Drawbridge Operation Regulations; China Basin, San Francisco, CA, 40239 [E7-14203]
Download as PDF
Federal Register / Vol. 72, No. 141 / Tuesday, July 24, 2007 / Rules and Regulations
and (f)(2)(ii)(I); and adding a new
paragraph (g)(1)(vii) to read as follows:’’
DEPARTMENT OF HOMELAND
SECURITY
§ 1310.04
Coast Guard
Maintenance of records.
*
*
*
*
*
(g) * * *
(1) * * *
(vii) Iodine
*
*
*
*
*
I 3. On page 35931, amendment 7 is
corrected to read as follows: ‘‘7. Section
1310.09 is amended by adding new
paragraph (i) to read as follows:’’
§ 1310.09 Temporary exemption from
registration.
*
*
*
*
(i) Each person required by section
302 of the Act (21 U.S.C. 822) to obtain
a registration to manufacture, distribute,
import, or export regulated iodine,
including regulated iodine chemical
mixtures pursuant to §§ 1310.12 and
1310.13, is temporarily exempted from
the registration requirement, provided
that the Administration receives a
proper application for registration or
application for exemption for a
chemical mixture containing iodine on
or before August 31, 2007. The
exemption will remain in effect for each
person who has made such application
until the Administration has approved
or denied that application. This
exemption applies only to registration;
all other chemical control requirements
set forth in the Act and parts 1309,
1310, and 1313 of this chapter remain
in full force and effect. Any person who
distributes, imports, or exports a
chemical mixture containing iodine
whose application for exemption is
subsequently denied by the
Administration must obtain a
registration with the Administration. A
temporary exemption from the
registration requirement will also be
provided for these persons, provided
that the Administration receives a
properly completed application for
registration on or before 30 days
following the date of official
Administration notification that the
application for exemption has not been
approved. The temporary exemption for
such persons will remain in effect until
the Administration takes final action on
their registration application.
pwalker on PROD1PC71 with RULES
*
Dated: July 17, 2007.
Joseph T. Rannazzisi,
Deputy Assistant Administrator, Office of
Diversion Control.
[FR Doc. E7–14317 Filed 7–23–07; 8:45 am]
BILLING CODE 4410–09–P
VerDate Aug<31>2005
17:17 Jul 23, 2007
Jkt 211001
33 CFR Part 117
[CGD11–07–012]
Drawbridge Operation Regulations;
China Basin, San Francisco, CA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, Eleventh
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the Third
Street Drawbridge across China Basin,
mile 0.0, at San Francisco, CA. The
deviation is necessary to allow the
public to cross the bridge to participate
in the scheduled San Francisco
Marathon, a community event. This
deviation allows the bridge to remain in
the closed-to-navigation position during
the marathon.
DATES: This deviation is effective from
7 a.m. through 12:30 p.m. on July 29,
2007.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at Commander (dpw), Eleventh
Coast Guard District, Building 50–2,
Coast Guard Island, Alameda, CA
94501–5100, between 8 a.m. and 4 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (510)
437–3516. The Eleventh Coast Guard
District maintains the public docket for
this temporary deviation.
FOR FURTHER INFORMATION CONTACT:
David H. Sulouff, Chief, Bridge Section,
Eleventh Coast Guard District,
telephone (510) 437–3516.
SUPPLEMENTARY INFORMATION: The City
of San Francisco requested a temporary
change to the operation of the Third
Street Drawbridge, mile 0.0, over China
Basin, at San Francisco, CA. The Third
Street Drawbridge navigation span
provides a vertical clearance of 7 feet
above Mean High Water in the closedto-navigation position. The draw opens
on signal if at least one hour notice is
given as required by 33 CFR 117.149.
Navigation on the waterway is
recreational.
The drawspan will be secured in the
closed-to-navigation position 7 a.m.
through 12:30 p.m. on July 29, 2007 to
allow participants in the San Francisco
Marathon to cross the bridge during the
event. This temporary deviation has
been coordinated with waterway users.
No objections to the proposed
temporary deviation were raised.
