest of trees infested
with southern pine beetles and
immediately adjacent uninfested trees to
control expanding spot infestations.
(ii) Removal and/or destruction of
infested trees affected by a new exotic
insect or disease, such as emerald ash
borer, Asian long horned beetle, and
sudden oak death pathogen.
(15) Issuance of a new special use
authorization for a new term to replace
an existing or expired special use
authorization when the only changes are
administrative, there are not changes to
the authorized facilities or increases in
the scope or intensity of authorized
activities, and the applicant or holder is
in full compliance with the terms and
conditions of the special use
authorization.
(16) Land management plans, plan
amendments, and plan revisions
developed in accordance with 36 CFR
219.1 through 219.16 that provide broad
guidance and information for project
and activity decisionmaking in a
National Forest System unit. Proposals
for actions that approve projects and
activities, or that command anyone to
PO 00000
Frm 00061
Fmt 4702
Sfmt 4702
refrain from undertaking projects and
activities, or that grant, withhold or
modify contracts, permits or other
formal legal instruments, are outside the
scope of this category and shall be
considered separately under Forest
Service NEPA procedures.
(17) Approval of a Surface Use Plan
of Operations for oil and natural gas
exploration and initial development
activities, associated with or adjacent to
a new oil and/or gas field or area, so
long as the approval will not authorize
activities in excess of any of the
following:
(i) One mile of new road construction.
(ii) One mile of road reconstruction.
(iii) Three miles of individual or colocated pipelines and/or utilities
disturbance.
(iv) Four drill sites.
(f) Decision Memos. The responsible
official shall notify interested or affected
parties of the availability of the decision
memo as soon as practical after signing.
While sections may be combined or
rearranged in the interest of clarity and
brevity, decision memos must include
the following content:
(1) A heading, which must identify:
(i) Title of document: Decision Memo;
(ii) Agency and administrative unit;
(iii) Title of the proposed action; and
(iv) Location of the proposed action,
including administrative unit, county,
and State.
(2) Decision to be implemented and
the reasons for categorically excluding
the proposed action. Including:
(i) The category of the proposed
action.
(ii) The rationale for using the
category and, if more than one category
could have been used, why the specific
category was chosen.
(iii) A finding that no extraordinary
circumstances exist.
(3) Any interested and affected
agencies, organizations, and persons
contacted.
(4) Findings required by other laws
such as, but not limited to findings of
consistency with the forest land and
resource management plan as required
by the National Forest Management Act;
or a public interest determination (36
CFR 254.3(c)).
(5) The date when the responsible
official intends to implement the
decision and any conditions related to
implementation.
(6) Whether the decision is subject to
review or appeal, the applicable
regulations, and when and where to file
a request for review or appeal.
(7) Name, address, and phone number
of a contact person who can supply
further information about the decision.
(8) The responsible official’s signature
and date when the decision is made.
E:\FR\FM\16AUP1.SGM
16AUP1
Federal Register / Vol. 72, No. 158 / Thursday, August 16, 2007 / Proposed Rules
rwilkins on PROD1PC63 with PROPOSALS
§ 220.7
Environmental Assessment.
(a) Environment Assessment. An
environmental assessment (EA) shall be
prepared for proposals as described in
220.4(a) that are not categorically
excluded from documentation (§ 220.6)
and for which the need of an EIS has not
been determined (§ 220.5). An EA may
be prepared in any format useful to
facilitate planning, decisionmaking, and
public disclosure as long as the
requirements of this paragraph are met.
The EA may incorporate by reference
information that is reasonably available
to the public.
(b) An EA must include the following:
(1) Need for the proposal. The EA
must briefly describe the need for the
project.
(2) Proposed action and alternative(s).
The EA shall briefly describe the
proposed action and alternative(s) that
meet the need for action. No specific
number of alternatives is required or
prescribed.
(i) When there are no unresolved
conflicts concerning alternative uses of
available resources (NEPA, section
102(2)(E)), the EA need only analyze the
proposed action and proceed without
consideration of additional alternatives.
(ii) The EA may document
consideration of a no-action alternative
through the effects analysis by
contrasting the impacts of the proposed
action and any alternative(s) with the
current condition and expected future
condition if the proposed action were
not implemented.
(iii) The description of the proposal
and alternative(s) may include a brief
description of modifications and
incremental design features developed
through the analysis process to develop
the range of alternatives considered.
(iv) A proposed action or
alternative(s) may include adaptive
management strategies allowing for
adjustment of the action during
implementation. If the adjustments to an
action are clearly articulated and prespecified in the description of the
alternative and fully analyzed, then the
action may be adjusted during
implementation without the need for
further analysis. Adaptive management
includes a monitoring component,
approved adaptive actions that may be
taken, and environmental effects
analysis for the adaptive actions
approved.
(3) Environmental Impacts of the
Proposed Action and Alternative(s). The
EA:
(i) Shall briefly provide sufficient
evidence and analysis, including the
environmental impacts of the proposed
action and alternative(s), to determine
whether to prepare either an EIS or a
VerDate Aug<31>2005
17:19 Aug 15, 2007
Jkt 211001
finding of no significant impact (40 CFR
1508.9).
(ii) Shall disclose the environmental
effects of any adaptive management
strategy.
(iii) Shall describe impacts in terms of
context and intensity as described in the
definition of ‘‘significantly’’ at 40 CFR
1508.27.
(iv) May discuss the impact(s) (direct,
indirect, and cumulative) of alternatives
together in a comparative description or
describe the impacts of each alternative
separately.
(v) May incorporate by reference data,
inventories, other information and
analyses.
(4) Agencies and Persons Consulted.
(c) Decision Notice. If an EA and
finding of no significant impact (40 CFR
1508.13) have been prepared, the
responsible official must document a
decision to proceed with an action in a
decision notice unless law or regulation
requires another form of decision
documentation. Decision notices must
document the conclusions drawn and
the decision(s) made based on the
supporting record, including the EA and
finding of no significant impact. While
sections may be combined or rearranged
in the interest of clarity and brevity,
decision notices must include the
following content:
(1) A heading, which must identify:
(i) Title of document,
(ii) Agency and administrative unit,
(iii) Title of the project,
(iv) Location of the action, including
county, and State;
(2) Decision and rationale.
(3) Brief summary of public
involvement.
(4) Findings required by other laws
and regulations applicable to the
decision at the time of decision. The
responsible official must:
(i) Cite the supporting record or
analysis document that contains the
information used to support the
findings;
(ii) Incorporate by reference the
finding of no significant impact if not
included with the decision notice; and
(iii) Describe how the decision is
consistent with applicable laws and
regulations.
(5) Implementation date. The
responsible official must identify the
decision’s expected implementation
date.
(6) Administrative review or appeal
opportunities. The responsible official
must state whether the decision is
subject to administrative review or
appeal, cite the applicable regulations,
and indicate when and where to file a
request for review or appeal.
(7) Contact person. The responsible
official must identify the name, address,
PO 00000
Frm 00062
Fmt 4702
Sfmt 4702
46009
and phone number of a contact person
who can supply additional information.
(8) Signature and Date. The
responsible official must sign and date
the decision notice.
(d) Notification. The responsible
official shall notify interested or affected
parties of the availability of the EA,
finding of no significant impact and
decision notice, as soon as practicable
after each document is signed.
Dated: August 8, 2007.
Sally Collins,
Associate Chief.
