aquatic resources and wildlife habitat
from new road construction and impacts
from existing roads need maintenance,
and suggested that the final EIS include
additional information on implementing
proposed road closures.
Rating EC2.
EIS No. 20070222, ERP No. D–AFS–
J65484–MT, Grizzly Vegetation and
Transportation Management Project,
Proposes Timber Harvest, Prescribed
Burning, Road Maintenance, and
Transportation Management Actions,
Three Rivers Ranger District, Kootenai
National Forest, Lincoln County, MT
Summary: EPA expressed
environmental concerns about
potential adverse impacts to soil and
water quality.
Rating EC2.
EIS No. 20070238, ERP No. D–AFS–
K65328–00, Mt. Ashland LateSuccessional Reserve Habitat
Restoration and Fuels Reduction
Project, To Promote and Maintain
Late-Successional Habitat, Oak Ranger
District, Klamath National Forest,
Siskiyou County, CA and Jackson
County, OR
Summary: EPA expressed
environmental concerns about
impacts to riparian areas and the
watershed from proposed silviculture
treatments and recommended that the
Final EIS include information about
potential source water locations in the
project area, and identify Alternative
5 as the Preferred Alternative.
Rating EC2.
Final EISs
EIS No. 20070219, ERP No. F–AFS–
J65478–00, Norwood Project, Proposes
to Implement Multiple Resource
Management Actions, Black Hills
National Forest, Hell Canyon Ranger
District, Pennington County, SD and
Weston and Crook Counties, WY
Summary: The final EIS and additional
information adequately addressed
EPA’s concerns with impacts to water
quality soils and wetlands, roads,
sedimentation and OHV use, invasive
and noxious weeds, and wildlife
habitat; therefore, EPA does not object
to this proposed action.
EIS No. 20070233, ERP No. F–NPS–
J65461–CO, Great Sand Dunes
National and Preserve. General
Management Plan/Wilderness Study,
Implementation, Alamos and
Saguache Counties, CO
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070235, ERP No. F–BLM–
K65306–CA, Alturas Field Office
Project, Resource Management Plan,
VerDate Aug<31>2005
16:37 Aug 09, 2007
Jkt 211001
Implementation, Alturas Field Office
Project, Resource Management Plan,
Implementation, Lassen, Modoc,
Shasta and Siskiyou Counties, CA
Summary: EPA continues to have
environmental concerns about water
quality, soil condition and rangeland
habitat, and requested that BLM focus
on relieving grazing pressure in
Category 1 rangelands until these areas
improve. EPA also requested the closure
of OHV route segments adjacent to
waters to improve soil conditions,
habitat, and water quality.
EIS No. 20070236, ERP No. F–BLM–
K65307–00, Eagle Lake Field Office
Project, Resource Management Plan,
Implementation, Lassen, Plumas,
Sierra Counties, CA and Washoe
County, NV
Summary: EPA continues to have
environmental concerns about water
quality and soil condition and
rangeland habitat, and requested that
BLM focus on relieving grazing pressure
in Category 1 rangelands until these
areas improve. EPA also requested the
closure of additional OHV route
segments adjacent to waters to improve
soil conditions, habitat, and water
quality.
EIS No. 20070240, ERP No. F–AFS–
J65401–00, Northern Rockies Lynx
Management Direction, Selected
Alternative F, Conservation and
Promote Recovery of the Canada
Lynx, NFS and BLM to Amend Land
Resource Management Plans for 18
National Forests (NF), MT, WY, UT,
and ID
Summary: EPA continues to have
environmental concerns about
mitigation measures to protect the lynx
and its habitat.
EIS No. 20070283, ERP No. F–AFS–
L65532–OR, Five Buttes Project,
Conduct Vegetation Management
Activities, Implementation, Deschutes
National Forest, Crescent Ranger
District, Deschutes County, OR
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20070293, ERP No. F–SFW–
A65170–00, Light Goose Management
Plan, Reducing and Stabilizing
Specific Populations ‘‘Light Geese’’ in
North America, Implementation
Summary: EPA does not object to the
proposed action.
EIS No. 20070254, ERP No. FS–TVA–
E06008–TN, Watts Bar Nuclear Plant
Unit 2, Completion and Operation,
Updated Information on Extensive
Environmental Record, Rhea County,
TN
Summary: EPA continues to have
environmental concerns about the
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
ongoing need for appropriate storage
and ultimate disposition of radioactive
waste generated on-site. EPA also has
concerns about the lack of measures to
limit bioentrainment and other impacts
to aquatic species from surface water
withdrawals and discharges.
