Transcontinental Gas Pipe Line Corporation; Notice of Compliance Filing, 38073 [E7-13516]

Download as PDF Federal Register / Vol. 72, No. 133 / Thursday, July 12, 2007 / Notices with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing protests is August 1, 2007. Absent a request to be heard in opposition to such blanket approvals by the deadline above, Saracen Energy is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of Saracen Energy, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of Saracen Energy’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E7–13522 Filed 7–11–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY and revisions to the electric power rates for system transportation customers. Transco states that this filing is being made pursuant to the Commission’s Order Denying Rehearing and Accepting Compliance Filings in Docket No. RP01–245–019, et al. issued June 7, 2007. The proposed effective date of the tariff sheets is August 1, 2007. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–13516 Filed 7–11–07; 8:45 am] Federal Energy Regulatory Commission [Docket Nos. RP01–245–023, RP06–569–002 and RP07–338–001] BILLING CODE 6717–01–P Transcontinental Gas Pipe Line Corporation; Notice of Compliance Filing rwilkins on PROD1PC63 with NOTICES July 5, 2007. Take notice that on June 29, 2007, Transcontinental Gas Pipe Line Corporation (Transco) tendered for filing tariff sheets reflecting incremental electric power rate surcharge for Cherokee Expansion Service customers VerDate Aug<31>2005 16:42 Jul 11, 2007 Jkt 211001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 38073 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. QF07–198–000] Warm Springs Biomass Project, LLC; Notice of Filing of Notice of SelfCertification of Qualifying Status of a Small Power Production Facility and Cogeneration Facility July 5, 2007. Take notice that on July 2, 2007, Warm Springs Biomass Project, LLC (Warm Springs Biomass) filed with the Commission a notice of self-certification of a facility as a qualifying small power production facility and cogeneration facility pursuant to 18 CFR 292.207(a) of the Commission’s regulations. Warm Springs Biomass will construct, own, and operate an approximately 20 MW cogeneration facility using biomass as fuel. The two biomass-fueled steam boilers will produce steam that will be directed to the steam turbine generator. Up to 60,000 pounds per hour of steam will be extracted at 75 psi to operate lumber dry kilns. The remaining portion of the steam will run through the entire steam turbine and condensed to produce power. The facility will be located on reservation of the Confederated tribes of Warm Springs Indian Reservation of Oregon in Jefferson County, Oregon. The facility will interconnect with the transmission system of Warm Springs Power and Water Enterprises and sell electric energy to Portland General Electric Company. The facility will purchase supplementary, standby, backup and maintenance power from PacificCorp. A notice of self-certification does not institute a proceeding regarding qualifying facility status; a notice of selfcertification [or self-recertification] provides notice that the entity making filing has determined the facility meets the applicable criteria to be a qualifying facility. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call E:\FR\FM\12JYN1.SGM 12JYN1

Agencies

[Federal Register Volume 72, Number 133 (Thursday, July 12, 2007)]
[Notices]
[Page 38073]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13516]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. RP01-245-023, RP06-569-002 and RP07-338-001]


Transcontinental Gas Pipe Line Corporation; Notice of Compliance 
Filing

July 5, 2007.
    Take notice that on June 29, 2007, Transcontinental Gas Pipe Line 
Corporation (Transco) tendered for filing tariff sheets reflecting 
incremental electric power rate surcharge for Cherokee Expansion 
Service customers and revisions to the electric power rates for system 
transportation customers. Transco states that this filing is being made 
pursuant to the Commission's Order Denying Rehearing and Accepting 
Compliance Filings in Docket No. RP01-245-019, et al. issued June 7, 
2007. The proposed effective date of the tariff sheets is August 1, 
2007.
    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed in accordance with the provisions of Section 154.210 of 
the Commission's regulations (18 CFR 154.210). Anyone filing a protest 
must serve a copy of that document on all the parties to the 
proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-13516 Filed 7-11-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.