[FR Doc. E7–15867 Filed 8–15–07; 8:45 am]
BILLING CODE 3410–11–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 271
[FRL–8455–8]
Louisiana: Final Authorization of State
Hazardous Waste Management
Program Revisions
Environmental Protection
Agency (EPA).
ACTION: Proposed rule.
AGENCY:
SUMMARY: The State of Louisiana has
applied to EPA for Final Authorization
of changes to its hazardous waste
program under the Resource
Conservation and Recovery Act (RCRA).
EPA proposes to grant Final
Authorization to the State of Louisiana.
In the ‘‘Rules and Regulations’’ section
of this Federal Register, EPA is
authorizing the changes by an
immediate final rule. EPA did not make
a proposal prior to the immediate final
rule because we believe this action is
not controversial and do not expect
comments that oppose it. We have
explained the reasons for this
authorization in the preamble to the
immediate final rule. Unless we get
written comments which oppose this
authorization during the comment
period, the immediate final rule will
become effective on the date it
establishes, and we will not take further
action on this proposal. If we receive
comments that oppose this action, we
will withdraw the immediate final rule
and it will not take effect. We will then
respond to public comments in a later
final rule based on this proposal. You
may not have another opportunity for
comment. If you want to comment on
this action, you must do so at this time.
DATES: Send your written comments by
September 17, 2007.
ADDRESSES: Send written comments to
Alima Patterson, Region 6, Regional
E:\FR\FM\16AUP1.SGM
16AUP1
Agencies
[Federal Register Volume 72, Number 158 (Thursday, August 16, 2007)]
[Proposed Rules]
[Pages 45998-46009]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-15867]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Forest Service
36 CFR Part 220
RIN 0596-AC49
National Environmental Policy Act Procedures
AGENCY: Forest Service, USDA.
ACTION: Notice of proposed rule; request for comment.
-----------------------------------------------------------------------
SUMMARY: The Forest Service is proposing to move its National
Environmental Policy Act (NEPA) implementing procedures from Forest
Service Manual (FSM) 1950 and Forest Service Handbook (FSH) 1909.15 to
36 Code of Federal Regulations, part 220 (36 CFR 220). The Agency also
proposes to clarify existing NEPA procedures and add new procedures to
incorporate Council on Environmental Quality (CEQ) guidance and to
better align Agency NEPA procedures with Agency decision processes.
Agency explanatory guidance interpreting CEQ and Agency procedures
in regulation will remain in FSH 1909.15. Agency NEPA authority,
objectives, policy, and responsibilities will remain in FSM 1950.
This rule would meet 40 CFR 1507.3 by placing Agency-implementing
procedures in their proper regulatory position. Maintaining Agency
explanatory guidance in directives would facilitate timely Agency
responses to new ideas, new information, procedural interpretations,
training needs, and editorial changes to assist field units when
implementing the NEPA process. Finally, the proposed changes to the
Forest Service NEPA procedures are intended to provide an environmental
analysis process that fits better with modern thinking on
decisionmaking, collaboration, and adaptive management to meet the
intent of NEPA through establishing incremental alternative
development, and adaptive management principles.
DATES: Comments must be received in writing by October 15, 2007.
ADDRESSES: Comments concerning this notice should be sent by e-mail to
fsnepa@contentanalysisgroup.com, or by facsimile to 801-397-2601, or
via the U.S. Postal Service to: NEPA Implementation Procedures, C/O
Content Analysis Group, 1584 South 500 West, Suite 201, Woods Cross, UT
84010. Electronic or facsimile comments are preferred. If comments are
sent via U.S. Postal Service, please do not submit duplicate electronic
or facsimile comments. Please confine comments to the proposed move of
existing NEPA procedures from FSH to regulation, proposed changes to
existing NEPA procedures, and proposed new NEPA procedures and explain
the reasons for any recommended changes.
All comments, including names and addresses when provided, are
placed in the record and are available for public inspection and
copying.
FOR FURTHER INFORMATION CONTACT: Joe Carbone, Ecosystem Management
Staff, (202) 205-0884, Forest Service, USDA. Individuals who use
telecommunication devices for the deaf (TDD) may call the Federal
Information Relay Service (FIRS) at 1-800-877-8339 between 8 a.m. and 8
p.m. Eastern Standard Time, Monday through Friday.
SUPPLEMENTARY INFORMATION:
Background and Need for the Proposed Rule
Council on Environmental Quality (CEQ) regulations at 40 CFR 1507.3
require Federal agencies to adopt procedures as necessary to supplement
CEQ's regulations implementing the National Environmental Policy Act
(NEPA) and to consult with CEQ during their development and prior to
publication in the Federal Register. The regulation further encourages
agencies to publish agency explanatory guidance for CEQ's regulations
and agency procedures.
In 1979, the Forest Service chose to combine its implementing
procedures and explanatory guidance in Agency directives (Forest
Service Manual 1950 and Forest Service Handbook 1909.15). The blending
of NEPA implementing procedures with explanatory guidance requires the
Forest Service to provide for public notice and comment and to consult
with CEQ, as required by 40 CFR1507.3, when amending any guidance for
explaining CEQ or Agency procedures, resulting in an increased
administrative burden for the Agency and CEQ.
This proposal would meet the intent of 40 CFR 1507.3 by placing
Agency-implementing procedures in their proper regulatory position.
Placing Agency explanatory guidance in directives would facilitate
quicker
[[Page 45999]]
Agency responses to new ideas, new information, procedural
interpretations, training needs, and editorial changes.
Since the last major update of Forest Service NEPA policy in 1992,
CEQ has issued guidance the Agency wishes to incorporate in its
regulation. The Agency also wants to incorporate several concepts that
are currently used, but for which there are no explicit provisions in
the current procedures.
Finally, this proposal would allow for better integrating of NEPA
procedures and documentation into current Agency decisionmaking
processes, including collaborative and incremental decisionmaking.
Almost 30 years ago, CEQ stated in its preamble to the final NEPA
implementing regulations (Nov. 29, 1978, 43 FR 55978) that the
Environmental Impact Statement (EIS) has ``tended to become an end in
itself, rather than a means to making better decisions. They noted
further; ``One serious problem with the administration of NEPA has been
the separation between an agency's NEPA process and its decisionmaking
process. In too many cases bulky EISs have been prepared and
transmitted but not used by the decision-maker.'' The innovation at
that time was a new requirement for a ``Record of Decision'' (ROD) to
show ``how the EIS was used in arriving at the decision.'' At that
time, CEQ broadened the focus from emphasis on a single document (EIS)
to ``emphasize the entire NEPA process, from early planning through
assessment and EIS preparation through decisions and provisions for
follow-up.'' Today, after receiving comments on a draft EIS, agencies
prepare a final EIS and document their decision in a ROD, tying the
analysis from the EIS to the final agency decision.
Almost 20 years later, a CEQ report, ``The National Environmental
Policy Act--A Study of Its Effectiveness After Twenty-five Years''
(January 1997) stated that ``frequently NEPA takes too long and costs
too much, agencies make decisions before hearing from the public,
documents are too long and technical for many people to use'' and
according to Federal agency NEPA liaisons, ``the EIS process is still
frequently viewed as merely a compliance requirement rather than as a
tool to effect better decision-making. Because of this, millions of
dollars, years of time, and tons of paper have been spent on documents
that have little effect on decisionmaking.'' They point out ``some
citizens' groups and concerned individuals view the NEPA process as
largely a one-way communications track that does not use their input
effectively'' and ``when they are invited to a formal scoping meeting
to discuss a well-developed project about which they have heard little,
they may feel they have been invited too late in the process.''
