Environmental Impact Statements; Notice of Availability, 37005-37006 [E7-13095]

Download as PDF Federal Register / Vol. 72, No. 129 / Friday, July 6, 2007 / Notices sign an agreement to protect the information from unauthorized release and to handle it in accordance with the FIFRA Information Security Manual. In addition, Management Support Technology, Inc. and its subcontractor, System Integration Group, Inc., are required to submit for EPA approval a security plan under which any CBI will be secured and protected against unauthorized release or compromise. No information will be provided to Management Support Technology, Inc. and its subcontractor, System Integration Group, Inc., until the requirements in this document have been fully satisfied. Records of information provided to Management Support Technology, Inc. and its subcontractor, System Integration Group, Inc., will be maintained by EPA Project Officers for this contract. All information supplied to Management Support Technology, Inc. and its subcontractor, System Integration Group, Inc., by EPA for use in connection with this contract will be returned to EPA when Management Support Technology, Inc. and its subcontractor, System Integration Group, Inc., have completed their work. List of Subjects Environmental protection, Business and industry, Government contracts, Government property, Security measures. Dated: June 25, 2007. Robert A. Forrest, Acting Director, Office of Pesticide Programs. [FR Doc. E7–13005 Filed 7–5–07; 8:45 am] BILLING CODE 6560–50–S ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6688–7] mstockstill on PROD1PC66 with NOTICES Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in the Federal Register dated April 6, 2007 (72 FR 17156). VerDate Aug<31>2005 17:16 Jul 05, 2007 Jkt 211001 Draft EISs EIS No. 20070089, ERP No. D–MMS– A09833–00, PROGRAMMATIC— Alternative Energy Development and Production and Alternate Use of Facilities on the Outer Continental Shelf, Implementation, Atlantic, Gulf of Mexico, Pacific and Alaska. Summary: EPA does not object to the proposed action. Rating LO. EIS No. 20070131, ERP No. D–IBR– G39048–NM, Navajo-Gallup Water Supply Project, To Provide a LongTerm (Year 2040) Water Supply, Treatment and Transmission of Municipal and Industrial (M&I) Water to Navajo National and Jicarilla Apache Nation, City of Gallup, New Mexico. Summary: EPA does not object to the proposed action. Rating LO. Final EISs EIS No. 20070157, ERP No. F–MMS– A02244–00, Outer Continental Shelf Oil & Gas Leasing Program: 2007– 2012, Exploration and Development Offshore Marine Environment and Coastal Counties of AL, AK, DE, FL, LA, MD, MS, NJ, NC, TX, and VA. Summary: EPA does not object to the proposed action. EIS No. 20070195, ERP No. F–AFS– L65514–AK, Traitors Cove Timber Sale Project, Timber Harvest and Road Construction, Implementation, Revillagigedo Island, Ketchikan-Misty Fiords Ranger District, Tongass National Forest, AK. Summary: EPA continues to have environmental concerns about potential cumulative water quality impacts. EIS No. 20070201, ERP No. F–FHW– H40188–00, US 59—Amelia Earhart Memorial Bridge over the Missouri River, Construction from Atchison, Kansas to U.S. 59/State Route 45 Intersection, US Coast Guard Section 9 Permit and U.S. Army COE Section 10 and 404 Permits, Atchison, KS and Buchanan County, MO. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20070202, ERP No. F–AFS– L65497–ID, South Fork Salmon River Subbasin Noxious and Invasive Weed Management Program, Implementation, Krassel and McCall Ranger Districts, Payette National Forest and Cascade Ranger District, Valley and Idaho Counties, ID. Summary: EPA’s previous concerns have been resolved; therefore, EPA does not object to the proposed action. EIS No. 20070232, ERP No. F–FHW– H50002–00, Bellevue Bridge Study, PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 37005 To Improve Connectivity between the Omaha Metropolitan Area and across the Missouri River from U.S. 75 to I– 29, Coast Guard Permit, NPDES Permit, U.S. Army COE Section 10 and 404 Permits, Mills County, IA and Sarp County, NE. Summary: EPA’s previous issues have been resolved; therefore, EPA does not object to the action as proposed. Dated: July 2, 2007. Robert Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–13093 Filed 7–5–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6688–6] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 06/25/2007 Through 06/29/2007 Pursuant to 40 CFR 1506.9. EIS No. 20070265, Final EIS, AFS, CA, Pilgrim Vegetation Management Project, Proposed Restoration of Forest Health and Ecosystem, Implementation, Shasta-Trinity National Forest, Siskiyou County, CA, Wait Period Ends: 08/06/2007. Contact: Dennis Poehlmann 530–926– 9656. This document is available on the Internet at: https://www.fs.fed.us/ r5/shastatrinity/projects/smmuprojects.shtml. EIS No. 20070266, Draft EIS, SFW, 00, Lake Umbagog National Wildlife Refuge, Comprehensive Conservation Plan, 15 Year Guidance for Management of Refuge Operations, Habitat and Visitor Services, Implementation, Coos County, NH and Oxford County, ME. Comment Period Ends: 08/20/2007. Contact: Nancy McGarigal 413–253–8562. EIS No. 20070267, Second Draft Supplement, COE, FL, Lake Okeechobee Regulation Schedule Study, New Updated Information, Evaluation of Three New Alternatives on Operational Changes to the Current Water Control Plan, Lake Okeechobee and the Everglades Agricultural Area, Lake Okeechobee, Glades, Okeechobee Hendry, Palm Beach and Martin Counties, FL. Comment Period Ends: 08/20/2007. Contact: Yvonne L. Haberer 904–232–1701. E:\FR\FM\06JYN1.SGM 06JYN1 mstockstill on PROD1PC66 with NOTICES 37006 Federal Register / Vol. 72, No. 129 / Friday, July 6, 2007 / Notices EIS No. 20070268, Final EIS, GSA, VT, U.S. Commercial Port of Entry, Replacing existing Station at Route I– 91, Design and Construction, Derby Line, Vermont. Wait