Download as PDF Federal Register / Vol. 72, No. 132 / Wednesday, July 11, 2007 / Notices There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–13452 Filed 7–10–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–404–000] Centerpoint Energy Gas Transmission Company; Notice of Request Under Blanket Authorization jlentini on PROD1PC65 with NOTICES July 3, 2007. Take notice that on June 20, 2007, CenterPoint Energy Gas Transmission Company (CEGT), 1111 Louisiana Street, Houston, Texas 77002–5231, filed in Docket No. CP07–404–000, a prior notice request pursuant to sections 157.205 and 157.208 of the Federal Energy Regulatory Commission’s regulations under the Natural Gas Act for authorization to replace an existing delivery lateral and increase the line’s maximum allowable operating pressure (MAOP), located in Ouachita and Union Counties, Arkansas, all as more fully set forth in the application, which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Specifically, CEGT proposes to replace approximately 24.9 miles of Line E, a 12-inch diameter mechanically-coupled pipeline, with approximately 24.9 miles of 12-inch steel welded pipe, install a 10-inch interconnect between Line E and Line SM–23, and install auxiliary facilities including pig launcher and receiver facilities, a 6-inch check meter station and 4-inch regulator, and all other appurtenant facilities necessary. CEGT also requests authorization to increase the MAOP of the proposed replacement segment of Line E from 415 psig to 800 psig. CEGT states that the MAOP VerDate Aug<31>2005 17:56 Jul 10, 2007 Jkt 211001 increase will enable Line E to operate up to Line SM–23’s current MAOP of 800 psig. CEGT estimates the cost of construction to be $17,717,876. Any questions regarding the application should be directed to Lawrence O. Thomas, Director-Rate & Regulatory, CenterPoint Energy Gas Transmission Company, P. O. Box 21734, Shreveport, Louisiana 71151, or call at (318) 429–2804. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E7–13458 Filed 7–10–07; 8:45 am] BILLING CODE 6717–01–P 37745 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–13464 Filed 7–10–07; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Docket No. RP96–200–177] DEPARTMENT OF ENERGY CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing Federal Energy Regulatory Commission July 3, 2007. CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing Take notice that on June 28, 2007, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval an amendment to a negotiated rate agreement between CEGT and BP Energy Company. The amended agreement will be effective July 1, 2007. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 [Docket No. RP96–200–178] July 3, 2007. Take notice that on June 28, 2007, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval an amendment to a negotiated rate agreement between CEGT and Enbridge Marketing (U.S.), LP. The amended agreement will be effective July 1, 2007. E:\FR\FM\11JYN1.SGM 11JYN1

Agencies

[Federal Register Volume 72, Number 132 (Wednesday, July 11, 2007)]
[Notices]
[Page 37745]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13458]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP07-404-000]


Centerpoint Energy Gas Transmission Company; Notice of Request 
Under Blanket Authorization

July 3, 2007.
    Take notice that on June 20, 2007, CenterPoint Energy Gas 
Transmission Company (CEGT), 1111 Louisiana Street, Houston, Texas 
77002-5231, filed in Docket No. CP07-404-000, a prior notice request 
pursuant to sections 157.205 and 157.208 of the Federal Energy 
Regulatory Commission's regulations under the Natural Gas Act for 
authorization to replace an existing delivery lateral and increase the 
line's maximum allowable operating pressure (MAOP), located in Ouachita 
and Union Counties, Arkansas, all as more fully set forth in the 
application, which is on file with the Commission and open to public 
inspection. The filing may also be viewed on the Web at https://
www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Specifically, CEGT proposes to replace approximately 24.9 miles of 
Line E, a 12-inch diameter mechanically-coupled pipeline, with 
approximately 24.9 miles of 12-inch steel welded pipe, install a 10-
inch interconnect between Line E and Line SM-23, and install auxiliary 
facilities including pig launcher and receiver facilities, a 6-inch 
check meter station and 4-inch regulator, and all other appurtenant 
facilities necessary. CEGT also requests authorization to increase the 
MAOP of the proposed replacement segment of Line E from 415 psig to 800 
psig. CEGT states that the MAOP increase will enable Line E to operate 
up to Line SM-23's current MAOP of 800 psig. CEGT estimates the cost of 
construction to be $17,717,876.
    Any questions regarding the application should be directed to 
Lawrence O. Thomas, Director-Rate & Regulatory, CenterPoint Energy Gas 
Transmission Company, P. O. Box 21734, Shreveport, Louisiana 71151, or 
call at (318) 429-2804.
    Any person or the Commission's Staff may, within 60 days after the 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and, pursuant to section 157.205 of 
the Commission's Regulations under the Natural Gas Act (NGA) (18 CFR 
157.205) a protest to the request. If no protest is filed within the 
time allowed therefore, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request shall be treated as 
an application for authorization pursuant to Section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov) under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-13458 Filed 7-10-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.