Finally, the report states, ``some citizens complain that their time
and effort spent providing good ideas are not reflected in changes to
proposals.''
A 2005 National Environmental Conflict Resolution Advisory
Committee (NECRAC) Report chartered by the U.S. Institute for
Environmental Conflict Resolution of the Morris K. Udall Foundation
reflected further on the state of the NEPA process 27 years after CEQ
published its regulations and recommended furthering the evolution of
making section 102 procedural requirements less an end in themselves
and more as a means to fulfill the policies set out in section 101. The
report calls for improvements in the ``traditional model for NEPA
implementation'' where ``agencies announce their plans, share their
analyses of potential impacts of a range of options, solicit public
comment, make decisions, deal with the fallout, if any, and move on to
the next project.'' This model results in agency decisions ``based on a
collection of views and interests'' but ``generally not a collective
decision.'' The report goes on to state that while not a failure, the
traditional model for NEPA ``does not take full advantage of the many
strengths of section 101.''
The NECRAC recognized that ``Americans expect to be able to work
things out and make things better over time. It is not inevitable, and
it is clearly not desirable, that society's ability to constructively
address and resolve conflicts should languish or fail to adapt to
changing times. The current state of environmental and natural resource
decision-making is dominated by the traditional model, which too often
fails to capture the breadth and quality of the values and purposes of
NEPA.'' The Committee called for Federal decisionmaking that ``enables
interested parties'' to ``engage more effectively in the decisionmaking
process'' where ``interested parties are no longer merely commenters on
a Federal proposal, but act as partners in defining Federal plans,
programs, and projects.''
The Federal Government has placed increasing emphasis on
``cooperating agencies'' ``cooperative conservation,''
``collaboration,'' and ``environmental conflict resolution.'' CEQ
guidance and direction on cooperating agencies and environmental
conflict resolution includes:
CEQ Memorandum for Heads of Federal Agencies: Designation
of Non-Federal Agencies to be Cooperating Agencies in Implementing the
Procedural Requirements of NEPA, July 28, 1999;
CEQ Memorandum for Heads of Federal Agencies: Cooperating
Agencies in Implementing the Procedural Requirements of the National
Environmental Policy Act, January 30, 2002; and
CEQ & OMB Memorandum on Environmental Conflict Resolution,
28 November 2005.
As a part of its continuing efforts to improve the implementation
of NEPA, CEQ issued a NEPA Task Force report in 2003 entitled
``Modernizing NEPA Implementation'', which included recommendations to
further collaboration in the NEPA process. Other Federal efforts
include Executive Order 13352 on Facilitation of Cooperative
Conservation, August 26, 2004, and Forest Service continuing emphasis
on collaboration in Agency planning, NEPA analysis and decisionmaking
(see https://www.partnershipresourcecenter.org/policy/ for a list of
laws and Forest Service policies related to collaboration).
As the Forest Service integrates the NEPA process and EIS into its
collaborative and cooperative decisionmaking, the Agency needs an
option to provide EIS documentation that reflects the way this
interactive and incremental decisionmaking occurs. There is a need to
ensure that the EIS is used in ``arriving at the decision.'' In order
to do this, Forest Service NEPA procedures need an option to reflect a
more modern environmental analysis process that fits better with
today's collaborative processes and is used differently than the
traditional NEPA documentation model currently assumes. A ``one size
fits all'' approach to NEPA documentation has not been effective. The
option of providing documentation that reflects the collaborative
processes as described in these procedures will allow the Forest
Service to document the analysis that best fits the particular
situation. As the NECRAC Report points out, there continues to be focus
on preparing NEPA documents such as an EIS or environmental assessment
(EA) for litigation rather than to facilitate an informed decision
process. The proposed NEPA documentation requirements are intended to
enable interested parties to engage more effectively in the
decisionmaking process rather than merely as
[[Page 46000]]
commenters on proposals and documents.
Rather than a document to be used only for a final Agency decision,
the EIS could evolve as the decision evolves incrementally and be
useful throughout the process. The EIS would then be used as a tool to
foster a collaborative and incremental decision-making process rather
than an end in itself. The record would reflect a history of how the
detailed statement was used in collaborative and incremental
decisionmaking and the final draft and final EISs would address a more
narrowly focused Agency action for a final decision. The responsible
official will make available preliminary draft and/or preliminary final
EISs to keep interested parties informed as the analysis progresses.
While the proposed regulation does not require a decision to be made
collaboratively, it does allow the Agency to meet the procedural
requirements of section 102 (2) of NEPA while fostering fulfillment of
the act's purpose in section 101.
Proposed NEPA procedures to allow for better alignment of an EIS
with Agency decisionmaking include: (1) Allowing proposals and
alternative(s) to be explored and modified throughout the NEPA process
(36 CFR 220.2 (e)), and (2) allowing the circulation of multiple
preliminary detailed statement(s) without filing requirements (36 CFR
220.2(g)(2)).
The intent is to use environmental information effectively by
multiple parties during the NEPA process rather than only at distinct
comment periods for a draft and final impact statement. This is to
allow efficient and effective use of an EIS to influence Agency
decisionmaking as interested parties regularly exchange and discuss
issues; differences; and necessary environmental, social, and economic
effects analyses while alternatives are explored, evaluated, and
modified throughout the process. The intent is to focus on a
deliberative public process and appropriate disclosure outlined in
section 102 of NEPA to promote the act's purposes.
The Agency is also proposing to incorporate adaptive management
into its procedures. This would allow procedural flexibility to manage
natural resources in light of uncertainties.
As Agency NEPA procedures are being moved from the Forest Service
Directive System to the Code of Federal Regulations, the following key
changes would be made:
Clarify actions subject to NEPA by summarizing the
relevant CEQ regulations in one place.
Recognize Agency obligations to take immediate emergency
responses and emphasize the options available for subsequent proposals
to address actions related to the emergency when normal NEPA processes
are not possible.
Incorporate CEQ guidance language regarding what past
actions are ``relevant and useful'' in illuminating or predicting
direct and indirect effects of a proposed action when doing cumulative
effects analysis.
Clarify that an alternative(s) including the proposed
action may be modified through an incremental process.
Clarify that adaptive management strategies may be
incorporated into an alternative(s), including the proposed action.
Incorporate CEQ guidance that states EAs need only analyze
the proposed action if there are no unresolved conflicts concerning
alterative uses of available resources.
Section-by-Section Description of Proposed Changes
The majority of implementing procedures found in FSH 1909.15 will
transfer to 36 CFR part 220 and remain intact with organizational and
grammatical changes added to reflect regulatory requirements. Rule
organization, additions to current procedures, and significant changes
to current procedures are outlined below.
Agency explanatory guidance interpreting CEQ regulations and this
rule will remain in FSH 1909.15.
CEQ guidance memos, court cases, and Agency manual and handbook
direction can be reviewed at https://www.fs.fed.us/emc/nepa.
Section 220.1 Purpose and Scope. This section outlines the intent
of the rule and identifies to which authority the rule is subject.
Section 220.2 Applicability. This section establishes that all
Agency organizational elements are subject to the rule.
