Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, 43534 [E7-15163]
Download as PDF
43534
Federal Register / Vol. 72, No. 150 / Monday, August 6, 2007 / Rules and Regulations
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: July 25, 2007.
Waverly W. Gregory, Jr.,
Chief, Bridge Administration Branch, Fifth
Coast Guard District.
[FR Doc. E7–15161 Filed 8–3–07; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–07–093]
Drawbridge Operation Regulations;
Hackensack River, Jersey City, NJ
Coast Guard, DHS.
ACTION: Notice of temporary deviation
from regulations.
cprice-sewell on PROD1PC62 with RULES
AGENCY:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the NJTRO Lower Hack
Bridge across the Hackensack River,
mile 3.4, at Jersey City, New Jersey.
Under this temporary deviation, in
effect for four weekends, July 28 and 29,
August 4 and 5, August 11 and 12, and
August 18 and 19, 2007, the NJTRO
Lower Hack Bridge may remain in the
closed position, each Saturday morning
from 7 a.m. through each Sunday
evening at 7 p.m. Vessels that can pass
under the draw without a bridge
opening may do so at all times. This
deviation is necessary to facilitate aerial
cable installation at the bridge.
DATES: This deviation is effective from
July 28, 2007 through August 19, 2007.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, One
South Street, New York, New York
10004, between 7 a.m. and 3 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (212)
668–7165. The First Coast Guard
District Bridge Branch Office maintains
the public docket for this temporary
deviation.
Joe
Arca, Project Officer, First Coast Guard
District, at (212) 668–7165.
FOR FURTHER INFORMATION CONTACT:
VerDate Aug<31>2005
15:24 Aug 03, 2007
Jkt 211001
The
NJTRO Lower Hack Bridge, across the
Hackensack River, mile 3.4, at Jersey
City, New Jersey, has a vertical
clearance in the closed position of 40
feet at mean high water and 45 feet at
mean low water. The existing
drawbridge operation regulations are
listed at 33 CFR 117.723(b).
The owner of the bridge, New Jersey
Transit Rail Operation (NJTRO),
requested a temporary deviation to
facilitate aerial cable installation at the
bridge.
Under this temporary deviation the
NJTRO Lower Hack Bridge need not
open for the passage of vessel traffic for
four weekends, July 28 and 29, August
4 and 5, August 11 and 12, and August
18 and 19, 2007, from 7 a.m. each
Saturday morning through 7 p.m. each
Sunday evening. Vessels that can pass
under the bridge without a bridge
opening may do so at all times.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
Dated: July 26, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E7–15163 Filed 8–3–07; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–07–112]
Drawbridge Operation Regulations;
Mystic River, Charlestown and Boston,
MA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the S99 Alford Street
Bridge across the Mystic River, mile 1.4,
between Charlestown and Boston,
Massachusetts. Under this temporary
deviation the S99 Alford Street Bridge
may remain in the closed position from
7 a.m. through 7 p.m. on July 27, 2007.
In addition, the bridge may remain in
PO 00000
Frm 00032
Fmt 4700
Sfmt 4700
the closed position from 7 a.m. on
August 28, 2007 through 11:59 p.m. on
August 30, 2007. Vessels that can pass
under the draw without a bridge
opening may do so at all times. This
deviation is necessary to facilitate
emergency mechanical repairs.
This deviation is effective from
7 a.m. on July 27, 2007 through 11:59
p.m. on August 30, 2007.
DATES:
Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, 408
Atlantic Avenue, Boston, Massachusetts
02110, between 7 a.m. and 3 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (617)
223–8364. The First Coast Guard
District Bridge Branch Office maintains
the public docket for this temporary
deviation.
ADDRESSES:
John
McDonald, Project Officer, First Coast
Guard District, at (617) 223–8364.
FOR FURTHER INFORMATION CONTACT:
The S99
Alford Street Bridge across the Mystic
River, mile 1.4, between Charlestown
and Boston, Massachusetts, has a
vertical clearance in the closed position
of 7 feet at mean high water and 16 feet
at mean low water. The existing
drawbridge operation regulations are
listed at 33 CFR 117.609(a).
The owner of the bridge, the City of
Boston, requested a temporary deviation
to facilitate emergency mechanical
repairs at the bridge that must be
performed with all due speed to assure
safe continued operation of the bridge.
Under this temporary deviation the
S99 Alford Street Bridge need not open
for the passage of vessel traffic from 7
a.m. on July 27, 2007 through 7 p.m. on
July 27, 2007 and from 7 a.m. on August
28, 2007 through 11:59 p.m. on August
30, 2007. Vessels that can pass under
the bridge without a bridge opening may
do so at all times.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.36.
SUPPLEMENTARY INFORMATION:
Dated: July 26, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E7–15162 Filed 8–3–07; 8:45 am]
BILLING CODE 4910–15–P
E:\FR\FM\06AUR1.SGM
06AUR1
Agencies
[Federal Register Volume 72, Number 150 (Monday, August 6, 2007)]
[Rules and Regulations]
[Page 43534]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-15163]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-07-093]
Drawbridge Operation Regulations; Hackensack River, Jersey City,
NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
NJTRO Lower Hack Bridge across the Hackensack River, mile 3.4, at
Jersey City, New Jersey. Under this temporary deviation, in effect for
four weekends, July 28 and 29, August 4 and 5, August 11 and 12, and
August 18 and 19, 2007, the NJTRO Lower Hack Bridge may remain in the
closed position, each Saturday morning from 7 a.m. through each Sunday
evening at 7 p.m. Vessels that can pass under the draw without a bridge
opening may do so at all times. This deviation is necessary to
facilitate aerial cable installation at the bridge.
DATES: This deviation is effective from July 28, 2007 through August
19, 2007.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the First Coast Guard District, Bridge Branch
Office, One South Street, New York, New York 10004, between 7 a.m. and
3 p.m., Monday through Friday, except Federal holidays. The telephone
number is (212) 668-7165. The First Coast Guard District Bridge Branch
Office maintains the public docket for this temporary deviation.
FOR FURTHER INFORMATION CONTACT: Joe Arca, Project Officer, First Coast
Guard District, at (212) 668-7165.
SUPPLEMENTARY INFORMATION: The NJTRO Lower Hack Bridge, across the
Hackensack River, mile 3.4, at Jersey City, New Jersey, has a vertical
clearance in the closed position of 40 feet at mean high water and 45
feet at mean low water. The existing drawbridge operation regulations
are listed at 33 CFR 117.723(b).
The owner of the bridge, New Jersey Transit Rail Operation (NJTRO),
requested a temporary deviation to facilitate aerial cable installation
at the bridge.
Under this temporary deviation the NJTRO Lower Hack Bridge need not
open for the passage of vessel traffic for four weekends, July 28 and
29, August 4 and 5, August 11 and 12, and August 18 and 19, 2007, from
7 a.m. each Saturday morning through 7 p.m. each Sunday evening.
Vessels that can pass under the bridge without a bridge opening may do
so at all times.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 26, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E7-15163 Filed 8-3-07; 8:45 am]