Advisory Committee on Reactor Safeguards; Meeting Notice, 45452-45453 [E7-15887]
Download as PDF
45452
Federal Register / Vol. 72, No. 156 / Tuesday, August 14, 2007 / Notices
and (a)(2)(B)(II.B.) (shift in production
to a foreign country) have not been met.
TA–W–61,687; The GSI Group, Inc.,
Vandalia, IL.
The investigation revealed that
criteria (a)(2)(A)(I.C.) (increased
imports) and (a)(2)(B)(II.B.) (shift in
production to a foreign country) have
not been met.
TA–W–61,742; Sypris Technologies,
Inc., A Subsidiary of Sypris Solutions,
Kenton, OH.
TA–W–61,845; NYC American, Inc.,
Brooklyn, NY.
The workers’ firm does not produce
an article as required for certification
under Section 222 of the Trade Act of
1974.
TA–W–61,662; Metso Paper USA, Inc.,
Roll Service Shop, Appleton, WI.
TA–W–61,778; Integrated Brands, Inc.,
Divisional Coolbrands International,
Ronkonkoma, NY.
TA–W–61,790; State Farm Insurance,
Regional Claims Office, Wheelersburg,
OH.
The investigation revealed that
criteria of Section 222(b)(2) has not been
met. The workers’ firm (or subdivision)
is not a supplier to or a downstream
producer for a firm whose workers were
certified eligible to apply for TAA.
None.
I hereby certify that the aforementioned
determinations were issued during the period
of July 30 through August 3, 2007. Copies of
these determinations are available for
inspection in Room C–5311, U.S. Department
of Labor, 200 Constitution Avenue, NW.,
Washington, DC 20210 during normal
business hours or will be mailed to persons
who write to the above address.
Dated: August 8, 2007.
Linda G. Poole,
Certifying Officer, Division of Trade
Adjustment Assistance.
[FR Doc. E7–15848 Filed 8–13–07; 8:45 am]
BILLING CODE 4510–FN–P
NUCLEAR REGULATORY
COMMISSION
mstockstill on PROD1PC66 with NOTICES
Advisory Committee on Reactor
Safeguards; Meeting Notice
In accordance with the purposes of
sections 29 and 182b of the Atomic
Energy Act (42 U.S.C. 2039, 2232b), the
Advisory Committee on Reactor
Safeguards (ACRS) will hold a meeting
on September 6–8, 2007, 11545
Rockville Pike, Rockville, Maryland.
The date of this meeting was previously
published in the Federal Register on
Wednesday, November 15, 2006 (71 FR
66561).
VerDate Aug<31>2005
16:35 Aug 13, 2007
Jkt 211001
Thursday, September 6, 2007,
Conference Room T–2b3, Two White
Flint North, Rockville, Maryland
8:30 a.m.–8:35 a.m.: Opening
Remarks by the ACRS Chairman
(Open)—The ACRS Chairman will make
opening remarks regarding the conduct
of the meeting.
8:35 a.m.–10:30 a.m.: Final Review of
the License Renewal application for the
Pilgrim Nuclear Power Station (Open)—
The Committee will hear presentations
by and hold discussions with
representatives of the NRC staff and
Entergy Nuclear Operations, Inc.
regarding the license renewal
application for the Pilgrim Nuclear
Power Station and the associated NRC
staff’s final Safety Evaluation Report.
10:45 a.m.–12:15 p.m.: Revisions to
Standard Review Plan (SRP) Sections
19.0 and 19.2 (Open)—The Committee
will hear presentations by and hold
discussions with representatives of the
NRC staff regarding revisions to SRP
Sections 19.0, ‘‘Probabilistic Risk
Assessment and Severe Accident
Evaluation for New Reactors,’’ and 19.2,
‘‘Review of Risk Information Used to
Support Permanent Plant Specific
Changes to the Licensing Basis: General
Guidance.’’
1:30 p.m.–3 p.m.: Proposed
Recommendations for Resolving Generic
Safety Issue (GSI) 156.6.1, ‘‘Pipe Break
Effects on Systems and Components
Inside Containment’’ (Open)—The
Committee will hear presentations by
and hold discussions with
representatives of the NRC staff
regarding the recommendations
proposed by the staff for resolving GSI–
156.6.1, and related matters.