Section 220.3 Definitions. This section incorporates from FSH
1909.15 definitions for Decision Document, Decision Memo, Decision
Notice, Environmentally Preferable Alternative, and adds definitions
for Adaptive Management, Preliminary Environmental Impact Statements,
Reasonably Foreseeable Future Actions, and Responsible Official.
Section 220.4 General Requirements. This section establishes
procedures that apply to NEPA documents. Paragraph (a) Sets forth which
Agency actions are subject to NEPA requirements by compiling pertinent
sections from CEQ regulations in one place. Paragraph (b) clarifies
expectations for Agency NEPA compliance in the case of emergencies.
This section clarifies that responsible officials can take immediate
actions in response to the immediate effects of emergencies necessary
to mitigate harm to life, property, or important resources without
complying with the procedural requirements of NEPA, the CEQ
regulations, or these proposed regulations. Furthermore, responsible
officials can take urgent actions to respond to the immediate effects
of an emergency when there is not sufficient time to comply with the
procedural requirements of NEPA, the CEQ regulations, or these proposed
regulations by consulting with the Washington Office (and CEQ in cases
where the response action is expected to have significant environmental
impacts) about alternative arrangements. Paragraph (c) states how the
NEPA process is to be integrated with Agency decisionmaking. Paragraph
(d) incorporates FSH language for the Schedule of Proposed Actions.
Paragraph (e) incorporates FSH language on scoping and further states
that a Schedule of Proposed Actions is not intended to be used as the
sole scoping mechanism for a proposed action. Paragraph (f)
consolidates and amends FSH language by incorporating CEQ guidance of
June 24, 2005, which clarifies what past actions should be considered
in a cumulative effects analysis. Paragraph (g) establishes language on
the management of classified information. Paragraph (h) establishes
language on incorporation by reference; and (i) clarifies situations
involving applicants.
Section 220.5 Environmental Impact Statements (EIS). This section
incorporates language from chapter 20 of the FSH. Paragraph (a) lays
the foundation for which Agency actions with significant environmental
effects normally require the preparation of an EIS. Existing FSH
language, establishing specific classes of actions requiring an EIS
would be moved to the rule with the exception of the present category
for EISs required by law or regulation. This category is not needed as
there are no laws or regulations presently requiring an EIS for a
specific class of actions and if there are any in the future, such laws
and regulations would apply regardless of this rule. Also, the rule
lists classes of actions that ``normally'' require an EIS rather than
the current language requiring an EIS. The change is consistent with
the CEQ regulations at 40 CFR 1507.3(b)(2)(i). Paragraph (b)
incorporates FSH language on the development and content of a Notice of
[[Page 46001]]
Intent. Paragraph (c) incorporates FSH language on the cancellation of
a Notice of Intent. Paragraph (d) allows for variation in content and
format of an EIS as long as it is consistent with CEQ regulations.
Paragraph (e) amends FSH language on the development of alternatives by
establishing that:
(1) No specific number of alternatives is required or prescribed;
(2) The No Action alternative may be considered through the effects
analysis by contrasting the impacts of the proposed action and an
alternative(s) with the current condition and expected future
condition;
(3) As the decisionmaking/analysis process progresses an
alternative(s), including the proposed action, may be modified through
an incremental process. This enhances the collaborative decisionmaking
process by allowing the responsible official, interested and affected
persons, and agencies to make appropriate adjustments to the
alternative(s) as the analysis progresses; and
(4) Adaptive management strategies may be incorporated into an
alternative(s), including the proposed action. Adaptive management
strategies would be clearly articulated and the effects of said
strategies analyzed in the document.
Paragraph (f) establishes language on the documentation of
environmental effects related to incremental alternative development
and adaptive management. Paragraph (g) amends FSH language on
circulating and filing the draft and final EIS by including language
that allows for making multiple preliminary EIS(s) available to the
public. Paragraph (h) incorporates FSH language on the distribution of
the record of decision.
Section 220.6 Categorical Exclusions. This section incorporates
implementing language found in chapter 30 of the FSH. The headings are
changed to be more explanatory but the content remains the same as the
current FSH. No new categorical exclusions are proposed.
Section 220.7 Environmental Assessment (EA). This section
incorporates implementing language found in chapter 40 of the FSH.
Paragraph (a) consolidates FSH language outlining when an EA shall be
prepared and indicating that there is no standard document format.
Paragraph (b) establishes new language outlining what information shall
be included in an EA based on CEQ guidance; specifically an EA must
include: a description of the need for the project; a description of
the proposed action and reasonable alternative(s) that meet the
proposal's need for action; a brief description of analysis to
determine whether to prepare an EIS; and a list of Tribes, agencies,
and persons consulted.
Consistent with the National Environmental Policy Act, Section
102(E) and 40 CFR 1501.2(c), when there are no unresolved conflicts
concerning alternative uses of available resources, the Agency need
only analyze the proposed action. While this provision is not intended
to limit the alternatives to be considered, it recognizes situations
where there are no conflicts and therefore no compelling need for
alternatives. A stand-alone No Action alternative is not required. The
environmental analysis may document consideration of a no-action
alternative through the effects analysis by contrasting the impacts of
the proposed action and any alternatives with the current condition and
expected future condition if the proposed action were not implemented.
As the decisionmaking/analysis process progresses, the alternative(s),
including the proposed action, may be modified through an incremental
process. This enhances the collaborative decisionmaking process by
allowing the responsible official, interested and affected persons, and
agencies to make appropriate adjustments to the alternative(s) as the
analysis progresses. The modifications made during the process should
be documented and available to the public and in the record. Adaptive
management strategies may be incorporated into an alternative(s),
including the proposed action. Adaptive management strategies should be
clearly articulated and the effects of said strategies analyzed in the
document. Paragraph (c) incorporates FSH language on content for a
Decision Notice. Paragraph (d) incorporates FSH language on
availability of the EA, Decision Notice, and Finding of No Significant
Impact.
Side-by-Side Comparison of Major Changes to Existing Procedures
----------------------------------------------------------------------------------------------------------------
Current procedures Proposed procedures
----------------------------------------------------------------------------------------------------------------
Emergency Response [Sec. 220.4(b)]
----------------------------------------------------------------------------------------------------------------
Quotes CEQ regulation (1506.11) and directs Agency Clarifies responsibilities for initial actions related
official to call the Washington Office for other than to an emergency as well as proposals to address
fire suppression. subsequent actions related to emergencies beyond
initial response.
----------------------------------------------------------------------------------------------------------------
Cumulative Effects (Past Actions) [Sec. 220.4(e)]
----------------------------------------------------------------------------------------------------------------
Paraphrases CEQ definition of cumulative impacts and References CEQ guidance explaining that a past action
states that consideration must be given to past must be ``relevant and useful'' in illuminating or
actions. predicting direct and indirect effects of a proposed
action. (CEQ Memo, 6/24/05).
----------------------------------------------------------------------------------------------------------------
Class of Actions Normally Requiring an EIS [Sec. 220.5(a)]
----------------------------------------------------------------------------------------------------------------
Identifies four classes: proposed actions where an EIS Existing classes of actions requiring an EIS are now
is required by law or regulation; proposals to carry listed as ``normally'' requiring an EIS. Existing
out or approve aerial application of chemical class for EISs required by law or regulation is no
pesticides; proposals that would substantially alter longer included as there are no specific classes of
the undeveloped character of an inventoried roadless actions that are currently required by law to prepare
area; and proposals for major Federal actions that may an EIS.
significantly affect the quality of the human
environment.
