Federal Register / Vol. 72, No. 132 / Wednesday, July 11, 2007 / Notices
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13431 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER07–907–000]
Bruce Power Inc.; Notice of Issuance
of Order
jlentini on PROD1PC65 with NOTICES
July 3, 2007.
Bruce Power Inc. (Bruce Power) filed
an application for market-based rate
authority, with an accompanying rate
schedule. The proposed market-based
rate schedule provides for the sale of
energy and capacity at market-based
rates. Bruce Power also requested
waivers of various Commission
regulations. In particular, Bruce Power
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
assumptions of liability by Bruce Power.
On June 29, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
VerDate Aug<31>2005
17:56 Jul 10, 2007
Jkt 211001
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by Bruce Power should file
a protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is July 30,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Bruce Power is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of Bruce
Power, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Bruce Power’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13466 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP07–495–000]
CenterPoint Energy—Mississippi River
Transmission Corporation; Notice of
Proposed Changes in FERC Tariff
July 3, 2007.
Take notice that on June 27, 2007,
CenterPoint Energy Mississippi River
Transmission Corporation (MRT),
tendered for filing as part of its FERC
Gas Tariff, Third Revised Volume No. 1,
the following tariff sheets to be effective
July 1, 2007:
Sixtieth Revised Sheet No. 5.
Sixtieth Revised Sheet No. 6.
Fifty-Seventh Revised Sheet No. 7.
MRT states that these tariff sheets
reflect the termination of a
supplemental adjustment percentage
that went into effect on May 1, 2006 as
a result of an Uncontested Settlement
Agreement related to MRT’s Annual
Fuel and LUFG adjustment filing in
Docket No. RP05–691–000.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
E:\FR\FM\11JYN1.SGM
11JYN1
Federal Register / Vol. 72, No. 132 / Wednesday, July 11, 2007 / Notices
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13452 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–404–000]
Centerpoint Energy Gas Transmission
Company; Notice of Request Under
Blanket Authorization
jlentini on PROD1PC65 with NOTICES
July 3, 2007.
Take notice that on June 20, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT), 1111 Louisiana
Street, Houston, Texas 77002–5231,
filed in Docket No. CP07–404–000, a
prior notice request pursuant to sections
157.205 and 157.208 of the Federal
Energy Regulatory Commission’s
regulations under the Natural Gas Act
for authorization to replace an existing
delivery lateral and increase the line’s
maximum allowable operating pressure
(MAOP), located in Ouachita and Union
Counties, Arkansas, all as more fully set
forth in the application, which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Specifically, CEGT proposes to
replace approximately 24.9 miles of
Line E, a 12-inch diameter
mechanically-coupled pipeline, with
approximately 24.9 miles of 12-inch
steel welded pipe, install a 10-inch
interconnect between Line E and Line
SM–23, and install auxiliary facilities
including pig launcher and receiver
facilities, a 6-inch check meter station
and 4-inch regulator, and all other
appurtenant facilities necessary. CEGT
also requests authorization to increase
the MAOP of the proposed replacement
segment of Line E from 415 psig to 800
psig. CEGT states that the MAOP
VerDate Aug<31>2005
17:56 Jul 10, 2007
Jkt 211001
increase will enable Line E to operate
up to Line SM–23’s current MAOP of
800 psig. CEGT estimates the cost of
construction to be $17,717,876.
Any questions regarding the
application should be directed to
Lawrence O. Thomas, Director-Rate &
Regulatory, CenterPoint Energy Gas
Transmission Company, P. O. Box
21734, Shreveport, Louisiana 71151, or
call at (318) 429–2804.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to Section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13458 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
37745
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13464 Filed 7–10–07; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. RP96–200–177]
DEPARTMENT OF ENERGY
CenterPoint Energy Gas Transmission
Company; Notice of Negotiated Rate
Filing
Federal Energy Regulatory
Commission
July 3, 2007.
CenterPoint Energy Gas Transmission
Company; Notice of Negotiated Rate
Filing
Take notice that on June 28, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT) tendered for filing and
approval an amendment to a negotiated
rate agreement between CEGT and BP
Energy Company. The amended
agreement will be effective July 1, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
[Docket No. RP96–200–178]
July 3, 2007.
Take notice that on June 28, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT) tendered for filing and
approval an amendment to a negotiated
rate agreement between CEGT and
Enbridge Marketing (U.S.), LP. The
amended agreement will be effective
July 1, 2007.
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 72, Number 132 (Wednesday, July 11, 2007)]
[Notices]
[Pages 37744-37745]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13452]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP07-495-000]
CenterPoint Energy--Mississippi River Transmission Corporation;
Notice of Proposed Changes in FERC Tariff
July 3, 2007.
Take notice that on June 27, 2007, CenterPoint Energy Mississippi
River Transmission Corporation (MRT), tendered for filing as part of
its FERC Gas Tariff, Third Revised Volume No. 1, the following tariff
sheets to be effective July 1, 2007:
Sixtieth Revised Sheet No. 5.
Sixtieth Revised Sheet No. 6.
Fifty-Seventh Revised Sheet No. 7.
MRT states that these tariff sheets reflect the termination of a
supplemental adjustment percentage that went into effect on May 1, 2006
as a result of an Uncontested Settlement Agreement related to MRT's
Annual Fuel and LUFG adjustment filing in Docket No. RP05-691-000.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC.
[[Page 37745]]
There is an ``eSubscription'' link on the Web site that enables
subscribers to receive e-mail notification when a document is added to
a subscribed docket(s). For assistance with any FERC Online service,
please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll
free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-13452 Filed 7-10-07; 8:45 am]
BILLING CODE 6717-01-P