3:15 p.m.–4:45 p.m.: Status of NRR
Activities in the Fire Protection Area
(Open)—The Committee will hear
presentations by and hold discussions
with representatives of the Office of
Nuclear Reactor Regulation (NRR)
regarding the status of ongoing and
proposed NRR activities associated with
fire protection.
5 p.m.–7 p.m.: Preparation of ACRS
Reports (Open)—The Committee will
discuss proposed ACRS reports on
matters considered during this meeting,
as well as a proposed ACRS report on
Technology-Neutral Framework for
Future Plant Licensing.
Friday, September 7, 2007, Conference
Room T–2B3, Two White Flint North,
Rockville, Maryland
8:30 a.m.–8:35 a.m.: Opening
Remarks by the ACRS Chairman
(Open)—The ACRS Chairman will make
opening remarks regarding the conduct
of the meeting.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
8:35 a.m.–9:30 a.m.: Future ACRS
Activities/Report of the Planning and
Procedures Subcommittee (Open)—The
Committee will discuss the
recommendations of the Planning and
Procedures Subcommittee regarding
items proposed for consideration by the
full Committee during future meetings.
Also, it will hear a report of the
Planning and Procedures Subcommittee
on matters related to the conduct of
ACRS business, including anticipated
workload and member assignments.
9:30 a.m.–9:45 a.m.: Reconciliation of
ACRS Comments and
Recommendations (Open)—The
Committee will discuss the responses
from the NRC Executive Director for
Operations to comments and
recommendations included in recent
ACRS reports and letters.
9:45 a.m.–10 a.m.: Subcommittee
Report (Open)—The Committee will
hear a report by and hold discussions
with the Chairman of the ACRS
Subcommittee on Plant License
Renewal regarding interim review of the
license renewal application for the
Fitzpatrick Nuclear Plant.
10:15 a.m.–11:45 a.m.: Draft Report
on Quality Assessment of Selected NRC
Research Projects (Open)—The
Committee will discuss a draft ACRS
report on the results of the quality
assessment of the NRC research projects
on: Fatigue Crack Flaw Tolerance in
Nuclear Power Plant Piping; Cable
Response to Live Fire (CAROLFIRE)
Testing; and Technical Review of OnLine Monitoring Techniques for
Performance Assessment.
12:45 p.m.–2:45 p.m.: Draft ACRS
Report on the NRC Safety Research
Program (Open)—The Committee will
discuss a draft ACRS report on the NRC
Safety Research Program.
3 p.m.–7 p.m.: Preparation of ACRS
Reports (Open)—The Committee will
discuss proposed ACRS reports.
Saturday, September 8, 2007,
Conference Room T–2B3, Two White
Flint North, Rockville, Maryland
8:30 a.m.–12:30 p.m.: Preparation of
ACRS Reports (Open)—The Committee
will continue its discussion of proposed
ACRS reports.
12:30 p.m.–1 p.m.: Miscellaneous
(Open)—The Committee will discuss
matters related to the conduct of
Committee activities and matters and
specific issues that were not completed
during previous meetings, as time and
availability of information permit.
Procedures for the conduct of and
participation in ACRS meetings were
published in the Federal Register on
October 2, 2006 (71 FR 58015). In
accordance with those procedures, oral
E:\FR\FM\14AUN1.SGM
14AUN1
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 72, No. 156 / Tuesday, August 14, 2007 / Notices
or written views may be presented by
members of the public, including
representatives of the nuclear industry.
Electronic recordings will be permitted
only during the open portions of the
meeting. Persons desiring to make oral
statements should notify the Cognizant
ACRS staff named below five days
before the meeting, if possible, so that
appropriate arrangements can be made
to allow necessary time during the
meeting for such statements. Use of still,
motion picture, and television cameras
during the meeting may be limited to
selected portions of the meeting as
determined by the Chairman.
Information regarding the time to be set
aside for this purpose may be obtained
by contacting the Cognizant ACRS staff
prior to the meeting. In view of the
possibility that the schedule for ACRS
meetings may be adjusted by the
Chairman as necessary to facilitate the
conduct of the meeting, persons
planning to attend should check with
the Cognizant ACRS staff if such
rescheduling would result in major
inconvenience.