----------------------------------------------------------------------------------------------------------------
Format for an EIS [Sec. 220.5(d)]
----------------------------------------------------------------------------------------------------------------
Focusing on CEQ procedures References CEQ procedures.
----------------------------------------------------------------------------------------------------------------
[[Page 46002]]
Alternative Development for an EIS [Sec. 220.5(e)]
----------------------------------------------------------------------------------------------------------------
Paraphrases CEQ regulations Provides an option that alternative(s) and the proposed
action may be modified through an incremental process
that must be documented and available in the record.
Alternative(s) may include an adaptive management
strategy that is clearly articulated, analyzed, and
pre-specified.
----------------------------------------------------------------------------------------------------------------
Environmental Effects [Sec. 220.5(f)]
----------------------------------------------------------------------------------------------------------------
Paraphrases CEQ regulations and is prescriptive on what References CEQ requirements and describes that the
to consider.. responsible official must disclose any effects
considered during the incremental development of an
alternative(s) or adaptive management strategy.
----------------------------------------------------------------------------------------------------------------
Circulation of Preliminary EIS(s) [Sec. 220.5(g)(2)]
----------------------------------------------------------------------------------------------------------------
Does not specifically allow circulation of preliminary Allows for the circulation of preliminary detailed
detailed statement(s). statement(s).
----------------------------------------------------------------------------------------------------------------
Content for an EA [Sec. 220.7(b)]
----------------------------------------------------------------------------------------------------------------
Quotes CEQ regulation at 40 CFR 1508.9(b) Clarifies that when no unresolved conflicts concerning
alternative uses of available resources exist the
Agency need only analyze the proposed action. An
alternative(s), including the proposed action may be
modified through an incremental process. Adaptive
management strategies may be incorporated into an
alternative(s). (CEQ memos September 8, 2005, and
December 9, 2002).
----------------------------------------------------------------------------------------------------------------
Regulatory Certification
National Environmental Policy Act
The proposed rule would move existing procedures for implementing
the National Environmental Policy Act (NEPA) from Agency handbook to 36
CFR part 220 and provide additional direction by regulation. The rule
would not directly impact the environment. The CEQ does not direct
agencies to prepare a NEPA analysis or document before establishing
agency procedures that supplement the CEQ regulations for implementing
NEPA. Agency NEPA procedures are procedural guidance to assist agencies
in the fulfillment of agency responsibilities under NEPA, but are not
the agency's final determination of what level of NEPA analysis is
required for a particular proposed action. The requirements for
establishing agency NEPA procedures are set forth at 40 CFR 1505.1 and
1507.3. The determination that establishing agency NEPA procedures does
not require NEPA analysis and documentation has been upheld in
Heartwood, Inc. v. U.S. Forest Service, 73 F. Supp. 2d 962, 972-73
(S.D. III. 1999), aff'd 230 F.3d 947. 954-55 (7th Cir. 2000).
Regulatory Impact
This proposed rule has been reviewed under USDA procedures and
Executive Order 12866, Regulatory Planning and Review. It has been
determined that this is not an economically significant action. This
action to issue agency regulations will not have an annual effect of
$100 million or more on the economy nor adversely affect productivity,
competition, jobs, the environment, public health or safety, nor State
or local governments. This action will not interfere with an action
taken or planned by another agency. This action will not alter the
budgetary impact of entitlements, grants, user fees, or loan programs
or the rights and obligations of recipients of such programs. However,
because of the extensive interest in National Forest System (NFS)
planning and decision-making, this proposed rule to establish Agency
implementing procedures for NEPA in the Code of Federal Regulations has
been designated as significant and, therefore, is subject to Office of
Management and Budget review under E.O. 12866.
In accordance with the Office of Management and Budget (OMB)
Circular A-4, ``Regulatory Analysis,'' a cost/benefit analysis was
conducted. The analysis compared the costs and benefits associated with
the current condition of having Agency implementing procedures combined
with Agency explanatory guidance in Forest Service Handbook (FSH) and
the proposed condition of having implementing direction in regulation
and explanatory guidance in FSH.
Many benefits and costs associated with the proposed rule are not
quantifiable. Benefits, including collaborative and participatory
public involvement to more fully address public concerns, timely and
focused environmental analysis, flexibility in preparation of
environmental documents, and improved legal standing indicate a
positive effect of the new rule.
Moving implementing NEPA procedures from the FSH to regulation is
expected to provide a variety of potentially beneficial effects. The
rule would meet 40 CFR 1507.3 by placing Agency-implementing procedures
in their proper regulatory position. Maintaining Agency explanatory
guidance in the FSH would facilitate timely Agency responses to new
ideas, new information, procedural interpretations, training needs, and
editorial changes to addresses and internet links to assist field units
when implementing the NEPA process. Finally, the proposed changes to
the Forest Service NEPA procedures are intended to provide the Forest
Service specific options to meet the intent of NEPA through
collaboration, the establishment of incremental alternative
development, and the use of adaptive management principles.
Based on the context of this analysis, no one factor creates a
significant factor, but taken together does create the
[[Page 46003]]
potential for visible improvements in the Agency's NEPA program.
Federalism
The Agency has considered this proposed rule under the requirements
of Executive Order 13132, Federalism. The Agency has concluded that the
proposed rule conforms with the federalism principles set out in this
Executive Order; will not impose any compliance costs on the states;
and will not have substantial direct effects on the states or the
relationship between the national government and the states, or on the
distribution of power and responsibilities among the various levels of
government. Therefore, the Agency has determined that no further
assessment of federalism implications is necessary.
Consultation and Coordination With Indian Tribal Governments
Pursuant to Executive Order 13175 of November 6, 2000,
``Consultation and Coordination with Indian Tribal Governments'', the
Agency has assessed the impact of this proposed rule on Indian Tribal
governments and has determined that it does not significantly or
uniquely affect communities of Indian Tribal governments. The proposed
rule deals with requirements for NEPA analysis and has no direct effect
regarding the occupancy and use of NFS land.
The Agency has also determined that this proposed rule does not
impose substantial direct compliance costs on Indian Tribal governments
or preempt Tribal law. Therefore, it has been determined that this
proposed rule does not have Tribal implications requiring advance
consultation with Indian Tribes.
No Takings Implications
This proposed rule has been analyzed in accordance with the
principles and criteria contained in Executive Order 12630,
Governmental Actions and Interference with Constitutionally Protected
Property Rights, and it has been determined that the proposed rule does
not pose the risk of a taking of protected private property.
Civil Justice Reform
This proposed rule has been reviewed under Executive Order 12988 of
February 7, 1996, ``Civil Justice Reform''. After adoption of this
proposed rule, (1) All State and local laws and regulations that
conflict with this rule or that would impede full implementation of
this rule would be preempted; (2) no retroactive effect would be given
to this proposed rule; and (3) the proposed rule would not require the
use of administrative proceedings before parties could file suit in
court challenging its provisions.
Unfunded Mandates
Pursuant to Title II of the Unfunded Mandates Reform Act of 1995 (2
U.S.C. 1531-1538), which the President signed into law on March 22,
1995, the Agency has assessed the effects of this proposed rule on
State, local, and Tribal governments and the private sector. This
proposed rule does not compel the expenditure of $100 million or more
by any State, local, or Tribal government or anyone in the private
sector. Therefore, a statement under section 202 of the act is not
required.