SUMMARY:
PO 00000
Frm 00025
Fmt 4700
Sfmt 4700
40239
Vessels that can transit the bridge,
while in the closed-to-navigation
position, may continue to do so at any
time.
In the event of an emergency the draw
can be opened with 30 minutes advance
notice.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: July 13, 2007.
C.E. Bone,
Rear Admiral, U.S. Coast Guard, Commander,
Eleventh Coast Guard District.
[FR Doc. E7–14203 Filed 7–23–07; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD05–07–074]
RIN 1625–AA–09
Drawbridge Operation Regulations;
Potomac River, Between Maryland and
Virginia
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, Fifth Coast
Guard District, has approved a
temporary deviation from the
regulations governing the operation of
the new Woodrow Wilson Memorial (I–
95) Bridge, mile 103.8, across Potomac
River between Alexandria, Virginia and
Oxon Hill, Maryland. This deviation
allows the new drawbridge to remain
closed-to-navigation each day from 10
a.m. to 2 p.m. beginning on July 23,
2007 until and including January 25,
2008, to facilitate testing and
commissioning for the new Woodrow
Wilson Bridge construction project.
DATES: This deviation is effective from
10 a.m. on July 23, 2007, until 2 p.m.
on January 25, 2008.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at Commander (dpb), Fifth
Coast Guard District, Federal Building,
1st Floor, 431 Crawford Street,
Portsmouth, VA 23704–5004 between 8
a.m. and 4 p.m., Monday through
Friday, except Federal holidays. The
telephone number is (757) 398–6222.
Commander (dpb), Fifth Coast Guard
District maintains the public docket for
this temporary deviation.
E:\FR\FM\24JYR1.SGM
24JYR1
Agencies
[Federal Register Volume 72, Number 141 (Tuesday, July 24, 2007)]
[Rules and Regulations]
[Page 40239]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-14203]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD11-07-012]
Drawbridge Operation Regulations; China Basin, San Francisco, CA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eleventh Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Third Street Drawbridge across China Basin, mile 0.0, at San Francisco,
CA. The deviation is necessary to allow the public to cross the bridge
to participate in the scheduled San Francisco Marathon, a community
event. This deviation allows the bridge to remain in the closed-to-
navigation position during the marathon.
DATES: This deviation is effective from 7 a.m. through 12:30 p.m. on
July 29, 2007.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at Commander (dpw), Eleventh Coast Guard
District, Building 50-2, Coast Guard Island, Alameda, CA 94501-5100,
between 8 a.m. and 4 p.m., Monday through Friday, except Federal
holidays. The telephone number is (510) 437-3516. The Eleventh Coast
Guard District maintains the public docket for this temporary
deviation.
FOR FURTHER INFORMATION CONTACT: David H. Sulouff, Chief, Bridge
Section, Eleventh Coast Guard District, telephone (510) 437-3516.
SUPPLEMENTARY INFORMATION: The City of San Francisco requested a
temporary change to the operation of the Third Street Drawbridge, mile
0.0, over China Basin, at San Francisco, CA. The Third Street
Drawbridge navigation span provides a vertical clearance of 7 feet
above Mean High Water in the closed-to-navigation position. The draw
opens on signal if at least one hour notice is given as required by 33
CFR 117.149. Navigation on the waterway is recreational.
The drawspan will be secured in the closed-to-navigation position 7
a.m. through 12:30 p.m. on July 29, 2007 to allow participants in the
San Francisco Marathon to cross the bridge during the event. This
temporary deviation has been coordinated with waterway users. No
objections to the proposed temporary deviation were raised.
Vessels that can transit the bridge, while in the closed-to-
navigation position, may continue to do so at any time.
In the event of an emergency the draw can be opened with 30 minutes
advance notice.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: July 13, 2007.
C.E. Bone,
Rear Admiral, U.S. Coast Guard, Commander, Eleventh Coast Guard
District.
[FR Doc. E7-14203 Filed 7-23-07; 8:45 am]
BILLING CODE 4910-15-P