Further information regarding topics
to be discussed, whether the meeting
has been canceled or rescheduled, as
well as the Chairman’s ruling on
requests for the opportunity to present
oral statements and the time allotted
therefor can be obtained by contacting
Mr. Sam Duraiswamy, Cognizant ACRS
staff (301–415–7364), between 7:30 a.m.
and 4 p.m., (ET). ACRS meeting agenda,
meeting transcripts, and letter reports
are available through the NRC Public
Document Room at pdr@nrc.gov, or by
calling the PDR at 1–800–397–4209, or
from the Publicly Available Records
System (PARS) component of NRC’s
document system (ADAMS) which is
accessible from the NRC Web site at
https://www.nrc.gov/reading-rm/
adams.html or https://www.nrc.gov/
reading-rm/doc-collections/ (ACRS &
ACNW Mtg schedules/agendas).
Video teleconferencing service is
available for observing open sessions of
ACRS meetings. Those wishing to use
this service for observing ACRS
meetings should contact Mr. Theron
Brown, ACRS Audio Visual Technician
(301–415–8066), between 7:30 a.m. and
3:45 p.m., (ET), at least 10 days before
the meeting to ensure the availability of
this service. Individuals or
organizations requesting this service
will be responsible for telephone line
charges and for providing the
equipment and facilities that they use to
establish the video teleconferencing
link. The availability of video
teleconferencing services is not
guaranteed.
VerDate Aug<31>2005
16:35 Aug 13, 2007
Jkt 211001
Dated: August 8, 2007.
J. Samuel Walker,
Acting Secretary of the Commission.
[FR Doc. E7–15887 Filed 8–13–07; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards; Subcommittee Meeting on
Planning and Procedures; Notice of
Meeting
The ACRS Subcommittee on Planning
and Procedures will hold a meeting on
September 5, 2007, Room T–2B1, 11545
Rockville Pike, Rockville, Maryland.
The entire meeting will be open to
public attendance, with the exception of
a portion that may be closed pursuant
to 5 U.S.C. 552b(c)(2) and (6) to discuss
organizational and personnel matters
that relate solely to the internal
personnel rules and practices of the
ACRS, and information the release of
which would constitute a clearly
unwarranted invasion of personal
privacy.
The agenda for the subject meeting
shall be as follows:
Wednesday, September 5, 2007, 8:30
a.m.–10 a.m.
The Subcommittee will discuss
proposed ACRS activities and related
matters. The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official, Mr. Sam Duraiswamy
(telephone: 301–415–7364) between
7:30 a.m. and 4 p.m. (ET) five days prior
to the meeting, if possible, so that
appropriate arrangements can be made.
Electronic recordings will be permitted
only during those portions of the
meeting that are open to the public.
Further information regarding this
meeting can be obtained by contacting
the Designated Federal Official between
7:30 a.m. and 4 p.m. (ET). Persons
planning to attend this meeting are
urged to contact the above named
individual at least two working days
prior to the meeting to be advised of any
potential changes in the agenda.
Dated: August 7, 2007.
Cayetano Santos,
Branch Chief, ACRS.
[FR Doc. E7–15889 Filed 8–13–07; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
45453
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Meeting of the
Subcommittee on Plant License
Renewal; Notice of Meeting
The ACRS Subcommittee on Plant
License Renewal will hold a meeting on
September 5, 2007, Room T–2B3, 11545
Rockville Pike, Rockville, Maryland.
The entire meeting will be open to
public attendance.
The agenda for the subject meeting
shall be as follows:
Wednesday, September 5, 2007—10:30
a.m. until 5 p.m.
The Subcommittee will discuss
Fitzpatrick license renewal application
and the associated Safety Evaluation
Report (SER) prepared by the NRR staff.
The Subcommittee will hear
presentations by and hold discussions
with representatives of the NRC staff,
Entergy Nuclear Northeast, and other
interested persons regarding this matter.
The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official, Mr. Charles G. Hammer
(telephone 301/415–7363) five days
prior to the meeting, if possible, so that
appropriate arrangements can be made.
