Warm Springs Biomass Project, LLC; Notice of Filing of Notice of Self-Certification of Qualifying Status of a Small Power Production Facility and Cogeneration Facility, 38073-38074 [E7-13512]
Download as PDF
Federal Register / Vol. 72, No. 133 / Thursday, July 12, 2007 / Notices
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is August 1,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Saracen Energy is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of
Saracen Energy, compatible with the
public interest, and is reasonably
necessary or appropriate for such
purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Saracen Energy’s issuance
of securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13522 Filed 7–11–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
and revisions to the electric power rates
for system transportation customers.
Transco states that this filing is being
made pursuant to the Commission’s
Order Denying Rehearing and Accepting
Compliance Filings in Docket No.
RP01–245–019, et al. issued June 7,
2007. The proposed effective date of the
tariff sheets is August 1, 2007.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13516 Filed 7–11–07; 8:45 am]
Federal Energy Regulatory
Commission
[Docket Nos. RP01–245–023, RP06–569–002
and RP07–338–001]
BILLING CODE 6717–01–P
Transcontinental Gas Pipe Line
Corporation; Notice of Compliance
Filing
rwilkins on PROD1PC63 with NOTICES
July 5, 2007.
Take notice that on June 29, 2007,
Transcontinental Gas Pipe Line
Corporation (Transco) tendered for
filing tariff sheets reflecting incremental
electric power rate surcharge for
Cherokee Expansion Service customers
VerDate Aug<31>2005
16:42 Jul 11, 2007
Jkt 211001
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
38073
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. QF07–198–000]
Warm Springs Biomass Project, LLC;
Notice of Filing of Notice of SelfCertification of Qualifying Status of a
Small Power Production Facility and
Cogeneration Facility
July 5, 2007.
Take notice that on July 2, 2007,
Warm Springs Biomass Project, LLC
(Warm Springs Biomass) filed with the
Commission a notice of self-certification
of a facility as a qualifying small power
production facility and cogeneration
facility pursuant to 18 CFR 292.207(a) of
the Commission’s regulations.
Warm Springs Biomass will construct,
own, and operate an approximately 20
MW cogeneration facility using biomass
as fuel. The two biomass-fueled steam
boilers will produce steam that will be
directed to the steam turbine generator.
Up to 60,000 pounds per hour of steam
will be extracted at 75 psi to operate
lumber dry kilns. The remaining portion
of the steam will run through the entire
steam turbine and condensed to
produce power. The facility will be
located on reservation of the
Confederated tribes of Warm Springs
Indian Reservation of Oregon in
Jefferson County, Oregon.
The facility will interconnect with the
transmission system of Warm Springs
Power and Water Enterprises and sell
electric energy to Portland General
Electric Company. The facility will
purchase supplementary, standby, backup and maintenance power from
PacificCorp.
A notice of self-certification does not
institute a proceeding regarding
qualifying facility status; a notice of selfcertification [or self-recertification]
provides notice that the entity making
filing has determined the facility meets
the applicable criteria to be a qualifying
facility. Any person seeking to challenge
such qualifying facility status may do so
by filing a motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\12JYN1.SGM
12JYN1
38074
Federal Register / Vol. 72, No. 133 / Thursday, July 12, 2007 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13512 Filed 7–11–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
rwilkins on PROD1PC63 with NOTICES
July 3, 2007.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG07–61–000.
Applicants: Warm Springs Biomass
Project, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Warm Springs
Biomass Project, LLC.
Filed Date: 06/26/2007.
Accession Number: 20070625–5079.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 17, 2007.
Docket Numbers: EG07–62–000.
Applicants: Peetz Table Wind Energy,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Peetz Table Wind
Energy, LLC.
Filed Date: 06/27/2007.
Accession Number: 20070627–5012.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 18, 2007.
Docket Numbers: EG07–63–000.
Applicants: NRG Texas Power LLC.
Description: NRG Texas Power, LLC
submits its Notice of Self-Certification
of Exempt Wholesale Generator Status.
Filed Date: 06/28/2007.
Accession Number: 20070702–0260.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 19, 2007.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER95–1528–017;
ER96–1088–044; ER01–2659–011;
ER02–2199–009; ER03–54–009; ER03–
56–009; ER96–1858–022; ER03–674–
011; ER99–1936–010; ER01–1114–010;
ER97–2758–017; ER05–89–010; ER01–
2306–003.
Applicants: Wisconsin Public Service
Corporation; WPS Power Development,
LLC, and WPS Energy Services, Inc.;
Combined Locks Energy Center, LLC;
WPS Empire State, Inc.; WPS Beaver
Falls Generation, LLC; Mid-American
Power, LLC; Quest Energy, LLC; WPS
Canada Generation, Inc. and WPS New
VerDate Aug<31>2005
16:42 Jul 11, 2007
Jkt 211001
England Generation, Inc.; WPS
Westwood Generation, LLC; Advantage
Energy, Inc.; Upper Peninsula Power
Company; Peoples Energy Services
Corporation
Description: Integrys Energy Group,
Inc submits Notice of Change in Status
as set forth in the Commission’s Order
652.
Filed Date: 06/28/2007.
Accession Number: 20070702–0264.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 19, 2007.
Docket Numbers: ER98–3564–000.
Applicants: FPL Energy Wyman IV
LLC.
Description: Change in Material Facts
of FPL Energy Wyman IV LLC.
Filed Date: 06/29/2007.
Accession Number: 20070629–5022.
Comment Date: 5 p.m. Eastern Time
on Friday, July 20, 2007.