Energy Effects
This proposed rule has been reviewed under Executive Order 13211,
Actions Concerning Regulations That Significantly Affect Energy Supply,
Distribution, or Use. It has been determined that this proposed rule
does not constitute a significant energy action as defined in the
Executive order.
Controlling Paperwork Burdens on the Public
This proposed rule does not contain any additional record keeping
or reporting requirements or other information collection requirements
as defined in 5 CFR part 1320 that are not already required by law or
not already approved for use, and therefore, imposes no additional
paperwork burden on the public. Accordingly, the review provisions of
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.) and its
implementing regulations at 5 CFR part 1320 do not apply.
List of Subjects in 36 CFR Part 220
Administrative practice and procedure, Environmental policy,
National forests.
Therefore, for the reasons set forth in the preamble, the Forest
Service proposes to add part 220 to Title 36 of the Code of Federal
Regulations as follows:
PART 220--NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE
Sec.
220.1 Purpose and scope.
220.2 Applicability.
220.3 Definitions.
220.4 General requirements.
220.5 Environmental impact statements.
220.6 Categorical exclusions.
220.7 Environmental assessment.
Authority: 42 U.S.C. 4321 et seq.; E.O. 11514; 40 CFR parts
1500-1508; 7 CFR part 1b.
Sec. 220.1 Purpose and Scope.
(a) Purpose. This part establishes USDA Forest Service procedures
for compliance with the National Environmental Policy Act (NEPA) of
1969 (42 U.S.C. 4321 et seq.) and the Council on Environmental Quality
(CEQ) regulations for implementing the procedural provisions of NEPA
(40 CFR parts 1500-1508).
(b) Scope. This part supplements, and is to be used in conjunction
with, the CEQ regulations and U.S. Department of Agriculture
regulations at 7 CFR part 1b.
Sec. 220.2 Applicability.
This part applies to all organizational elements of the USDA Forest
Service.
Sec. 220.3 Definitions.
The following definitions supplement terms defined at 40 CFR parts
1500-1508.
Adaptive management. A system of management practices based on
clearly identified outcomes and monitoring to determine if management
actions are meeting desired outcomes; and, if not, facilitating
management changes that will best ensure that outcomes are met or re-
evaluated. Adaptive management recognizes that knowledge about natural
resource systems is sometimes uncertain.
Decision Document. A record of decision, decision memo, or decision
notice.
Decision Memo. A concise written record of the responsible
official's decision to implement an action categorically excluded from
documentation in an environmental impact statement or environmental
assessment. A decision memo is applicable to a prescribed set of
categories.
Decision Notice. A concise written record of the responsible
official's decision to implement an action when an environmental
assessment and finding of no significant impact has been prepared.
Environmentally Preferable Alternative. The environmentally
preferable alternative is the alternative that will best promote the
national environmental policy as expressed in NEPA's section 101.
Ordinarily, this means the alternative that causes the least harm to
the biological and physical environment; it also means the alternative
which best protects and preserves historic, cultural, and natural
resources.
Preliminary Environmental Impact Statement. An interim
environmental
[[Page 46004]]
document that a responsible official may use to initiate discussion,
solicit comments, and inform interested parties and agency personnel
while proposals, alternatives, and environmental effects are explored
and considered prior to filing a draft or final environmental impact
statement. A preliminary environmental impact statement is an option
available for responsible officials to use and is not required.
Reasonably Foreseeable Future Actions. Those activities not yet
undertaken, for which there are existing decisions, funding, or
identified proposals.
Responsible Official. The Agency employee who has the authority to
make and implement a decision on a proposed action.
Sec. 220.4 General Requirements.
(a) Proposed actions subject to the National Environmental Policy
Act requirements (42 U.S.C. 4321 et seq.). A Forest Service proposal is
subject to the National Environmental Policy Act Requirements when all
of the following apply:
(1) The Forest Service has a goal and is actively preparing to make
a decision on one or more alternative means of accomplishing that goal
(40 CFR 1508.23);
(2) The proposed action is subject to Forest Service control and
responsibility (40 CFR 1508.18);
(3) The proposed action would cause effects on the natural and
physical environment and the relationship of people with that
environment (40 CFR 1508.14) that can be meaningfully evaluated (40 CFR
1508.23); and
(4) The proposed action is not statutorily exempt from the
requirements of section 102(2) of the National Environmental Policy
Act.
(b) Emergency responses. (1) If the responsible official determines
that an emergency exists that makes it necessary to take emergency
actions before completing a NEPA analysis and documentation in
accordance with the provisions in Sec. Sec. 220.5 and 220.7, then
these provisions apply.
(2) The responsible official may take emergency actions necessary
to control the immediate impacts of the emergency to mitigate harm to
life, property, or important resources. When taking such actions, the
responsible official shall take into account the probable environmental
consequences of the emergency action and mitigate foreseeable adverse
environmental effects to the extent practical.
(3) If the responsible official determines that proposed emergency
actions beyond actions noted in paragraph (b)(2) of this section are
not likely to have significant environmental impacts, the responsible
official shall document that determination in an EA and FONSI prepared
in accordance with these regulations, unless categorically excluded
(Sec. 220.6). If the responsible official finds that the nature and
scope of the subsequent actions related to the emergency require taking
such proposed actions prior to completing an EA and FONSI, the
responsible official shall consult with the Washington Office about
alternative arrangements for NEPA compliance. Consultation with the
Washington Office must be coordinated through the appropriate Regional
Office.
(4) If the responsible official determines that proposed emergency
actions beyond actions noted in paragraph (b)(2) of this section are
likely to have significant environmental impacts, then the responsible
official shall consult with CEQ, through the appropriate Regional
Office and the Washington Office, about alternative arrangements as
soon as possible. Alternative arrangements address the proposed actions
necessary to control the immediate impacts of the emergency. Other
proposed actions remain subject to NEPA analysis and documentation in
accordance with these regulations.
(c) Agency Decisionmaking. (1) Forest Service Manual 1906 outlines
Agency planning and decisionmaking. Forest Service Manual 1950
identifies the responsible official for the NEPA process as the Agency
employee who has the delegated authority to make and implement a
decision on a proposed action.
(2) For each Forest Service proposal (Sec. 220.4(a)), the
responsible official shall coordinate and integrate NEPA review and
relevant environmental documents with Agency decisionmaking by:
(i) Completing the environmental document review before making a
decision on the proposal, consistent with 40 CFR 1506.1;
(ii) Considering environmental documents, public and Agency
comments (if any) on those documents, and Agency responses to those
comments (40 CFR 1505.1(d));
(iii) Including environmental documents, comments, and responses as
part of the administrative record (40 CFR 1505.1(c));
(iv) Considering the alternatives analyzed in environmental
document(s) before rendering a decision on the proposal; and
(v) Making a decision encompassed within the range of alternatives
analyzed in the environmental documents (40 CFR 1505.1(e)).
(d) Schedule of Proposed Actions. (1) A Schedule of Proposed
Actions shall be published quarterly to inform interested persons where
to get information about proposed Forest Service actions, including the
status of environmental analyses.
(2) The Schedule of Proposed Actions shall include proposals that
will result in Agency decision documents (Sec. 220.3).
(3) Actions proposed and decided between scheduled publications
shall be identified in the next schedule.
(4) The Schedule of Proposed Actions shall include a contact for
additional information on Forest Service proposals and actions.