Period Ends: 08/06/2007. Contact: Glenn C. Rotondo 617–565–5694. EIS No. 20070269, Draft EIS, IBR, CA, Lower Yuba River Accord, Proposal to Resolve Instream Flow Issues Associated with Operation, Yuba River, Yuba County, CA. Comment Period Ends: 08/24/2007. Contact: Tamara LaFramboise 916–978–5269. EIS No. 20070270, Draft EIS, NRC, MD, License Renewal of the National Bureau of Standards Reactor (NBSR), Renew the Operating License for an Addditional 20 Years, National Institute of Standards and Technology (NIST), NUREG–1873, Montgomery County, MD. Comment Period Ends: 09/05/2007. Contact: Dennis Beissel 301–415–2145. EIS No. 20070271, Final EIS, AFS, WI, Fishbone Project Area, Vegetation and Road Management, Implementation, Washburn Ranger District, Chequamegon-Nicolet National Forest, Bayfield County, WI. Wait Period Ends: 08/06/2007. Contact: Jennifer Maziasz 715–373–2267 Ext 235. EIS No. 20070272, Draft EIS, STB, UT, Central Utah Rail Project, Six Counties Association of Governments, Construction and Operation Exemption Rail Line between Levan and Salina, Right-of-Way Application, Docket No. FD 34075, Sanpete, Sevier, Juab Counties, UT. Comment Period Ends: 08/22/2007. Contact: Phillis Johnson-Ball 202–245–0304. EIS No. 20070273, Draft Supplement, MMS, 00, Eastern Planning Area Outer Continental Shelf (OCS) Oil and Gas Lease Sale 224, Gulf of Mexico Offshore Marine Environment and Coastal Marshes/Counties of LA, MS, AL, and North Western Florida. Comment Period Ends: 08/20/2007. Contact: Dr. Sally Valdes 703–787– 1707. EIS No. 20070274, Draft EIS, COE, MD, Atlantic Coast of Maryland Shoreline Protection Project, Proposed Dredging of Several New Offshore Shoals to Provide Sand for Borrow Sources from 2010 to 2044, Ocean City, Worcester County, MD. Comment Period Ends: 08/28/2007. Contact: Christopher Spaur 410–962–6134. EIS No. 20070275, Draft EIS, FHW, CA, Eureka–Arcata Route 101 Corridor Improvement Project, Proposed Roadway Improvements on Route 101 between the Eureka Slough Bridge and 11th St. Overcrossing in Arcata, Humbolt County, CA. Comment VerDate Aug<31>2005 17:16 Jul 05, 2007 Jkt 211001 Period Ends: 08/24/2007. Contact: Lanh Phan 916–498–5046. EIS No. 20070276, Draft Supplement, COE, MS, Pascagoula Harbor Navigation Channel Project, To Construct Congressionally Authorized Widening and Deepening Improvements, To Update the FEIS– 1985, Jackson County, MS. Comment Period Ends: 08/20/2007. Contact: Jenny L. Jackson 251–690–2724. EIS No. 20070277, Draft EIS, CGD, AL, Bienville Offshore Energy Terminal Deepwater Port License Application, Proposes to Construct and Operate a Liquefied Natural Gas Receiving and Regasification Facility, Outer Continental Shelf of the Gulf of Mexico, South of Fort Morgan, AL. Comment Period Ends: 08/20/2007. Contact: Mary Jager 202–372–1454. EIS No. 20070278, Draft EIS, FHW, CA, Tier 1—Placer Parkway Corridor Preservation Project, Select and Preserve a Corridor for the Future Construction from CA–70/99 to CA 65, Placer and Sutter Counties, CA. Comment Period Ends: 08/20/2007. Contact: Cesar Perez 916–498–5065. EIS No. 20070279, Final EIS, AFS, WA, White Pass Expansion Master Development Plan, Implementation, Naches Ranger District, OkanoganWenatchee National Forests and Cowlitz Valley Ranger District, Gifford Pinchot National Forest, Yakima and Lewis Counties, WA. Wait Period Ends: 08/06/2007. Contact: Randy Shepard 509–653– 1446. EIS No. 20070280, Final EIS, USA, VA, Fort Belvoir 2005 Base Realignment and Closure (BRAC). Recommendations and Related Army Actions, Implementation, Fairfax County, VA. Wait Period Ends: 08/06/ 2007. Contact: Bob Ross 703–602– 2878. Dated: July 2, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–13095 Filed 7–5–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP–2007–0402; FRL–8136–8] Bioban P–1487 Risk Assessment; Notice of Availability and Risk Reduction Options Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 SUMMARY: This notice announces the availability of EPA’s risk assessments, and related documents for the pesticide Bioban P–1487, and opens a public comment period on these documents. The public is encouraged to suggest risk management ideas or proposals to address the risks identified. EPA is developing a Reregistration Eligibility Decision (RED) for Bioban P–1487 through a modified, 4–Phase public participation process that the Agency uses to involve the public in developing pesticide reregistration decisions. Through this program, EPA is ensuring that all pesticides meet current health and safety standards. DATES: Comments must be received on or before September 4, 2007. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA-HQ-OPP–2007–0402, by one of the following methods: • Federal eRulemaking Portal: https:// www.regulations.gov. Follow the on-line instructions for submitting comments. • Mail: Office of Pesticide Programs (OPP) Regulatory Public Docket (7502P), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001. • Delivery: OPP Regulatory Public Docket (7502P), Environmental Protection Agency, Rm. S–4400, One Potomac Yard (South Bldg.), 2777 S. Crystal Dr., Arlington, VA. Deliveries are only accepted during the Docket’s normal hours of operation (8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays). Special arrangements should be made for deliveries of boxed information. The Docket Facility telephone number is (703) 305–5805. Instructions: Direct your comments to docket ID number EPA-HQ-OPP–2007– 0402. EPA’s policy is that all comments received will be included in the docket without change and may be made available on-line at https:// www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through regulations.gov or email. The Federal regulations.gov website is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly to EPA without going through regulations.gov, your email address will be automatically E:\FR\FM\06JYN1.SGM 06JYN1

