Environmental Impact Statements and Regulations; Availability of EPA Comments, 45043-45044 [E7-15714]
Download as PDF
sroberts on PROD1PC70 with PROPOSALS
Federal Register / Vol. 72, No. 154 / Friday, August 10, 2007 / Notices
EPA has established a public docket
for this ICR under Docket ID Number
EPA–HQ–OECA–2006–0775, which is
available for public viewing online at
https://www.regulations.gov, or in person
viewing at the Enforcement and
Compliance Docket and Information
Center in the EPA Docket Center (EPA/
DC), EPA West, Room 3334, 1301
Constitution Avenue, NW., Washington,
DC. The EPA Docket Center Public
Reading Room is open from 8:30 a.m. to
4:30 p.m., Monday through Friday,
excluding legal holidays. The telephone
number for the Reading Room is (202)
566–1744, and the telephone number for
the Enforcement and Compliance
Docket Center is (202) 566–1752.
Use EPA’s electronic docket and
comment system at https://
www.regulations.gov, to submit or view
public comments, access the index
listing of the contents of the docket, and
to access those documents in the docket
that are available electronically. Once in
the system, select ‘‘docket search,’’ then
key in the docket ID number identified
above. Please note that EPA’s policy is
that public comments, whether
submitted electronically or in paper,
will be made available for public
viewing at https://www.regulations.gov,
as EPA receives them and without
change, unless the comment contains
copyrighted material, CBI, or other
information whose public disclosure is
restricted by statute. For further
information about the electronic docket,
go to https://www.regulations.gov.
Title: NSPS for Stationary Gas
Turbines (Renewal).
ICR Numbers: EPA ICR Number
1071.09, OMB Control Number 2060–
0028.
ICR Status: This ICR is scheduled to
expire on August 31, 2007. Under OMB
regulations, the Agency may continue to
conduct or sponsor the collection of
information while this submission is
pending at OMB. An Agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
The OMB control numbers for EPA’s
regulations in title 40 of the CFR, after
appearing in the Federal Register when
approved, are listed in 40 CFR part 9,
and displayed either by publication in
the Federal Register or by other
appropriate means, such as on the
related collection instrument or form, if
applicable. The display of OMB control
numbers in certain EPA regulations is
consolidated in 40 CFR part 9.
Abstract: The New Source
Performance Standard (NSPS) for
Stationary Gas Turbines (40 CFR part
60, subpart GG) were proposed on
VerDate Aug<31>2005
16:37 Aug 09, 2007
Jkt 211001
October 3, 1977, and promulgated on
September 10, 1979. Owners and
operators of stationary gas turbines must
submit a one-time-only notification of
construction/reconstruction,
modification, and startup date, initial
performance test date, physical or
operational changes, and demonstration
of a continuous monitoring system.
They also must provide a report on
initial performance test result,
monitoring results and any excess
emissions. Records must be maintained
of startups, shutdowns, malfunctions;
periods when the continuous
monitoring system is inoperative; sulfur
and nitrogen content of the fuel; fuel to
water ration; rate of fuel consumption;
and ambient conditions. Semiannual
reports are also required.
Any owner or operator subject to the
provisions of this part shall maintain a
file of these measurements, and retain
the file for at least two years following
the date of such measurements,
maintenance reports and records. All
reports are sent to the delegated state or
local authority. In the event that there
is no such delegated authority, the
reports are sent directly to the EPA
regional office. This information is
being collected to assure compliance
with 40 CFR part 60, subpart GG, as
authorized in section 112 and 114(a) of
the Clean Air Act. The required
information consists of emissions data
and other information that have been
determined to be private.
An Agency may not conduct or
sponsor, and a person is not required to
respond to, a collection of information
unless it displays a currently valid OMB
Control Number. The OMB Control
Number for EPA’s regulations are listed
in 40 CFR part 9 and 48 CFR chapter 15,
and are identified on the form and/or
instrument, if applicable.
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 56 hours per
response. Burden means the total time,
effort, or financial resources expended
by persons to generate, maintain, retain,
or disclose or provide information to or
for a Federal agency. This includes the
time needed to review instructions;
develop, acquire, install, and utilize
technology and systems for the purposes
of collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
45043
review the collection of information;
and transmit or otherwise disclose the
information.
