CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing, 37745-37746 [E7-13465]

Download as PDF Federal Register / Vol. 72, No. 132 / Wednesday, July 11, 2007 / Notices There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–13452 Filed 7–10–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–404–000] Centerpoint Energy Gas Transmission Company; Notice of Request Under Blanket Authorization jlentini on PROD1PC65 with NOTICES July 3, 2007. Take notice that on June 20, 2007, CenterPoint Energy Gas Transmission Company (CEGT), 1111 Louisiana Street, Houston, Texas 77002–5231, filed in Docket No. CP07–404–000, a prior notice request pursuant to sections 157.205 and 157.208 of the Federal Energy Regulatory Commission’s regulations under the Natural Gas Act for authorization to replace an existing delivery lateral and increase the line’s maximum allowable operating pressure (MAOP), located in Ouachita and Union Counties, Arkansas, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Specifically, CEGT proposes to replace approximately 24.9 miles of Line E, a 12-inch diameter mechanically-coupled pipeline, with approximately 24.9 miles of 12-inch steel welded pipe, install a 10-inch interconnect between Line E and Line SM–23, and install auxiliary facilities including pig launcher and receiver facilities, a 6-inch check meter station and 4-inch regulator, and all other appurtenant facilities necessary. CEGT also requests authorization to increase the MAOP of the proposed replacement segment of Line E from 415 psig to 800 psig. CEGT states that the MAOP VerDate Aug<31>2005 17:56 Jul 10, 2007 Jkt 211001 increase will enable Line E to operate up to Line SM–23’s current MAOP of 800 psig. CEGT estimates the cost of construction to be $17,717,876. Any questions regarding the application should be directed to Lawrence O. Thomas, Director-Rate & Regulatory, CenterPoint Energy Gas Transmission Company, P. O. Box 21734, Shreveport, Louisiana 71151, or call at (318) 429–2804. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E7–13458 Filed 7–10–07; 8:45 am] BILLING CODE 6717–01–P 37745 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–13464 Filed 7–10–07; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Docket No. RP96–200–177] DEPARTMENT OF ENERGY CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing Federal Energy Regulatory Commission July 3, 2007. CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing Take notice that on June 28, 2007, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval an amendment to a negotiated rate agreement between CEGT and BP Energy Company. The amended agreement will be effective July 1, 2007. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 [Docket No. RP96–200–178] July 3, 2007. Take notice that on June 28, 2007, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval an amendment to a negotiated rate agreement between CEGT and Enbridge Marketing (U.S.), LP. The amended agreement will be effective July 1, 2007. E:\FR\FM\11JYN1.SGM 11JYN1 37746 Federal Register / Vol. 72, No. 132 / Wednesday, July 11, 2007 / Notices Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–13465 Filed 7–10–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jlentini on PROD1PC65 with NOTICES [Docket No. RP07–499–000] Central Kentucky Transmission Company; Notice of Proposed Changes in FERC Gas Tariff July 3, 2007. Take notice that on June 29, 2007, Central Kentucky Transmission Company (Central Kentucky) tendered VerDate Aug<31>2005 17:56 Jul 10, 2007 Jkt 211001 for filing as part of its FERC Gas Tariff, Original Volume No. 1, with a proposed effective date of August 1, 2007: First Revised Sheet No. 385. First Revised Sheet No. 386. First Revised Sheet No. 387. First Revised Sheet No. 388. First Revised Sheet No. 389. Kimberly D. Bose, Secretary. [FR Doc. E7–13462 Filed 7–10–07; 8:45 am] PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. RP07–509–000] Central Kentucky states that it is proposing to revise the pro forma Form of Assignment Agreement to be used by replacement shippers when entering into contracts with Central Kentucky with respect to capacity awarded. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Columbia Gas Transmission Corporation; Notice of Proposed Changes in FERC Gas Tariff July 3, 2007. Take notice that on June 29, 2007, Columbia Gas Transmission Corporation (Columbia) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following tariff sheets, with a proposed effective date of August 1, 2007: Third Revised Sheet No. 580 Sixth Revised Sheet No. 581 Second Revised Sheet No. 582 Columbia states that it is proposing to revise the pro forma Form of Assignment Agreement to be used by replacement shippers when entering into contracts with Columbia with respect to capacity awarded. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to E:\FR\FM\11JYN1.SGM 11JYN1

Agencies

[Federal Register Volume 72, Number 132 (Wednesday, July 11, 2007)]
[Notices]
[Pages 37745-37746]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13465]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP96-200-178]


CenterPoint Energy Gas Transmission Company; Notice of Negotiated 
Rate Filing

July 3, 2007.
    Take notice that on June 28, 2007, CenterPoint Energy Gas 
Transmission Company (CEGT) tendered for filing and approval an 
amendment to a negotiated rate agreement between CEGT and Enbridge 
Marketing (U.S.), LP. The amended agreement will be effective July 1, 
2007.

[[Page 37746]]

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-13465 Filed 7-10-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.