Dated: August 7, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7–15714 Filed 8–9–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6689–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 07/30/2007 Through 08/03/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070328, Final Supplement,
BLM, MT, Golden Sunlight Mine Pit
Reclamation Alternatives, Preferred
Alternative Selected is the
Underground Sump Alternative,
Operating Permit No. 00065 and Planof-Operations #MTM 82855,
Whitehall, Jefferson County, MT, Wait
Period Ends: 09/10/2007, Contact:
David Williams 406–533–7655.
EIS No. 20070329, Final EIS, GSA, OH,
Cincinnati National Institute for
Occupational Safety and Health
(NIOSH) Laboratories Consolidation,
Site Selection, Hamilton and
Clermont Counties, OH, Wait Period
Ends: 09/10/2007, Contact: Phil
Youngberg 404–433–8393.
EIS No. 20070330, Draft EIS, IBW, CA,
PROGRAMMATIC—Tijuana River
Flood Control Project, Proposing a
Range of Alternatives for Maintenance
Activities and Future Improvements,
San Diego County, CA, Comment
Period Ends: 09/24/2007, Contact:
Daniel Borunda 915–832–4767.
EIS No. 20070331, Draft EIS, IBW, TX,
PROGRAMMATIC—Rio Grande Flood
Control Projects, Proposing a Range of
Alternatives for Maintenances
Activities and Future Improvements,
along the Texas-Mexico Border,
Comment Period Ends: 09/24/2007,
Contact: Daniel Borunda 915–832–
4767.
EIS No. 20070332, Draft EIS BLM, OR,
Western Oregon Bureau of Land
Management Districts of Salem,
E:\FR\FM\10AUN1.SGM
10AUN1
sroberts on PROD1PC70 with PROPOSALS
Federal Register / Vol. 72, No. 154 / Friday, August 10, 2007 / Notices
Eugene, Roseburg, Coos Bay, and
Medford Districts, and the Klamath
Falls Resource Area of Lakeview
District, Revision of the Resource
Management Plans, Implementation,
OR, Comment Period Ends: 11/09/
2007, Contact: Dick Prather 503–808–
6627.
EIS No. 20070333, Final EIS, AFS, OR,
Spears Vegetation Management
Project, Proposal to Use Commercial
Timber Harvest, Precommercial
Thinning, Prescribed Fire, Grapple
Piling and Hand Piling in the Mark
Creek Watershed and Veaqie Creek
Subwatershed, Lookout Mountain
Ranger District, Ochoco National
Forest, Crook and Wheeler Counties,
OR, Wait Period Ends: 09/10/2007,
Contact: Katherine Farrell 541–416–
6500.
EIS No. 20070334, Final EIS, AFS, CO,
Lizard Head Road Easement,
Application from Private Landowners
Requesting a Permit to Cross Public
Lands to Access Non-Federal Lands,
San Juan National Forest, Dolores
Ranger District, Dolores County, CO,
Wait Period Ends: 09/10/2007,
Contact: Jim Powers 970–385–1211.
EIS No. 20070335, Final EIS, NRC, VT
Generic—License Renewal of Nuclear
Plants, Supplement 30 to
NUREG1437, Regarding Vermont
Yankee Nuclear Power Station,
Vernon, VT, Wait Period Ends: 09/10/
2007, Contact: Richard L. Emch 301–
415–1570.
EIS No. 20070336, Final EIS, FHW, UT,
South Logan to Providence
Transportation Corridor Project,
Improvements to 100 East Street
between 300 South (Logan) to
Providence Lane (100 North) in
Providence, Funding and Right-ofWay Grant, Cities of Logan and
Providence, Cache County, UT, Wait
Period Ends: 09/10/2007, Contact:
Doug Atkin 801–963–0182.
EIS No. 20070337, Final EIS, TVA, AL,
Bear Creek Dam Leakage Resolution
Project, To Modify Dam and Maintain
Summer Pool Level of 576 Feet, Bear
Creek Dam, Franklin County, AL,
Wait Period Ends: 09/10/2007,
Contact: Charles P. Nicholson 865–
632–3582.