(e) Scoping (40 CFR 1501.7). (1) Scoping is required for all Forest
Service proposed actions, including those that would appear to be
categorically excluded from further analysis and documentation in an
environmental assessment or an environmental impact statement (Sec.
220.6).
(2) Scoping shall be consistent with 40 CFR 1501.7. However,
because the nature and complexity of a proposed action determine the
scope and intensity of analysis, no single scoping technique is
required or prescribed.
(3) The Schedule of Proposed Actions is not intended to be used as
the sole scoping mechanism for a proposed action.
(f) Cumulative Effects Considerations of Past Actions (40 CFR
1508.7). In accordance with The Council on Environmental Quality
Guidance Memorandum on Consideration of Past Actions in Cumulative
Effects Analysis dated June 24, 2005, the analysis of cumulative
effects begins with consideration of the direct and indirect effects on
the environment that are expected or likely to result from the
alternative proposals for agency action. Agencies then look for present
effects of past actions that are, in the judgment of the agency,
relevant and useful because they have a significant cause-and-effect
relationship with the direct and indirect effects of the proposal for
agency action and its alternatives. CEQ regulations do not require the
consideration of the individual effects of all past actions to
determine the present effects of past actions. Once the agency has
identified those present effects of past actions that warrant
consideration, the agency assesses the extent that the effects of the
proposal for agency action or its alternatives will add to, modify, or
mitigate those effects. The final analysis documents an agency
assessment of the cumulative effects of the actions
[[Page 46005]]
considered (including past, present, and reasonable foreseeable future
actions) on the affected environment. With respect to past actions,
during the scoping process and subsequent preparation of the analysis,
the agency must determine what information regarding past actions is
useful and relevant to the required analysis of cumulative effects.
Cataloging past actions and specific information about the direct and
indirect effects of their design and implementation could in some
contexts be useful to predict the cumulative effects of the proposal.
The CEQ regulations, however, do not require agencies to catalogue or
exhaustively list and analyze all individual past actions. Simply
because information about past actions may be available or obtained
with reasonable effort does not mean that it is relevant and necessary
to inform decisionmaking.
(g) Classified information (40 CFR 1507.3(c)). To the extent
practicable, the responsible official shall segregate any information
classified in accordance with Executive order or statute. The
responsible official shall maintain the confidentiality of such
information in a manner required for the information involved. Such
information may not be included in any publicly disclosed documents. If
such material cannot be reasonably segregated, or if segregation would
leave essentially meaningless material, the responsible official must
withhold the entire analysis document from the public; however, the
responsible official shall otherwise prepare the analysis documentation
in accordance with applicable regulations.
(h) Incorporation by Reference. Consistent with 40 CFR 1502.21,
material may be incorporated by reference into any environmental or
decision document. This material must be reasonably available to the
public and its contents briefly described in the environmental or
decision document.
(i) Applicants. The responsible official shall make policies or
staff available to advise potential applicants of studies or other
information foreseeably required for acceptance of their applications.
For situations involving an applicant, the responsible official should
initiate the NEPA process upon acceptance of an application in
accordance with 36 CFR 251.54(g).
Sec. 220.5 Environmental Impact Statements.
(a) Classes of Actions Normally Requiring Environmental Impact
Statements--
(1) Class 1: Proposals to carry out or to approve aerial
application of chemical pesticides on an operational basis. Examples
include:
(i) Applying chemical insecticides by helicopter on an area
infested with spruce budworm to prevent serious resource loss.
(ii) Authorizing the application of herbicides by helicopter on a
major utility corridor to control unwanted vegetation.
(iii) Applying herbicides by fixed-wing aircraft on an area to
release trees from competing vegetation.
(2) Class 2: Proposals that would substantially alter the
undeveloped character of an inventoried roadless area of 5,000 acres or
more (FSH 1909.12). Examples include:
(i) Constructing roads and harvesting timber in a 56,000-acre
inventoried roadless area where the proposed road and harvest units
impact 3,000 acres in only one part of the roadless area.
(ii) Constructing or reconstructing water reservoir facilities in a
5,000-acre unroaded area where flow regimens may be substantially
altered.
(iii) Approving a plan of operations for a mine which would cause
considerable surface disturbance over 700 acres in a 10,000 acre
roadless area.
(3) Class 3: Other proposals to take major Federal actions that may
significantly affect the quality of the human environment. Examples
include:
(i) Approving the use of 1,500 acres of National Forest System land
to construct and operate an all-season recreation resort complex.
(ii) Authorizing the Bureau of Land Management to offer the sale of
leases for oil and natural gas resources from beneath 400,000 acres of
National Forest System lands that have historically demonstrated a
relatively high potential for discovery and development of oil and
natural gas.
(iii) Approving the construction and operation of an international
gas pipeline beneath a previously undeveloped 30-mile long, 1,000-foot
wide corridor within an ecologically sensitive area of National Forest
System land.
(b) Notice of Intent. A notice of intent shall be prepared and
published in the Federal Register as soon as practicable after deciding
that an environmental impact statement will be prepared. In addition to
the requirements of 40 CFR 1508.22, notices of intent must include the
following:
(1) Title of the responsible official(s);
(2) Any permits or licenses required to implement the proposed
action and the issuing authority;
(3) Lead, joint lead, or cooperating agencies if identified; and
(4) Address(es) to which comments may be sent.
(c) Withdrawal Notice. A withdrawal notice must be published in the
Federal Register if, after publication of the notice of intent or
notice of availability, an environmental impact statement is no longer
necessary. A withdrawal notice must refer to the date and page number
of the previously published notice.
(d) Environmental Impact Statement Format and Content. The
responsible official may use any environmental impact statement format
and design as long as the statement is in accordance with 40 CFR
1502.10.
(e) Alternative(s). The environmental impact statement shall
document the examination of reasonable alternatives to the proposed
action. Reasonable alternatives should meet the purpose and need and
address one or more significant issues (40 CFR 1501.7) related to the
proposed action. Since an alternative may be developed to address more
than one significant issue, no specific number of alternatives is
required or prescribed. In addition to the requirements at 40 CFR
1502.14 the responsible official has an option to use the following
procedures to develop and analyze alternatives.
(1) The effects of the no-action alternative may be documented by
contrasting the current condition and expected future condition should
the proposed action not be undertaken with the impacts of the proposed
action and any reasonable alternatives.
(2) To facilitate collaborative processes and sound decisions, the
responsible official may collaborate with interested parties to modify
the proposed action and alternative(s) under consideration prior to
issuing a draft environmental impact statement. In such cases, the
responsible official may consider the incremental changes as
alternatives considered. The documentation of these incremental changes
to a proposed action or alternatives may be incorporated by reference
in accordance with 40 CFR 1502.21 rather than duplicating the
description and analysis in the statement.
(3) A proposed action or alternative(s) may include adaptive
management strategies allowing for adjustment of the action during
implementation. If the adjustments to an action are clearly articulated
and pre-specified in the description of the alternative and fully
analyzed, then the action may be adjusted during implementation without
the need for further analysis. Adaptive management includes a
monitoring component, approved adaptive actions that may be taken, and
[[Page 46006]]
environmental effects analysis for the adaptive actions approved.
(f) Environmental Effects. In addition to the environmental
consequences requirements at 40 CFR 1502.16, the EIS must include the
impacts considered during any incremental alternative development
process and the environmental effects of any adaptive management
strategy.