Respondents/Affected Entities:
Stationary gas turbines.
Estimated Number of Respondents:
535.
Frequency of Response: Initially,
semiannually, and occasionally.
Estimated Total Annual Hour Burden:
59,519.
Estimated Total Costs: $3,837,190
which includes $0 annualized Capital
Startup costs, $0 annualized Operations
& Maintenance costs (O&M) and
$3,837,190 annualized Labor Costs.
Changes in the Estimates: There is no
change in the labor hours or cost in this
ICR compared to the previous ICR. This
is due to two considerations. First, the
regulations have not changed over the
past three years and are not anticipated
to change over the next three years.
Secondly, the growth rate for the
industry is very low, negative or nonexistent, so there is no significant
change in the overall burden.
Dated: August 3, 2007.
Sara Hisel-McCoy,
Acting Director, Collection Strategies
Division.
[FR Doc. E7–15673 Filed 8–9–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6689–8]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2007 (72 FR 17156).
Draft EISs
EIS No. 20070207, ERP No. D–AFS–
J65482–SD, Citadel Project Area,
Proposes to Implement Multiple
Resource Management Actions,
Northern Hills Ranger District, Black
Hills National Forest, Lawrence County,
SD
Summary: EPA expressed
environmental concerns about the
potential impacts to water quality,
E:\FR\FM\10AUN1.SGM
10AUN1
45044
Federal Register / Vol. 72, No. 154 / Friday, August 10, 2007 / Notices
sroberts on PROD1PC70 with PROPOSALS
aquatic resources and wildlife habitat
from new road construction and impacts
from existing roads need maintenance,
and suggested that the final EIS include
additional information on implementing
proposed road closures.
Rating EC2.
EIS No. 20070222, ERP No. D–AFS–
J65484–MT, Grizzly Vegetation and
Transportation Management Project,
Proposes Timber Harvest, Prescribed
Burning, Road Maintenance, and
Transportation Management Actions,
Three Rivers Ranger District, Kootenai
National Forest, Lincoln County, MT
Summary: EPA expressed
environmental concerns about
potential adverse impacts to soil and
water quality.
Rating EC2.
EIS No. 20070238, ERP No. D–AFS–
K65328–00, Mt. Ashland LateSuccessional Reserve Habitat
Restoration and Fuels Reduction
Project, To Promote and Maintain
Late-Successional Habitat, Oak Ranger
District, Klamath National Forest,
Siskiyou County, CA and Jackson
County, OR
Summary: EPA expressed
environmental concerns about
impacts to riparian areas and the
watershed from proposed silviculture
treatments and recommended that the
Final EIS include information about
potential source water locations in the
project area, and identify Alternative
5 as the Preferred Alternative.
Rating EC2.
Final EISs
EIS No. 20070219, ERP No. F–AFS–
J65478–00, Norwood Project, Proposes
to Implement Multiple Resource
Management Actions, Black Hills
National Forest, Hell Canyon Ranger
District, Pennington County, SD and
Weston and Crook Counties, WY
Summary: The final EIS and additional
information adequately addressed
EPA’s concerns with impacts to water
quality soils and wetlands, roads,
sedimentation and OHV use, invasive
and noxious weeds, and wildlife
habitat; therefore, EPA does not object
to this proposed action.
EIS No. 20070233, ERP No. F–NPS–
J65461–CO, Great Sand Dunes
National and Preserve. General
Management Plan/Wilderness Study,
Implementation, Alamos and
Saguache Counties, CO
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070235, ERP No. F–BLM–
K65306–CA, Alturas Field Office
Project, Resource Management Plan,
VerDate Aug<31>2005
16:37 Aug 09, 2007
Jkt 211001
Implementation, Alturas Field Office
Project, Resource Management Plan,
Implementation, Lassen, Modoc,
Shasta and Siskiyou Counties, CA
Summary: EPA continues to have
environmental concerns about water
quality, soil condition and rangeland
habitat, and requested that BLM focus
on relieving grazing pressure in
Category 1 rangelands until these areas
improve. EPA also requested the closure
of OHV route segments adjacent to
waters to improve soil conditions,
habitat, and water quality.