EIS No. 20070338, Draft Supplement,
TVA, TN, Watts Bar Reservoir Land
Management Plan, Amend and
Update the 2005 Plan, Guide Land
Use Approvals, Private Water Use
Facility, and Resource Management
Decisions, Loudon, Meigs, Rhea and
Roane Counties, TN, Comment Period
Ends: 09/24/2007, Contact: Richard L.
Toennisson 865–632–8517.
EIS No. 20070339, Draft EIS, COE, GU,
Apra Harbor Master Plan for Deep-
VerDate Aug<31>2005
16:37 Aug 09, 2007
Jkt 211001
Draft Wharf and Fill Improvements,
Implementation, Piti, Guam,
Comment Period Ends: 09/24/2007,
Contact: James Hatashima 808–438–
2264.
EIS No. 20070340, Final EIS, FRC, 00,
Southeast Expansion Project,
Construction and Operation of 110.8
miles for Natural Gas Pipeline and
Associated Ancillary Facilities, TX
and LA, Wait Period Ends: 09/10/
2007, Contact: Andy Black 1–866–
208–3372.
EIS No. 20070341, Final EIS, NPS, MA,
Cape Cod National Seashore (CACO)
Hunting Program, General
Management Plan, Implementation,
Barnstable County, MA, Wait Period
Ends: 09/10/2007, Contact: Carrie
Phillips 508–349–3785 Ext. 216.
EIS No. 20070342, Final EIS, FRC, GA,
Elba III Project, Construct, Operate
and Acquire Facilities to move ReVaporized Liquefied Natural Gas
(LNG), U.S. Army COE Section 10 and
404 Permits and U.S. Coast Guard
Permit, Elba Island, Chatham County,
GA, Wait Period Ends: 09/10/2007,
Contact: Andy Black 1–866–208–
3372.
EIS No. 20070343, Draft EIS, STA, 00,
Keystone Oil Pipeline Project,
Proposed Construction, Connection,
Operation and Maintenance,
Applicant for Presidential Permit, ND,
SD, NE, KS, MO, IL and OK,
Comment Period Ends: 09/24/2007,
Contact: Elizabeth Orlando 202–647–
4284.
EIS No. 20070344, Draft EIS, FHW, VT,
Circ-Williston Transportation Project,
Improvements between I–89 and the
Towns Williston and Essex and the
Village of Essex Junction, City of
Burlington, Chittenden County, VT,
Comment Period Ends: 11/08/2007,
Contact: Kenneth R. Sikora, Jr. 802–
828–4424.
Amended Notices
EIS No. 20070266, Draft EIS, SFW, 00,
Lake Umbagog National Wildlife
Refuge, Comprehensive Conservation
Plan, 15 Year Guidance for
Management of Refuge Operations,
Habitat and Visitor Services,
Implementation, Coos County, NH
and Oxford County, ME, Comment
Period Ends: 09/21/2007, Contact:
Nancy McGarigal 413–253–8562
Revision of FR Notice Published 07/
06/2007: Extending Comment Period
from 08/20/2007 to 09/21/2007.
EIS No. 20070307, Draft EIS, USA, 00,
Permanent Home Stationing of the
2/25th Stryker Brigade Combat Team
(SBECT), to Address a Full Range of
Alternatives for Permanently
Stationing the 2/25th SBCT, Hawaii
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
45045
and Honolulu Counties, HI;
Anchorage and Southeast Fairbanks
Boroughs, AK; El Paso, Pueblo, and
Fremont Counties, CO, Comment
Period Ends: 10/30/2007, Contact:
Michael Ackerman 410–436–2522.
Revision of FR Notice Published 07/
20/2007; Extending Comment Period
from 09/04/2007 to 10/30/2007.
EIS No. 20070322, Draft EIS, NPS, AZ,
Saguaro National Park General
Management Plan, Implementation,
Rincon Mountain District and Tucson
Mountain District, Pima County, AZ,
Comment Period Ends: 10/02/2007,
Contact: Mary McVeigh 303–969–
2442. Revision of FR Notice Published
08/03/2007: Correction to Comment
Period from 09/17/2007 to 10/02/
2007.
Dated: August 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 07–3921 Filed 8–9–07; 8:45 am]
BILLING CODE 6560–50–M
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8453–2; Docket ID No. EPA–HQORD–
2007–0667]
Climate and Land Use Change Effects
on Ecological Resources in Three
Watersheds: A Synthesis Report
Environmental Protection
Agency (EPA).
