Enbridge Pipelines (Southern Lights) LLC; Notice of Petition for Declaratory Order, 43265 [E7-15074]
Download as PDF
Federal Register / Vol. 72, No. 149 / Friday, August 3, 2007 / Notices
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 20, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–15073 Filed 8–2–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E7–15074 Filed 8–2–07; 8:45 am]
[Docket No. OR07–15-000]
Enbridge Pipelines (Southern Lights)
LLC; Notice of Petition for Declaratory
Order
mstockstill on PROD1PC66 with NOTICES
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
July 27, 2007.
Take notice that on July 20, 2007,
Enbridge Pipelines (Southern Lights)
LLC (EPSL), pursuant to Rule 207(a)(2)
of the Commission’s Rules of Practice
and Procedures, 18 CFR 385.207(a)(2)
(2007), tendered for filing a petition to
the Commission to issue a declaratory
order confirming the proposed rate
structure for the planned Southern
Lights Pipeline, which will transport
light liquid hydrocarbons from Chico,
Illinois to Edmonton, Alberta. EPSL is
only seeking Commission rulings with
respect to the portion of the Southern
Lights Pipeline that will be built and
operated in the United States.
VerDate Aug<31>2005
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208-3676 (toll free). For TTY, call
(202) 502-8659.
Comment Date: 5 p.m. Eastern Time
on August 10, 2007.
18:17 Aug 02, 2007
Jkt 211001
Federal Energy Regulatory
Commission
[Docket No. CP07–421–000]
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization
July 27, 2007.
Take notice that on July 17, 2007,
Southern Star Central Gas Pipeline, Inc
(Southern Star), 4700 Highway 56,
Owensboro, Kentucky 42301, filed in
Docket No. CP07–421–000 a prior notice
request pursuant to sections 157.205
and 157.211 of the Commission’s
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
43265
regulations under the Natural Gas Act
(NGA) to construct and operate a new
12-inch delivery meter station and
interconnecting facilities to serve as a
bypass of a local distribution company.
The proposed facilities would serve
Aquila, Inc. (Aquila) d/b/a Aquilia
Networks at Aquila’s electric generating
plant Buchanan County, Missouri, all as
more fully set forth in the application,
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Specifically, Southern Star proposes
to install a side valve, an 8-inch lateral
pipeline approximately 59 feet long, a
flow computer and communications
equipment necessary for the new
interconnection with Aquila. Aquila
will construct associated metering
facilities within its electric generation
plant site. The new meter station will be
known as the Aquila-St. Joe/Lake Road
Delivery Measurement setting #16911.
The cost of the facilities is estimated to
be $296,000.
Aquila currently receives its natural
gas service from Missouri Gas Energy
(MGE), a local distribution company.
Aquila wishes to receive its primary gas
service from Southern Star and would
maintain its connection with MGE in
order to serve as backup gas delivery
service. Aquila has requested Southern
Star to provide interruptible natural gas
delivery service to its electric generating
plant of up to 17,500 Mcf per day
through the delivery point described
above. Southern Star states that it has
notified MGE of the proposed delivery
point directly.
Any questions concerning this
application may be directed to David N.
Roberts, Manager of Regulatory Affairs,
Southern Star Central Gas Pipeline, Inc.,
4700 Highway 56, Owensboro,
Kentucky 42301, or telephone (270)
852–4654.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
E:\FR\FM\03AUN1.SGM
03AUN1
Agencies
[Federal Register Volume 72, Number 149 (Friday, August 3, 2007)]
[Notices]
[Page 43265]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-15074]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR07-15-000]
Enbridge Pipelines (Southern Lights) LLC; Notice of Petition for
Declaratory Order
July 27, 2007.
Take notice that on July 20, 2007, Enbridge Pipelines (Southern
Lights) LLC (EPSL), pursuant to Rule 207(a)(2) of the Commission's
Rules of Practice and Procedures, 18 CFR 385.207(a)(2) (2007), tendered
for filing a petition to the Commission to issue a declaratory order
confirming the proposed rate structure for the planned Southern Lights
Pipeline, which will transport light liquid hydrocarbons from Chico,
Illinois to Edmonton, Alberta. EPSL is only seeking Commission rulings
with respect to the portion of the Southern Lights Pipeline that will
be built and operated in the United States.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on August 10, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-15074 Filed 8-2-07; 8:45 am]