EIS No. 20070236, ERP No. F–BLM–
K65307–00, Eagle Lake Field Office
Project, Resource Management Plan,
Implementation, Lassen, Plumas,
Sierra Counties, CA and Washoe
County, NV
Summary: EPA continues to have
environmental concerns about water
quality and soil condition and
rangeland habitat, and requested that
BLM focus on relieving grazing pressure
in Category 1 rangelands until these
areas improve. EPA also requested the
closure of additional OHV route
segments adjacent to waters to improve
soil conditions, habitat, and water
quality.
EIS No. 20070240, ERP No. F–AFS–
J65401–00, Northern Rockies Lynx
Management Direction, Selected
Alternative F, Conservation and
Promote Recovery of the Canada
Lynx, NFS and BLM to Amend Land
Resource Management Plans for 18
National Forests (NF), MT, WY, UT,
and ID
Summary: EPA continues to have
environmental concerns about
mitigation measures to protect the lynx
and its habitat.
EIS No. 20070283, ERP No. F–AFS–
L65532–OR, Five Buttes Project,
Conduct Vegetation Management
Activities, Implementation, Deschutes
National Forest, Crescent Ranger
District, Deschutes County, OR
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070293, ERP No. F–SFW–
A65170–00, Light Goose Management
Plan, Reducing and Stabilizing
Specific Populations ‘‘Light Geese’’ in
North America, Implementation
Summary: EPA does not object to the
proposed action.
EIS No. 20070254, ERP No. FS–TVA–
E06008–TN, Watts Bar Nuclear Plant
Unit 2, Completion and Operation,
Updated Information on Extensive
Environmental Record, Rhea County,
TN
Summary: EPA continues to have
environmental concerns about the
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
ongoing need for appropriate storage
and ultimate disposition of radioactive
waste generated on-site. EPA also has
concerns about the lack of measures to
limit bioentrainment and other impacts
to aquatic species from surface water
withdrawals and discharges.
Dated: August 7, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–15714 Filed 8–9–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6689–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 07/30/2007 Through 08/03/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070328, Final Supplement,
BLM, MT, Golden Sunlight Mine Pit
Reclamation Alternatives, Preferred
Alternative Selected is the
Underground Sump Alternative,
Operating Permit No. 00065 and Planof-Operations #MTM 82855,
Whitehall, Jefferson County, MT, Wait
Period Ends: 09/10/2007, Contact:
David Williams 406–533–7655.
EIS No. 20070329, Final EIS, GSA, OH,
Cincinnati National Institute for
Occupational Safety and Health
(NIOSH) Laboratories Consolidation,
Site Selection, Hamilton and
Clermont Counties, OH, Wait Period
Ends: 09/10/2007, Contact: Phil
Youngberg 404–433–8393.
EIS No. 20070330, Draft EIS, IBW, CA,
PROGRAMMATIC—Tijuana River
Flood Control Project, Proposing a
Range of Alternatives for Maintenance
Activities and Future Improvements,
San Diego County, CA, Comment
Period Ends: 09/24/2007, Contact:
Daniel Borunda 915–832–4767.
EIS No. 20070331, Draft EIS, IBW, TX,
PROGRAMMATIC—Rio Grande Flood
Control Projects, Proposing a Range of
Alternatives for Maintenances
Activities and Future Improvements,
along the Texas-Mexico Border,
Comment Period Ends: 09/24/2007,
Contact: Daniel Borunda 915–832–
4767.
EIS No. 20070332, Draft EIS BLM, OR,
Western Oregon Bureau of Land
Management Districts of Salem,
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 72, Number 154 (Friday, August 10, 2007)]
[Notices]
[Pages 45043-45044]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-15714]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6689-8]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 6, 2007 (72 FR
17156).
Draft EISs
EIS No. 20070207, ERP No. D-AFS-J65482-SD, Citadel Project Area,
Proposes to Implement Multiple Resource Management Actions, Northern
Hills Ranger District, Black Hills National Forest, Lawrence County, SD
Summary: EPA expressed environmental concerns about the potential
impacts to water quality,
[[Page 45044]]
aquatic resources and wildlife habitat from new road construction and
impacts from existing roads need maintenance, and suggested that the
final EIS include additional information on implementing proposed road
closures.
Rating EC2.
