Sea Robin Pipeline Company, LLC; Notice of Proposed Changes in FERC Gas Tariff, 37754-37755 [E7-13448]
Download as PDF
37754
Federal Register / Vol. 72, No. 132 / Wednesday, July 11, 2007 / Notices
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13449 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL00–95–196; Docket No.
EL00–98–180]
jlentini on PROD1PC65 with NOTICES
San Diego Gas & Electric Company v.
Sellers of Energy and Other Ancillary;
Services Into Markets Operated by the
California Power Independent System
Operator Corporation and the
California Power Exchange; Notice of
Compliance Filing
approving the APX Settlement, San
Diego Gas & Electric v. Sellers of
Ancillary Serv., 118 FERC ¶ 61,168
(2007). The compliance filing was
contemplated by the APX/California
Parties Term Sheet that was filed with
the Commission as Appendix A to the
APX/California Parties February 7, 2007
reply Comments on the APX Settlement.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 12, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13439 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
July 2, 2007.
Take notice that on April 24, 2007,
APX Inc and the APX Sponsoring
Parties submitted a compliance filing as
directed by the Commission in an order
VerDate Aug<31>2005
17:56 Jul 10, 2007
Jkt 211001
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP07–513–000]
Sea Robin Pipeline Company, LLC;
Notice of Proposed Changes in FERC
Gas Tariff
July 3, 2007.
Take notice that on June 29, 2007, Sea
Robin Pipeline Company, LLC, (Sea
Robin) tendered for filing as part of its
FERC Gas Tariff, Second Revised
Volume No. 1, the tariff sheets listed in
Appendix A to the filing, to become
effective August 1, 2007.
Sea Robin states that the primary
reason for the filing of the revised tariff
sheets is to adjust Sea Robin’s rates for
gathering and transmission
transportation services for a general rate
increase. Projected transportation
revenues, excluding surcharges, are
$22.0 million based on the 12-month
period ending February 28, 2007, as
adjusted, resulting in a $13.5 million
increase when compared with actual
revenues.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
E:\FR\FM\11JYN1.SGM
11JYN1
Federal Register / Vol. 72, No. 132 / Wednesday, July 11, 2007 / Notices
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13448 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E7–13459 Filed 7–10–07; 8:45 am]
BILLING CODE 6717–01–P
[Docket No. RP07–502–000]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
July 3, 2007.
jlentini on PROD1PC65 with NOTICES
Texas Eastern Transmission, LP;
Notice of Proposed Changes in FERC
Gas Tariff
[Docket No. CP07–405–000]
Take notice that on June 29, 2007,
Texas Eastern Transmission, LP (Texas
Eastern) tendered for filing as part of its
FERC Gas Tariff, Seventh Revised
Volume No. 1 and First Revised Volume
No. 2, revised tariff sheets, as listed on
Appendix B to the filing, to become
effective August 1, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Texas Gas Transmission, LLC; Notice
of Filing
VerDate Aug<31>2005
17:56 Jul 10, 2007
Jkt 211001
July 3, 2007.
Take notice that on June 25, 2007,
Texas Gas Transmission, LLC (Texas
Gas), 3800 Frederica Street, Owensboro,
Kentucky 42301, filed an abbreviated
application for a certificate of public
convenience and necessity, pursuant to
Section 7 of the Natural Gas Act (NGA)
and Part 157 of the Commission’s Rules
and Regulations, authorizing Texas Gas
to expand its facilities at Midland Gas
Storage Field in Muhlenberg County,
Kentucky. The project will provide up
to 8.25 Bcf of new firm storage capacity,
as well as provide up to 92.2 MMcf/d of
increased firm deliverability. The
application is on file with the
Commission and open for public
inspection. This filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Texas Gas is seeking a determination
that it qualifies for market-based rates.
In the event that the Commission does
not allow market-based rates for the new
storage capacity under either the
traditional market power analysis or
section 4(f) of the NGA, Texas Gas seeks
authorization to construct only the
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
37755
facilities necessary to create
approximately 2 Bcf of new storage
capacity at the rates reflected in the
Precedent Agreement between Texas
Gas and its storage customer.
For the 2 Bcf expansion, Texas Gas
proposes the following activities:
—To install a discharge cooler and
additional gas dehydration facilities,
and to uprate two electric drive
compressors (from 1,250 to 1,500 HP
each) at the Midland 3 Compressor
Station, and
—To restage one existing centrifugal
compressor at the Slaughters
Compressor Station.
For the full 8.25 Bcf expansion, Texas
Gas proposes the following additional
activities:
—At the Midland 3 Compressor Station,
to install one 5,488 HP Solar Centaur
50gas turbine13 and auxiliary
facilities, to retire in place two
existing 2,000 HP Delaval
reciprocating compressor units,
including certain auxiliary facilities,
and to construct a 2,900-foot
extension of its E–9 16-inch storage
lateral.
—To construct approximately 11 miles
of 30-inch mainline pipeline loop
from the discharge side of the
Midland 3 Compressor Station to a
point near Hanson, Kentucky.
—To drill seven horizontal injection/
withdrawal wells and install related
piping and measurement at Midland.
Texas Gas proposes the service dates
of November 1, 2008 and November 1,
2009 for the 2 Bcf expansion and 8.25
Bcf expansion, respectively.
Any questions regarding the
application are to be directed to Kathy
D. Fort, Manager of Certificates and
Tariffs, Texas Gas Transmission, LLC,
3800 Frederica Street, Owensboro,
Kentucky 42301.
Any person wishing to obtain legal
status by becoming a party to the
proceedings for this project should, on
or before the below listed comment
date, file with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, a
motion to intervene in accordance with
the requirements of the Commission’s
Rules of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
E:\FR\FM\11JYN1.SGM
11JYN1
Agencies
[Federal Register Volume 72, Number 132 (Wednesday, July 11, 2007)]
[Notices]
[Pages 37754-37755]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13448]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP07-513-000]
Sea Robin Pipeline Company, LLC; Notice of Proposed Changes in
FERC Gas Tariff
July 3, 2007.
Take notice that on June 29, 2007, Sea Robin Pipeline Company, LLC,
(Sea Robin) tendered for filing as part of its FERC Gas Tariff, Second
Revised Volume No. 1, the tariff sheets listed in Appendix A to the
filing, to become effective August 1, 2007.
Sea Robin states that the primary reason for the filing of the
revised tariff sheets is to adjust Sea Robin's rates for gathering and
transmission transportation services for a general rate increase.
Projected transportation revenues, excluding surcharges, are $22.0
million based on the 12-month period ending February 28, 2007, as
adjusted, resulting in a $13.5 million increase when compared with
actual revenues.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC.
[[Page 37755]]
There is an ``eSubscription'' link on the Web site that enables
subscribers to receive e-mail notification when a document is added to
a subscribed docket(s). For assistance with any FERC Online service,
please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll
free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-13448 Filed 7-10-07; 8:45 am]
BILLING CODE 6717-01-P