Transcontinental Gas Pipe Line Corporation; Notice of Compliance Filing, 38073 [E7-13516]
Download as PDF
Federal Register / Vol. 72, No. 133 / Thursday, July 12, 2007 / Notices
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is August 1,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Saracen Energy is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of
Saracen Energy, compatible with the
public interest, and is reasonably
necessary or appropriate for such
purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Saracen Energy’s issuance
of securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13522 Filed 7–11–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
and revisions to the electric power rates
for system transportation customers.
Transco states that this filing is being
made pursuant to the Commission’s
Order Denying Rehearing and Accepting
Compliance Filings in Docket No.
RP01–245–019, et al. issued June 7,
2007. The proposed effective date of the
tariff sheets is August 1, 2007.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13516 Filed 7–11–07; 8:45 am]
Federal Energy Regulatory
Commission
[Docket Nos. RP01–245–023, RP06–569–002
and RP07–338–001]
BILLING CODE 6717–01–P
Transcontinental Gas Pipe Line
Corporation; Notice of Compliance
Filing
rwilkins on PROD1PC63 with NOTICES
July 5, 2007.
Take notice that on June 29, 2007,
Transcontinental Gas Pipe Line
Corporation (Transco) tendered for
filing tariff sheets reflecting incremental
electric power rate surcharge for
Cherokee Expansion Service customers
VerDate Aug<31>2005
16:42 Jul 11, 2007
Jkt 211001
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
38073
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. QF07–198–000]
Warm Springs Biomass Project, LLC;
Notice of Filing of Notice of SelfCertification of Qualifying Status of a
Small Power Production Facility and
Cogeneration Facility
July 5, 2007.
Take notice that on July 2, 2007,
Warm Springs Biomass Project, LLC
(Warm Springs Biomass) filed with the
Commission a notice of self-certification
of a facility as a qualifying small power
production facility and cogeneration
facility pursuant to 18 CFR 292.207(a) of
the Commission’s regulations.
Warm Springs Biomass will construct,
own, and operate an approximately 20
MW cogeneration facility using biomass
as fuel. The two biomass-fueled steam
boilers will produce steam that will be
directed to the steam turbine generator.
Up to 60,000 pounds per hour of steam
will be extracted at 75 psi to operate
lumber dry kilns. The remaining portion
of the steam will run through the entire
steam turbine and condensed to
produce power. The facility will be
located on reservation of the
Confederated tribes of Warm Springs
Indian Reservation of Oregon in
Jefferson County, Oregon.
The facility will interconnect with the
transmission system of Warm Springs
Power and Water Enterprises and sell
electric energy to Portland General
Electric Company. The facility will
purchase supplementary, standby, backup and maintenance power from
PacificCorp.
A notice of self-certification does not
institute a proceeding regarding
qualifying facility status; a notice of selfcertification [or self-recertification]
provides notice that the entity making
filing has determined the facility meets
the applicable criteria to be a qualifying
facility. Any person seeking to challenge
such qualifying facility status may do so
by filing a motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\12JYN1.SGM
12JYN1
Agencies
[Federal Register Volume 72, Number 133 (Thursday, July 12, 2007)]
[Notices]
[Page 38073]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13516]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. RP01-245-023, RP06-569-002 and RP07-338-001]
Transcontinental Gas Pipe Line Corporation; Notice of Compliance
Filing
July 5, 2007.
Take notice that on June 29, 2007, Transcontinental Gas Pipe Line
Corporation (Transco) tendered for filing tariff sheets reflecting
incremental electric power rate surcharge for Cherokee Expansion
Service customers and revisions to the electric power rates for system
transportation customers. Transco states that this filing is being made
pursuant to the Commission's Order Denying Rehearing and Accepting
Compliance Filings in Docket No. RP01-245-019, et al. issued June 7,
2007. The proposed effective date of the tariff sheets is August 1,
2007.
Any person desiring to protest this filing must file in accordance
with Rule 211 of the Commission's Rules of Practice and Procedure (18
CFR 385.211). Protests to this filing will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Such protests
must be filed in accordance with the provisions of Section 154.210 of
the Commission's regulations (18 CFR 154.210). Anyone filing a protest
must serve a copy of that document on all the parties to the
proceeding.
The Commission encourages electronic submission of protests in lieu
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons
unable to file electronically should submit an original and 14 copies
of the protest to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-13516 Filed 7-11-07; 8:45 am]