Agencies

[Federal Register Volume 72, Number 129 (Friday, July 6, 2007)]
[Notices]
[Pages 37005-37006]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13095]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6688-6]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 06/25/2007 Through 06/29/2007
Pursuant to 40 CFR 1506.9.

EIS No. 20070265, Final EIS, AFS, CA, Pilgrim Vegetation Management 
Project, Proposed Restoration of Forest Health and Ecosystem, 
Implementation, Shasta-Trinity National Forest, Siskiyou County, CA, 
Wait Period Ends: 08/06/2007. Contact: Dennis Poehlmann 530-926-9656. 
This document is available on the Internet at: https://www.fs.fed.us/r5/
shastatrinity/projects/smmu-projects.shtml.
EIS No. 20070266, Draft EIS, SFW, 00, Lake Umbagog National Wildlife 
Refuge, Comprehensive Conservation Plan, 15 Year Guidance for 
Management of Refuge Operations, Habitat and Visitor Services, 
Implementation, Coos County, NH and Oxford County, ME. Comment Period 
Ends: 08/20/2007. Contact: Nancy McGarigal 413-253-8562.
EIS No. 20070267, Second Draft Supplement, COE, FL, Lake Okeechobee 
Regulation Schedule Study, New Updated Information, Evaluation of Three 
New Alternatives on Operational Changes to the Current Water Control 
Plan, Lake Okeechobee and the Everglades Agricultural Area, Lake 
Okeechobee, Glades, Okeechobee Hendry, Palm Beach and Martin Counties, 
FL. Comment Period Ends: 08/20/2007. Contact: Yvonne L. Haberer 904-
232-1701.