Docket Numbers: ER99–705–004.
Applicants: Golden Spread Electric
Cooperative, Inc.
Description: Notice of Change in
Status of Golden Spread Electric
Cooperative, Inc.
Filed Date: 06/29/2007.
Accession Number: 20070629–5045.
Comment Date: 5 p.m. Eastern Time
on Friday, July 20, 2007.
Docket Numbers: ER01–2569–005;
ER98–4652–005; ER02–1175–004;
ER01–2568–003.
Applicants: Boralex Livemore Falls
Inc.; Boralex Stratton Energy LP;
Boralex Ft. Fairfield LP; Boralex
Ashland LP.
Description: Triennial Compliance
Filing of Boralex Industries Inc.
Filed Date: 06/29/2007.
Accession Number: 20070629–5023.
Comment Date: 5 p.m. Eastern Time
on Friday, July 20, 2007.
Docket Numbers: ER02–999–005;
ER97–2463–005; ER05–320–003; ER97–
2460–008.
Applicants: Fitchburg Gas and
Electric Light Company; Unitil Energy
Systems, Inc.; Unitil Power Corporation.
Description: Change in Status of
Fitchburg Gas and Electric Light
Company, Unitil Power Corp. and Unitil
Energy Systems, Inc.
Filed Date: 06/29/2007.
Accession Number: 20070629–5066.
Comment Date: 5 p.m. Eastern Time
on Friday, July 20, 2007.
Docket Numbers: ER02–1437–003.
Applicants: Triton Power Michigan
LLC.
Description: Notice of non-material
change in status of Triton Power
Michigan LLC.
Filed Date: 06/29/2007.
Accession Number: 20070629–5017.
Comment Date: 5 p.m. Eastern Time
on Friday, July 20, 2007.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Docket Numbers: ER02–1785–011.
Applicants: Thermo Cogeneration
Partnership LP.
Description: Notice of non-material
change in status of Thermo
Cogeneration Partnership, L.P.
Filed Date: 06/29/2007.
Accession Number: 20070629–5028.
Comment Date: 5 p.m. Eastern Time
on Friday, July 20, 2007.
Docket Numbers: ER04–698–004.
Applicants: Tor Power, LLC.
Description: Tor Power, LLC submits
its Updated Market Power Analysis
Report.
Filed Date: 06/28/2007.
Accession Number: 20070628–5007.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 19, 2007.
Docket Numbers: ER05–1065–010.
Applicants: Entergy Services, Inc.
Description: Entergy Operating
Companies submits its compliance
filing.
Filed Date: 06/25/2007.
Accession Number: 20070627–0102.
Comment Date: 5 p.m. Eastern Time
on Monday, July 16, 2007.
Docket Numbers: ER07–127–003.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
Second Revised Sheet 163 et al to FERC
Electric Tariff, Third Replacement
Volume 1 pursuant to Section 205 of the
Federal Power Act etc.
Filed Date: 06/27/2007.
Accession Number: 20070629–0069.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 18, 2007.
Docket Numbers: ER07–282–001.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits its executed service
agreement for Firm Point-to-Point
Transmission Service with Kansas
Power Pool, & revised agreement for
firm Point-to-Point Transmission
Service w/Kansas Municipal Energy
Agency.
Filed Date: 06/27/2007.
Accession Number: 20070629–0067.
Comment Date: 5 p.m. Eastern Time
on Wednesday, July 18, 2007.
Docket Numbers: ER07–285–001.
Applicants: New York Independent
System Operator, Inc.
Description: NYISO submits an
informational report on efforts to
finalize permanent market rules for
intermittent suppliers.
Filed Date: 06/28/2007.
Accession Number: 20070628–5011.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 19, 2007.
Docket Numbers: ER07–361–003.
E:\FR\FM\12JYN1.SGM
12JYN1
Agencies
[Federal Register Volume 72, Number 133 (Thursday, July 12, 2007)]
[Notices]
[Pages 38073-38074]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13512]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. QF07-198-000]
Warm Springs Biomass Project, LLC; Notice of Filing of Notice of
Self-Certification of Qualifying Status of a Small Power Production
Facility and Cogeneration Facility
July 5, 2007.
Take notice that on July 2, 2007, Warm Springs Biomass Project, LLC
(Warm Springs Biomass) filed with the Commission a notice of self-
certification of a facility as a qualifying small power production
facility and cogeneration facility pursuant to 18 CFR 292.207(a) of the
Commission's regulations.
Warm Springs Biomass will construct, own, and operate an
approximately 20 MW cogeneration facility using biomass as fuel. The
two biomass-fueled steam boilers will produce steam that will be
directed to the steam turbine generator. Up to 60,000 pounds per hour
of steam will be extracted at 75 psi to operate lumber dry kilns. The
remaining portion of the steam will run through the entire steam
turbine and condensed to produce power. The facility will be located on
reservation of the Confederated tribes of Warm Springs Indian
Reservation of Oregon in Jefferson County, Oregon.
The facility will interconnect with the transmission system of Warm
Springs Power and Water Enterprises and sell electric energy to
Portland General Electric Company. The facility will purchase
supplementary, standby, back-up and maintenance power from PacificCorp.
A notice of self-certification does not institute a proceeding
regarding qualifying facility status; a notice of self-certification
[or self-recertification] provides notice that the entity making filing
has determined the facility meets the applicable criteria to be a
qualifying facility. Any person seeking to challenge such qualifying
facility status may do so by filing a motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
[[Page 38074]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-13512 Filed 7-11-07; 8:45 am]
BILLING CODE 6717-01-P