Enbridge Pipelines (Southern Lights) LLC; Notice of Petition for Declaratory Order, 43265 [E7-15074]

Download as PDF Federal Register / Vol. 72, No. 149 / Friday, August 3, 2007 / Notices become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 20, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–15073 Filed 8–2–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E7–15074 Filed 8–2–07; 8:45 am] [Docket No. OR07–15-000] Enbridge Pipelines (Southern Lights) LLC; Notice of Petition for Declaratory Order mstockstill on PROD1PC66 with NOTICES BILLING CODE 6717–01–P DEPARTMENT OF ENERGY July 27, 2007. Take notice that on July 20, 2007, Enbridge Pipelines (Southern Lights) LLC (EPSL), pursuant to Rule 207(a)(2) of the Commission’s Rules of Practice and Procedures, 18 CFR 385.207(a)(2) (2007), tendered for filing a petition to the Commission to issue a declaratory order confirming the proposed rate structure for the planned Southern Lights Pipeline, which will transport light liquid hydrocarbons from Chico, Illinois to Edmonton, Alberta. EPSL is only seeking Commission rulings with respect to the portion of the Southern Lights Pipeline that will be built and operated in the United States. VerDate Aug<31>2005 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Comment Date: 5 p.m. Eastern Time on August 10, 2007. 18:17 Aug 02, 2007 Jkt 211001 Federal Energy Regulatory Commission [Docket No. CP07–421–000] Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization July 27, 2007. Take notice that on July 17, 2007, Southern Star Central Gas Pipeline, Inc (Southern Star), 4700 Highway 56, Owensboro, Kentucky 42301, filed in Docket No. CP07–421–000 a prior notice request pursuant to sections 157.205 and 157.211 of the Commission’s PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 43265 regulations under the Natural Gas Act (NGA) to construct and operate a new 12-inch delivery meter station and interconnecting facilities to serve as a bypass of a local distribution company. The proposed facilities would serve Aquila, Inc. (Aquila) d/b/a Aquilia Networks at Aquila’s electric generating plant Buchanan County, Missouri, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Specifically, Southern Star proposes to install a side valve, an 8-inch lateral pipeline approximately 59 feet long, a flow computer and communications equipment necessary for the new interconnection with Aquila. Aquila will construct associated metering facilities within its electric generation plant site. The new meter station will be known as the Aquila-St. Joe/Lake Road Delivery Measurement setting #16911. The cost of the facilities is estimated to be $296,000. Aquila currently receives its natural gas service from Missouri Gas Energy (MGE), a local distribution company. Aquila wishes to receive its primary gas service from Southern Star and would maintain its connection with MGE in order to serve as backup gas delivery service. Aquila has requested Southern Star to provide interruptible natural gas delivery service to its electric generating plant of up to 17,500 Mcf per day through the delivery point described above. Southern Star states that it has notified MGE of the proposed delivery point directly. Any questions concerning this application may be directed to David N. Roberts, Manager of Regulatory Affairs, Southern Star Central Gas Pipeline, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, or telephone (270) 852–4654. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be E:\FR\FM\03AUN1.SGM 03AUN1

Agencies

[Federal Register Volume 72, Number 149 (Friday, August 3, 2007)]
[Notices]
[Page 43265]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-15074]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR07-15-000]


Enbridge Pipelines (Southern Lights) LLC; Notice of Petition for 
Declaratory Order

July 27, 2007.
    Take notice that on July 20, 2007, Enbridge Pipelines (Southern 
Lights) LLC (EPSL), pursuant to Rule 207(a)(2) of the Commission's 
Rules of Practice and Procedures, 18 CFR 385.207(a)(2) (2007), tendered 
for filing a petition to the Commission to issue a declaratory order 
confirming the proposed rate structure for the planned Southern Lights 
Pipeline, which will transport light liquid hydrocarbons from Chico, 
Illinois to Edmonton, Alberta. EPSL is only seeking Commission rulings 
with respect to the portion of the Southern Lights Pipeline that will 
be built and operated in the United States.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on August 10, 2007.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-15074 Filed 8-2-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.