EIS No. 20070222, ERP No. D-AFS-J65484-MT, Grizzly Vegetation and
Transportation Management Project, Proposes Timber Harvest, Prescribed
Burning, Road Maintenance, and Transportation Management Actions, Three
Rivers Ranger District, Kootenai National Forest, Lincoln County, MT
Summary: EPA expressed environmental concerns about potential adverse
impacts to soil and water quality.
Rating EC2.
EIS No. 20070238, ERP No. D-AFS-K65328-00, Mt. Ashland Late-
Successional Reserve Habitat Restoration and Fuels Reduction Project,
To Promote and Maintain Late-Successional Habitat, Oak Ranger District,
Klamath National Forest, Siskiyou County, CA and Jackson County, OR
Summary: EPA expressed environmental concerns about impacts to riparian
areas and the watershed from proposed silviculture treatments and
recommended that the Final EIS include information about potential
source water locations in the project area, and identify Alternative 5
as the Preferred Alternative.
Rating EC2.
Final EISs
EIS No. 20070219, ERP No. F-AFS-J65478-00, Norwood Project, Proposes to
Implement Multiple Resource Management Actions, Black Hills National
Forest, Hell Canyon Ranger District, Pennington County, SD and Weston
and Crook Counties, WY
Summary: The final EIS and additional information adequately addressed
EPA's concerns with impacts to water quality soils and wetlands, roads,
sedimentation and OHV use, invasive and noxious weeds, and wildlife
habitat; therefore, EPA does not object to this proposed action.
EIS No. 20070233, ERP No. F-NPS-J65461-CO, Great Sand Dunes National
and Preserve. General Management Plan/Wilderness Study, Implementation,
Alamos and Saguache Counties, CO
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070235, ERP No. F-BLM-K65306-CA, Alturas Field Office
Project, Resource Management Plan, Implementation, Alturas Field Office
Project, Resource Management Plan, Implementation, Lassen, Modoc,
Shasta and Siskiyou Counties, CA
Summary: EPA continues to have environmental concerns about water
quality, soil condition and rangeland habitat, and requested that BLM
focus on relieving grazing pressure in Category 1 rangelands until
these areas improve. EPA also requested the closure of OHV route
segments adjacent to waters to improve soil conditions, habitat, and
water quality.
EIS No. 20070236, ERP No. F-BLM-K65307-00, Eagle Lake Field Office
Project, Resource Management Plan, Implementation, Lassen, Plumas,
Sierra Counties, CA and Washoe County, NV
Summary: EPA continues to have environmental concerns about water
quality and soil condition and rangeland habitat, and requested that
BLM focus on relieving grazing pressure in Category 1 rangelands until
these areas improve. EPA also requested the closure of additional OHV
route segments adjacent to waters to improve soil conditions, habitat,
and water quality.
EIS No. 20070240, ERP No. F-AFS-J65401-00, Northern Rockies Lynx
Management Direction, Selected Alternative F, Conservation and Promote
Recovery of the Canada Lynx, NFS and BLM to Amend Land Resource
Management Plans for 18 National Forests (NF), MT, WY, UT, and ID
Summary: EPA continues to have environmental concerns about
mitigation measures to protect the lynx and its habitat.
EIS No. 20070283, ERP No. F-AFS-L65532-OR, Five Buttes Project, Conduct
Vegetation Management Activities, Implementation, Deschutes National
Forest, Crescent Ranger District, Deschutes County, OR
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20070293, ERP No. F-SFW-A65170-00, Light Goose Management Plan,
Reducing and Stabilizing Specific Populations ``Light Geese'' in North
America, Implementation
Summary: EPA does not object to the proposed action.
EIS No. 20070254, ERP No. FS-TVA-E06008-TN, Watts Bar Nuclear Plant
Unit 2, Completion and Operation, Updated Information on Extensive
Environmental Record, Rhea County, TN
Summary: EPA continues to have environmental concerns about the
ongoing need for appropriate storage and ultimate disposition of
radioactive waste generated on-site. EPA also has concerns about the
lack of measures to limit bioentrainment and other impacts to aquatic
species from surface water withdrawals and discharges.
Dated: August 7, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-15714 Filed 8-9-07; 8:45 am]
BILLING CODE 6560-50-P