ACTION: Notice of public comment
period.
AGENCY:
SUMMARY: EPA is announcing a 30-day
public comment period for the draft
document titled, ‘‘Climate and Land Use
Change Effects on Ecological Resources
in Three Watersheds: A Synthesis
Report’’ (EPA/600/R–07/086). The
document was prepared by the National
Center for Environmental Assessment
within EPA’s Office of Research and
Development.
EPA is releasing this draft document
solely for the purpose of predissemination peer review under
applicable information quality
guidelines. This document has not been
formally disseminated by EPA. It does
not represent and should not be
construed to represent any Agency
policy or determination. EPA intends to
consider any public comments
submitted in accordance with this
notice when revising the document.
DATES: The 30-day public comment
period begins August 10, 2007, and ends
September 10, 2007. Technical
comments should be in writing and
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 72, Number 154 (Friday, August 10, 2007)]
[Notices]
[Pages 45044-45045]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 07-3921]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6689-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 07/30/2007 Through 08/03/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070328, Final Supplement, BLM, MT, Golden Sunlight Mine Pit
Reclamation Alternatives, Preferred Alternative Selected is the
Underground Sump Alternative, Operating Permit No. 00065 and Plan-of-
Operations MTM 82855, Whitehall, Jefferson County, MT, Wait
Period Ends: 09/10/2007, Contact: David Williams 406-533-7655.
EIS No. 20070329, Final EIS, GSA, OH, Cincinnati National Institute for
Occupational Safety and Health (NIOSH) Laboratories Consolidation, Site
Selection, Hamilton and Clermont Counties, OH, Wait Period Ends: 09/10/
2007, Contact: Phil Youngberg 404-433-8393.
EIS No. 20070330, Draft EIS, IBW, CA, PROGRAMMATIC--Tijuana River Flood
Control Project, Proposing a Range of Alternatives for Maintenance
Activities and Future Improvements, San Diego County, CA, Comment
Period Ends: 09/24/2007, Contact: Daniel Borunda 915-832-4767.
EIS No. 20070331, Draft EIS, IBW, TX, PROGRAMMATIC--Rio Grande Flood
Control Projects, Proposing a Range of Alternatives for Maintenances
Activities and Future Improvements, along the Texas-Mexico Border,
Comment Period Ends: 09/24/2007, Contact: Daniel Borunda 915-832-4767.
EIS No. 20070332, Draft EIS BLM, OR, Western Oregon Bureau of Land
Management Districts of Salem,
[[Page 45045]]
Eugene, Roseburg, Coos Bay, and Medford Districts, and the Klamath
Falls Resource Area of Lakeview District, Revision of the Resource
Management Plans, Implementation, OR, Comment Period Ends: 11/09/2007,
Contact: Dick Prather 503-808-6627.
EIS No. 20070333, Final EIS, AFS, OR, Spears Vegetation Management
Project, Proposal to Use Commercial Timber Harvest, Precommercial
Thinning, Prescribed Fire, Grapple Piling and Hand Piling in the Mark
Creek Watershed and Veaqie Creek Subwatershed, Lookout Mountain Ranger
District, Ochoco National Forest, Crook and Wheeler Counties, OR, Wait
Period Ends: 09/10/2007, Contact: Katherine Farrell 541-416-6500.
EIS No. 20070334, Final EIS, AFS, CO, Lizard Head Road Easement,
Application from Private Landowners Requesting a Permit to Cross Public
Lands to Access Non-Federal Lands, San Juan National Forest, Dolores
Ranger District, Dolores County, CO, Wait Period Ends: 09/10/2007,
Contact: Jim Powers 970-385-1211.
EIS No. 20070335, Final EIS, NRC, VT Generic--License Renewal of
Nuclear Plants, Supplement 30 to NUREG1437, Regarding Vermont Yankee
Nuclear Power Station, Vernon, VT, Wait Period Ends: 09/10/2007,
Contact: Richard L. Emch 301-415-1570.
EIS No. 20070336, Final EIS, FHW, UT, South Logan to Providence
Transportation Corridor Project, Improvements to 100 East Street
between 300 South (Logan) to Providence Lane (100 North) in Providence,
Funding and Right-of-Way Grant, Cities of Logan and Providence, Cache
County, UT, Wait Period Ends: 09/10/2007, Contact: Doug Atkin 801-963-
0182.
