CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing, 37745-37746 [E7-13465]
Download as PDF
Federal Register / Vol. 72, No. 132 / Wednesday, July 11, 2007 / Notices
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13452 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–404–000]
Centerpoint Energy Gas Transmission
Company; Notice of Request Under
Blanket Authorization
jlentini on PROD1PC65 with NOTICES
July 3, 2007.
Take notice that on June 20, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT), 1111 Louisiana
Street, Houston, Texas 77002–5231,
filed in Docket No. CP07–404–000, a
prior notice request pursuant to sections
157.205 and 157.208 of the Federal
Energy Regulatory Commission’s
regulations under the Natural Gas Act
for authorization to replace an existing
delivery lateral and increase the line’s
maximum allowable operating pressure
(MAOP), located in Ouachita and Union
Counties, Arkansas, all as more fully set
forth in the application, which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Specifically, CEGT proposes to
replace approximately 24.9 miles of
Line E, a 12-inch diameter
mechanically-coupled pipeline, with
approximately 24.9 miles of 12-inch
steel welded pipe, install a 10-inch
interconnect between Line E and Line
SM–23, and install auxiliary facilities
including pig launcher and receiver
facilities, a 6-inch check meter station
and 4-inch regulator, and all other
appurtenant facilities necessary. CEGT
also requests authorization to increase
the MAOP of the proposed replacement
segment of Line E from 415 psig to 800
psig. CEGT states that the MAOP
VerDate Aug<31>2005
17:56 Jul 10, 2007
Jkt 211001
increase will enable Line E to operate
up to Line SM–23’s current MAOP of
800 psig. CEGT estimates the cost of
construction to be $17,717,876.
Any questions regarding the
application should be directed to
Lawrence O. Thomas, Director-Rate &
Regulatory, CenterPoint Energy Gas
Transmission Company, P. O. Box
21734, Shreveport, Louisiana 71151, or
call at (318) 429–2804.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to Section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13458 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
37745
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13464 Filed 7–10–07; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. RP96–200–177]
DEPARTMENT OF ENERGY
CenterPoint Energy Gas Transmission
Company; Notice of Negotiated Rate
Filing
Federal Energy Regulatory
Commission
July 3, 2007.
CenterPoint Energy Gas Transmission
Company; Notice of Negotiated Rate
Filing
Take notice that on June 28, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT) tendered for filing and
approval an amendment to a negotiated
rate agreement between CEGT and BP
Energy Company. The amended
agreement will be effective July 1, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
[Docket No. RP96–200–178]
July 3, 2007.
Take notice that on June 28, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT) tendered for filing and
approval an amendment to a negotiated
rate agreement between CEGT and
Enbridge Marketing (U.S.), LP. The
amended agreement will be effective
July 1, 2007.
E:\FR\FM\11JYN1.SGM
11JYN1
37746
Federal Register / Vol. 72, No. 132 / Wednesday, July 11, 2007 / Notices
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13465 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jlentini on PROD1PC65 with NOTICES
[Docket No. RP07–499–000]
Central Kentucky Transmission
Company; Notice of Proposed
Changes in FERC Gas Tariff
July 3, 2007.
Take notice that on June 29, 2007,
Central Kentucky Transmission
Company (Central Kentucky) tendered
VerDate Aug<31>2005
17:56 Jul 10, 2007
Jkt 211001
for filing as part of its FERC Gas Tariff,
Original Volume No. 1, with a proposed
effective date of August 1, 2007:
First Revised Sheet No. 385.
First Revised Sheet No. 386.
First Revised Sheet No. 387.
First Revised Sheet No. 388.
First Revised Sheet No. 389.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13462 Filed 7–10–07; 8:45 am]
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. RP07–509–000]
Central Kentucky states that it is
proposing to revise the pro forma Form
of Assignment Agreement to be used by
replacement shippers when entering
into contracts with Central Kentucky
with respect to capacity awarded.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Columbia Gas Transmission
Corporation; Notice of Proposed
Changes in FERC Gas Tariff
July 3, 2007.
Take notice that on June 29, 2007,
Columbia Gas Transmission Corporation
(Columbia) tendered for filing as part of
its FERC Gas Tariff, Second Revised
Volume No. 1, the following tariff
sheets, with a proposed effective date of
August 1, 2007:
Third Revised Sheet No. 580
Sixth Revised Sheet No. 581
Second Revised Sheet No. 582
Columbia states that it is proposing to
revise the pro forma Form of
Assignment Agreement to be used by
replacement shippers when entering
into contracts with Columbia with
respect to capacity awarded.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 72, Number 132 (Wednesday, July 11, 2007)]
[Notices]
[Pages 37745-37746]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13465]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP96-200-178]
CenterPoint Energy Gas Transmission Company; Notice of Negotiated
Rate Filing
July 3, 2007.
Take notice that on June 28, 2007, CenterPoint Energy Gas
Transmission Company (CEGT) tendered for filing and approval an
amendment to a negotiated rate agreement between CEGT and Enbridge
Marketing (U.S.), LP. The amended agreement will be effective July 1,
2007.
[[Page 37746]]
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-13465 Filed 7-10-07; 8:45 am]
BILLING CODE 6717-01-P