Electronic recordings will be permitted.
Further information regarding this
meeting can be obtained by contacting
the Designated Federal Official between
6:45 a.m. and 3:30 p.m. (ET). Persons
planning to attend this meeting are
urged to contact the above named
individual at least two working days
prior to the meeting to be advised of any
potential changes to the agenda.
Dated: August 7, 2007.
Cayetano Santos,
Branch Chief, ACRS.
[FR Doc. E7–15890 Filed 8–13–07; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Notice of Sunshine Act Meetings
AGENCY HOLDING THE MEETINGS: Nuclear
Regulatory Commission.
DATE: Weeks of August 13, 20, 27,
September 3, 10, 17, 2007.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
E:\FR\FM\14AUN1.SGM
14AUN1
Agencies
[Federal Register Volume 72, Number 156 (Tuesday, August 14, 2007)]
[Notices]
[Pages 45452-45453]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-15887]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Advisory Committee on Reactor Safeguards; Meeting Notice
In accordance with the purposes of sections 29 and 182b of the
Atomic Energy Act (42 U.S.C. 2039, 2232b), the Advisory Committee on
Reactor Safeguards (ACRS) will hold a meeting on September 6-8, 2007,
11545 Rockville Pike, Rockville, Maryland. The date of this meeting was
previously published in the Federal Register on Wednesday, November 15,
2006 (71 FR 66561).
Thursday, September 6, 2007, Conference Room T-2b3, Two White Flint
North, Rockville, Maryland
8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)--
The ACRS Chairman will make opening remarks regarding the conduct of
the meeting.
8:35 a.m.-10:30 a.m.: Final Review of the License Renewal
application for the Pilgrim Nuclear Power Station (Open)--The Committee
will hear presentations by and hold discussions with representatives of
the NRC staff and Entergy Nuclear Operations, Inc. regarding the
license renewal application for the Pilgrim Nuclear Power Station and
the associated NRC staff's final Safety Evaluation Report.
10:45 a.m.-12:15 p.m.: Revisions to Standard Review Plan (SRP)
Sections 19.0 and 19.2 (Open)--The Committee will hear presentations by
and hold discussions with representatives of the NRC staff regarding
revisions to SRP Sections 19.0, ``Probabilistic Risk Assessment and
Severe Accident Evaluation for New Reactors,'' and 19.2, ``Review of
Risk Information Used to Support Permanent Plant Specific Changes to
the Licensing Basis: General Guidance.''
1:30 p.m.-3 p.m.: Proposed Recommendations for Resolving Generic
Safety Issue (GSI) 156.6.1, ``Pipe Break Effects on Systems and
Components Inside Containment'' (Open)--The Committee will hear
presentations by and hold discussions with representatives of the NRC
staff regarding the recommendations proposed by the staff for resolving
GSI-156.6.1, and related matters.
3:15 p.m.-4:45 p.m.: Status of NRR Activities in the Fire
Protection Area (Open)--The Committee will hear presentations by and
hold discussions with representatives of the Office of Nuclear Reactor
Regulation (NRR) regarding the status of ongoing and proposed NRR
activities associated with fire protection.
5 p.m.-7 p.m.: Preparation of ACRS Reports (Open)--The Committee
will discuss proposed ACRS reports on matters considered during this
meeting, as well as a proposed ACRS report on Technology-Neutral
Framework for Future Plant Licensing.
Friday, September 7, 2007, Conference Room T-2B3, Two White Flint
North, Rockville, Maryland
8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)--
The ACRS Chairman will make opening remarks regarding the conduct of
the meeting.
8:35 a.m.-9:30 a.m.: Future ACRS Activities/Report of the Planning
and Procedures Subcommittee (Open)--The Committee will discuss the
recommendations of the Planning and Procedures Subcommittee regarding
items proposed for consideration by the full Committee during future
meetings. Also, it will hear a report of the Planning and Procedures
Subcommittee on matters related to the conduct of ACRS business,
including anticipated workload and member assignments.
9:30 a.m.-9:45 a.m.: Reconciliation of ACRS Comments and
Recommendations (Open)--The Committee will discuss the responses from
the NRC Executive Director for Operations to comments and
recommendations included in recent ACRS reports and letters.