(g) Circulating and Filing Draft and Final Environmental Impact
Statements. (1) The draft and final EISs shall be filed with the
Environmental Protection Agency's Office of Federal Activities in
Washington, DC (40 CFR 1506.9).
(2) If preliminary drafts are prepared the responsible official
shall make those multiple preliminary draft and preliminary final EISs
available to those interested and affected persons and agencies for
comment; however, requirements at 40 CFR 1506.10 and 40 CFR 1502.19
shall only apply to the last draft and final EIS.
(3) When the responsible official determines that an extension of
the review period on a draft EIS is appropriate, notice shall be given
in the same manner used for inviting comments (40 CFR 1503.1) on the
draft.
(h) Distribution of the Record of Decision. The responsible
official shall notify interested or affected parties of the
availability of the record of decision as soon as practical after
signing.
Sec. 220.6 Categorical Exclusions.
(a) General. A proposed action may be categorically excluded from
further analysis and documentation in an EIS or EA only if there are no
extraordinary circumstances related to the proposed action and if:
(1) The proposed action is within one of the categories established
by the Secretary at 7 CFR part 1b.3; or
(2) The proposed action is within a category listed in section
220.6(d)(e).
(b) Resource conditions. (1) Resource conditions that should be
considered in determining whether extraordinary circumstances related
to a proposed action warrant further analysis and documentation in an
EA or an EIS are:
(i) Federally listed threatened or endangered species or designated
critical habitat, species proposed for Federal listing or proposed
critical habitat, or Forest Service sensitive species.
(ii) Flood plains, wetlands, or municipal watersheds.
(iii) Congressionally designated areas, such as wilderness,
wilderness study areas, or national recreation areas.
(iv) Inventoried roadless areas.
(v) Research natural areas.
(vi) American Indians and Alaska Native religious or cultural
sites.
(vii) Archaeological sites, or historic properties or areas.
(2) The mere presence of one or more of these resource conditions
does not preclude use of a categorical exclusion (CE). It is the
existence of a cause-effect relationship between a proposed action and
the potential effect on these resource conditions and if such a
relationship exists, the degree of the potential effect of a proposed
action on these resource conditions that determines whether
extraordinary circumstances exist.
(c) Scoping. If the responsible official determines, based on
scoping, that it is uncertain whether the proposed action may have a
significant effect on the environment, prepare an EA. If the
responsible official determines, based on scoping, that the proposed
action may have a significant environmental effect, prepare an EIS.
(d) Categories of actions for which a project or case file and
decision memo are not required. A supporting record and a decision memo
are not required, but at the discretion of the responsible official,
may be prepared for the following categories:
(1) Orders issued pursuant to 36 CFR part 261--Prohibitions to
provide short-term resource protection or to protect public health and
safety. Examples include but are not limited to:
(i) Closing a road to protect bighorn sheep during lambing season.
(ii) Closing an area during a period of extreme fire danger.
(2) Rules, regulations, or policies to establish Service-wide
administrative procedures, program processes, or instructions. Examples
include but are not limited to:
(i) Adjusting special use or recreation fees using an existing
formula.
(ii) Proposing a technical or scientific method or procedure for
screening effects of emissions on air quality related values in Class I
wildernesses.
(iii) Proposing a policy to defer payments on certain permits or
contracts to reduce the risk of default.
(iv) Proposing changes in contract terms and conditions or terms
and conditions of special use authorizations.
(v) Establishing a Service-wide process for responding to offers to
exchange land and for agreeing on land values.
(vi) Establishing procedures for amending or revising forest land
and resource management plans.
(3) Repair and maintenance of administrative sites. Examples
include but are not limited to:
(i) Mowing lawns at a district office.
(ii) Replacing a roof or storage shed.
(iii) Painting a building.
(iv) Applying registered pesticides for rodent or vegetation
control.
(4) Repair and maintenance of roads, trails, and landline
boundaries. Examples include but are not limited to:
(i) Authorizing a user to grade, resurface, and clean the culverts
of an established National Forest System road.
(ii) Grading a road and clearing the roadside of brush without the
use of herbicides.
(iii) Resurfacing a road to its original condition.
(iv) Pruning vegetation and cleaning culverts along a trail and
grooming the surface of the trail.
(v) Surveying, painting, and posting landline boundaries.
(5) Repair and maintenance of recreation sites and facilities.
Examples include but are not limited to:
(i) Applying registered herbicides to control poison ivy on
infested sites in a campground.
(ii) Applying registered insecticides by compressed air sprayer to
control insects at a recreation site complex.
(iii) Repaving a parking lot.
(iv) Applying registered pesticides for rodent or vegetation
control.
(6) Acquisition of land or interest in land. Examples include but
are not limited to:
(i) Accepting the donation of lands or interests in land to the
National Forest System.
(ii) Purchasing fee, conservation easement, reserved interest deed,
or other interests in lands.
(7) Sale or exchange of land or interest in land and resources
where resulting land uses remain essentially the same. Examples include
but are not limited to:
(i) Selling or exchanging land pursuant to the Small Tracts Act.
(ii) Exchanging National Forest System lands or interests with a
State agency, local government, or other non-Federal party (individual
or organization) with similar resource management objectives and
practices.
(iii) Authorizing the Bureau of Land Management to issue leases on
producing wells when mineral rights revert to the United States from
private ownership and there is no change in activity.
(iv) Exchange of administrative sites involving other than National
Forest System lands.
(8) Approval, modification, or continuation of minor, short-term (1
year or less) special uses of National Forest System lands. Examples
include but are not limited to:
(i) Approving, on an annual basis, the intermittent use and
occupancy by a State-licensed outfitter or guide.
[[Page 46007]]
(ii) Approving the use of National Forest System land for apiaries.
(iii) Approving the gathering of forest products for personal use.
(9) Issuance of a new permit for up to the maximum tenure allowable
under the National Forest Ski Area Permit Act of 1986 (16 U.S.C. 497b)
for an existing ski area when such issuance is a purely ministerial
action to account for administrative changes, such as a change in
ownership of ski area improvements, expiration of the current permit,
or a change in the statutory authority applicable to the current
permit. Examples of actions in this category include, but are not
limited to:
(i) Issuing a permit to a new owner of ski area improvements within
an existing ski area with no changes to the master development plan,
including no changes to the facilities or activities for that ski area.
(ii) Upon expiration of a ski area permit, issuing a new permit to
the holder of the previous permit where the holder is not requesting
any changes to the master development plan, including changes to the
facilities or activities.
(iii) Issuing a new permit under the National Forest Ski Area
Permit Act of 1986 to the holder of a permit issued under the Term
Permit and Organic Acts, where there are no changes in the type or
scope of activities authorized and no other changes in the master
development plan.
(10) Amendment to or replacement of an existing special use
authorization that involves only administrative changes and does not
involve changes in the authorized facilities or increase in the scope
or intensity of authorized activities, or extensions to the term of
authorization, when the applicant or holder is in full compliance with
the terms and conditions of the special use authorization. Examples
include but are not limited to:
(i) Amending a special use authorization to reflect administrative
changes such as adjustment to the land use fees, inclusion of non-
discretionary environmental standards or updating a special use
authorization to bring it into conformance with current laws or
regulations (for example, new monitoring required by water quality
standards).
(ii) Issuance of a new special use authorization to reflect
administrative changes such as, a cha