EIS No. 20070337, Final EIS, TVA, AL, Bear Creek Dam Leakage Resolution
Project, To Modify Dam and Maintain Summer Pool Level of 576 Feet, Bear
Creek Dam, Franklin County, AL, Wait Period Ends: 09/10/2007, Contact:
Charles P. Nicholson 865-632-3582.
EIS No. 20070338, Draft Supplement, TVA, TN, Watts Bar Reservoir Land
Management Plan, Amend and Update the 2005 Plan, Guide Land Use
Approvals, Private Water Use Facility, and Resource Management
Decisions, Loudon, Meigs, Rhea and Roane Counties, TN, Comment Period
Ends: 09/24/2007, Contact: Richard L. Toennisson 865-632-8517.
EIS No. 20070339, Draft EIS, COE, GU, Apra Harbor Master Plan for Deep-
Draft Wharf and Fill Improvements, Implementation, Piti, Guam, Comment
Period Ends: 09/24/2007, Contact: James Hatashima 808-438-2264.
EIS No. 20070340, Final EIS, FRC, 00, Southeast Expansion Project,
Construction and Operation of 110.8 miles for Natural Gas Pipeline and
Associated Ancillary Facilities, TX and LA, Wait Period Ends: 09/10/
2007, Contact: Andy Black 1-866-208-3372.
EIS No. 20070341, Final EIS, NPS, MA, Cape Cod National Seashore (CACO)
Hunting Program, General Management Plan, Implementation, Barnstable
County, MA, Wait Period Ends: 09/10/2007, Contact: Carrie Phillips 508-
349-3785 Ext. 216.
EIS No. 20070342, Final EIS, FRC, GA, Elba III Project, Construct,
Operate and Acquire Facilities to move Re-Vaporized Liquefied Natural
Gas (LNG), U.S. Army COE Section 10 and 404 Permits and U.S. Coast
Guard Permit, Elba Island, Chatham County, GA, Wait Period Ends: 09/10/
2007, Contact: Andy Black 1-866-208-3372.
EIS No. 20070343, Draft EIS, STA, 00, Keystone Oil Pipeline Project,
Proposed Construction, Connection, Operation and Maintenance, Applicant
for Presidential Permit, ND, SD, NE, KS, MO, IL and OK, Comment Period
Ends: 09/24/2007, Contact: Elizabeth Orlando 202-647-4284.
EIS No. 20070344, Draft EIS, FHW, VT, Circ-Williston Transportation
Project, Improvements between I-89 and the Towns Williston and Essex
and the Village of Essex Junction, City of Burlington, Chittenden
County, VT, Comment Period Ends: 11/08/2007, Contact: Kenneth R.
Sikora, Jr. 802-828-4424.
Amended Notices
EIS No. 20070266, Draft EIS, SFW, 00, Lake Umbagog National Wildlife
Refuge, Comprehensive Conservation Plan, 15 Year Guidance for
Management of Refuge Operations, Habitat and Visitor Services,
Implementation, Coos County, NH and Oxford County, ME, Comment Period
Ends: 09/21/2007, Contact: Nancy McGarigal 413-253-8562 Revision of FR
Notice Published 07/06/2007: Extending Comment Period from 08/20/2007
to 09/21/2007.
EIS No. 20070307, Draft EIS, USA, 00, Permanent Home Stationing of the
2/25th Stryker Brigade Combat Team (SBECT), to Address a Full Range of
Alternatives for Permanently Stationing the 2/25th SBCT, Hawaii and
Honolulu Counties, HI; Anchorage and Southeast Fairbanks Boroughs, AK;
El Paso, Pueblo, and Fremont Counties, CO, Comment Period Ends: 10/30/
2007, Contact: Michael Ackerman 410-436-2522. Revision of FR Notice
Published 07/20/2007; Extending Comment Period from 09/04/2007 to 10/
30/2007.
EIS No. 20070322, Draft EIS, NPS, AZ, Saguaro National Park General
Management Plan, Implementation, Rincon Mountain District and Tucson
Mountain District, Pima County, AZ, Comment Period Ends: 10/02/2007,
Contact: Mary McVeigh 303-969-2442. Revision of FR Notice Published 08/
03/2007: Correction to Comment Period from 09/17/2007 to 10/02/2007.
Dated: August 6, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 07-3921 Filed 8-9-07; 8:45 am]