[[Page 37006]]

EIS No. 20070268, Final EIS, GSA, VT, U.S. Commercial Port of Entry, 
Replacing existing Station at Route I-91, Design and Construction, 
Derby Line, Vermont. Wait Period Ends: 08/06/2007. Contact: Glenn C. 
Rotondo 617-565-5694.
EIS No. 20070269, Draft EIS, IBR, CA, Lower Yuba River Accord, Proposal 
to Resolve Instream Flow Issues Associated with Operation, Yuba River, 
Yuba County, CA. Comment Period Ends: 08/24/2007. Contact: Tamara 
LaFramboise 916-978-5269.
EIS No. 20070270, Draft EIS, NRC, MD, License Renewal of the National 
Bureau of Standards Reactor (NBSR), Renew the Operating License for an 
Addditional 20 Years, National Institute of Standards and Technology 
(NIST), NUREG-1873, Montgomery County, MD. Comment Period Ends: 09/05/
2007. Contact: Dennis Beissel 301-415-2145.
EIS No. 20070271, Final EIS, AFS, WI, Fishbone Project Area, Vegetation 
and Road Management, Implementation, Washburn Ranger District, 
Chequamegon-Nicolet National Forest, Bayfield County, WI. Wait Period 
Ends: 08/06/2007. Contact: Jennifer Maziasz 715-373-2267 Ext 235.
EIS No. 20070272, Draft EIS, STB, UT, Central Utah Rail Project, Six 
Counties Association of Governments, Construction and Operation 
Exemption Rail Line between Levan and Salina, Right-of-Way Application, 
Docket No. FD 34075, Sanpete, Sevier, Juab Counties, UT. Comment Period 
Ends: 08/22/2007. Contact: Phillis Johnson-Ball 202-245-0304.
EIS No. 20070273, Draft Supplement, MMS, 00, Eastern Planning Area 
Outer Continental Shelf (OCS) Oil and Gas Lease Sale 224, Gulf of 
Mexico Offshore Marine Environment and Coastal Marshes/Counties of LA, 
MS, AL, and North Western Florida. Comment Period Ends: 08/20/2007. 
Contact: Dr. Sally Valdes 703-787-1707.
EIS No. 20070274, Draft EIS, COE, MD, Atlantic Coast of Maryland 
Shoreline Protection Project, Proposed Dredging of Several New Offshore 
Shoals to Provide Sand for Borrow Sources from 2010 to 2044, Ocean 
City, Worcester County, MD. Comment Period Ends: 08/28/2007. Contact: 
Christopher Spaur 410-962-6134.
EIS No. 20070275, Draft EIS, FHW, CA, Eureka-Arcata Route 101 Corridor 
Improvement Project, Proposed Roadway Improvements on Route 101 between 
the Eureka Slough Bridge and 11th St. Overcrossing in Arcata, Humbolt 
County, CA. Comment Period Ends: 08/24/2007. Contact: Lanh Phan 916-
498-5046.
EIS No. 20070276, Draft Supplement, COE, MS, Pascagoula Harbor 
Navigation Channel Project, To Construct Congressionally Authorized 
Widening and Deepening Improvements, To Update the FEIS-1985, Jackson 
County, MS. Comment Period Ends: 08/20/2007. Contact: Jenny L. Jackson 
251-690-2724.
EIS No. 20070277, Draft EIS, CGD, AL, Bienville Offshore Energy 
Terminal Deepwater Port License Application, Proposes to Construct and 
Operate a Liquefied Natural Gas Receiving and Regasification Facility, 
Outer Continental Shelf of the Gulf of Mexico, South of Fort Morgan, 
AL. Comment Period Ends: 08/20/2007. Contact: Mary Jager 202-372-1454.
EIS No. 20070278, Draft EIS, FHW, CA, Tier 1--Placer Parkway Corridor 
Preservation Project, Select and Preserve a Corridor for the Future 
Construction from CA-70/99 to CA 65, Placer and Sutter Counties, CA. 
Comment Period Ends: 08/20/2007. Contact: Cesar Perez 916-498-5065.
EIS No. 20070279, Final EIS, AFS, WA, White Pass Expansion Master 
Development Plan, Implementation, Naches Ranger District, Okanogan-
Wenatchee National Forests and Cowlitz Valley Ranger District, Gifford 
Pinchot National Forest, Yakima and Lewis Counties, WA. Wait Period 
Ends: 08/06/2007. Contact: Randy Shepard 509-653-1446.
EIS No. 20070280, Final EIS, USA, VA, Fort Belvoir 2005 Base 
Realignment and Closure (BRAC). Recommendations and Related Army 
Actions, Implementation, Fairfax County, VA. Wait Period Ends: 08/06/
2007. Contact: Bob Ross 703-602-2878.

    Dated: July 2, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E7-13095 Filed 7-5-07; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.