9:45 a.m.-10 a.m.: Subcommittee Report (Open)--The Committee will
hear a report by and hold discussions with the Chairman of the ACRS
Subcommittee on Plant License Renewal regarding interim review of the
license renewal application for the Fitzpatrick Nuclear Plant.
10:15 a.m.-11:45 a.m.: Draft Report on Quality Assessment of
Selected NRC Research Projects (Open)--The Committee will discuss a
draft ACRS report on the results of the quality assessment of the NRC
research projects on: Fatigue Crack Flaw Tolerance in Nuclear Power
Plant Piping; Cable Response to Live Fire (CAROLFIRE) Testing; and
Technical Review of On-Line Monitoring Techniques for Performance
Assessment.
12:45 p.m.-2:45 p.m.: Draft ACRS Report on the NRC Safety Research
Program (Open)--The Committee will discuss a draft ACRS report on the
NRC Safety Research Program.
3 p.m.-7 p.m.: Preparation of ACRS Reports (Open)--The Committee
will discuss proposed ACRS reports.
Saturday, September 8, 2007, Conference Room T-2B3, Two White Flint
North, Rockville, Maryland
8:30 a.m.-12:30 p.m.: Preparation of ACRS Reports (Open)--The
Committee will continue its discussion of proposed ACRS reports.
12:30 p.m.-1 p.m.: Miscellaneous (Open)--The Committee will discuss
matters related to the conduct of Committee activities and matters and
specific issues that were not completed during previous meetings, as
time and availability of information permit.
Procedures for the conduct of and participation in ACRS meetings
were published in the Federal Register on October 2, 2006 (71 FR
58015). In accordance with those procedures, oral
[[Page 45453]]
or written views may be presented by members of the public, including
representatives of the nuclear industry. Electronic recordings will be
permitted only during the open portions of the meeting. Persons
desiring to make oral statements should notify the Cognizant ACRS staff
named below five days before the meeting, if possible, so that
appropriate arrangements can be made to allow necessary time during the
meeting for such statements. Use of still, motion picture, and
television cameras during the meeting may be limited to selected
portions of the meeting as determined by the Chairman. Information
regarding the time to be set aside for this purpose may be obtained by
contacting the Cognizant ACRS staff prior to the meeting. In view of
the possibility that the schedule for ACRS meetings may be adjusted by
the Chairman as necessary to facilitate the conduct of the meeting,
persons planning to attend should check with the Cognizant ACRS staff
if such rescheduling would result in major inconvenience.
Further information regarding topics to be discussed, whether the
meeting has been canceled or rescheduled, as well as the Chairman's
ruling on requests for the opportunity to present oral statements and
the time allotted therefor can be obtained by contacting Mr. Sam
Duraiswamy, Cognizant ACRS staff (301-415-7364), between 7:30 a.m. and
4 p.m., (ET). ACRS meeting agenda, meeting transcripts, and letter
reports are available through the NRC Public Document Room at
pdr@nrc.gov, or by calling the PDR at 1-800-397-4209, or from the
Publicly Available Records System (PARS) component of NRC's document
system (ADAMS) which is accessible from the NRC Web site at https://
www.nrc.gov/reading-rm/adams.html or https://www.nrc.gov/reading-rm/doc-
collections/ (ACRS & ACNW Mtg schedules/agendas).
Video teleconferencing service is available for observing open
sessions of ACRS meetings. Those wishing to use this service for
observing ACRS meetings should contact Mr. Theron Brown, ACRS Audio
Visual Technician (301-415-8066), between 7:30 a.m. and 3:45 p.m.,
(ET), at least 10 days before the meeting to ensure the availability of
this service. Individuals or organizations requesting this service will
be responsible for telephone line charges and for providing the
equipment and facilities that they use to establish the video
teleconferencing link. The availability of video teleconferencing
services is not guaranteed.
Dated: August 8, 2007.
J. Samuel Walker,
Acting Secretary of the Commission.
[FR Doc. E7-15887 Filed 8-13-07; 8:45 am]
BILLING CODE 7590-01-P