36696
Federal Register / Vol. 72, No. 128 / Thursday, July 5, 2007 / Notices
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, N.E., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, D.C.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 23, 2007
Kimberly D. Bose,
Secretary.
[FR Doc. E7–12935 Filed 7–3–07; 8:45 am]
BILLING CODE 6717–01–P
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 12, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–12934 Filed 7–3–07; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. EL07–67–000]
DEPARTMENT OF ENERGY
DC Energy, LLC Complainant, v. H.Q.
Energy Services (U.S.) Inc.
Respondent; Notice of Amended
Complaint
Federal Energy Regulatory
Commission
June 27, 2007.
sroberts on PROD1PC70 with NOTICES
DEPARTMENT OF ENERGY
June 29, 2007.
Take notice that on June 22, 2007, DC
Energy, LLC (DC Energy) pursuant to
Rule 215 of the Rules of Practice and
Procedure of the Commission’s
Regulations, 18 CFR 385.215, filed an
amendment to its June 12, 2007,
Complaint. DC Energy states that it has
discovered new facts which are directly
relevant to the issues raised in its
original Complaint.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
VerDate Aug<31>2005
18:43 Jul 03, 2007
Jkt 211001
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER05–1065–010.
Applicants: Entergy Services, Inc.
Description: Entergy Operating
Companies submits its compliance
filing in accordance with Commission’s
May 25, 2007 Order.
Filed Date: 06/25/2007.
Accession Number: 20070627–0102.
Comment Date: 5 p.m. Eastern Time
on Monday, July 16, 2007.
Docket Numbers: ER07–157–001,
ER06–398–002, ER06–399–002, ER04–
268–005, ER98–4159–008.
Applicants: Macquarie Cook Power,
Inc.; Duquesne Keystone LLC; Duquesne
Conemaugh LLC; Duquesne Power, LLC;
Duquesne Light Company.
Description: Macquarie Cook Power,
Inc et al submit their notice of change
in status related to the 5/31/07
acquisition of Duquesne Light Holdings,
Inc.
Filed Date: 06/25/2007.
Accession Number: 20070627–0101.
Comment Date: 5 p.m. Eastern Time
on Monday, July 16, 2007.
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
Docket Numbers: ER07–613–004,
ER07–1077–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corp submits
amendments to the ISO Tariff 2007
Congestion Revenue Rights Credit
Policy Amendment.
Filed Date: 06/22/2007.
Accession Number: 20070627–0104.
Comment Date: 5 p.m. Eastern Time
on Friday, July 13, 2007.
Docket Numbers: ER07–1076–000.
Applicants: Upper Peninsula Power
Company.
Description: Upper Peninsula Power
Co submits a letter of understanding
with the City of Escanaba, Michigan,
will begin on 6/25/07.
Filed Date: 06/25/2007.
Accession Number: 20070627–0108.
Comment Date: 5 p.m. Eastern Time
on Monday, July 16, 2007.
Docket Numbers: ER07–1078–000.
Applicants: American Electric Power
Service Corporation.
Description: AEP Operating
Companies submit an Interconnection
and Local Delivery Service Agreement
with the Village of Glouster, Ohio.
Filed Date: 06/26/2007.
Accession Number: 20070628–0084.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 17, 2007.
Docket Numbers: ER07–1079–000.
Applicants: American Electric Power
Service Corporation.
Description: Ohio Power Co and
Columbus Southern Power Company
submit their eighth revision to the
Interconnection and Local Delivery
Service Agreement with Buckeye Power,
Inc.
Filed Date: 06/26/2007.
Accession Number: 20070628–0085.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 17, 2007.
Docket Numbers: ER07–1080–000.
Applicants: American Electric Power
Service Corporation.
Description: AEP Operating
Companies submits an Interconnection
and Local Delivery Service Agreement
with the Village of Woodsfield,
Woodsfield, Ohio.
Filed Date: 06/26/2007.
Accession Number: 20070628–0086.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 17, 2007.
Docket Numbers: ER07–1081–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison submits a Large Generator
Interconnection Agreement etc for
Wholesale Distribution Service between
the Transmission and Distribution
E:\FR\FM\05JYN1.SGM
05JYN1
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 72, No. 128 / Thursday, July 5, 2007 / Notices
Business Unit of SCE et al for the Mira
Loma Peaker Project.
Filed Date: 06/26/2007.
Accession Number: 20070628–0221.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 17, 2007.
Docket Numbers: ER07–1082–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison submits a Large Generator
Interconnection Agreement etc for
Wholesale Distribution Service between
the Transmission and Distribution
Business Unit of SCE et al for the
Grapeland Peaker Project.
Filed Date: 06/26/2007.
Accession Number: 20070628–0220.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 17, 2007.
Docket Numbers: ER07–1083–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison submits a Large Generator
Interconnection Agreement etc for
Wholesale Distribution Service between
the Transmission and Distribution
Business Unit of SCE et al for the Center
Peaker Project.
Filed Date: 06/26/2007.
Accession Number: 20070628–0219.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 17, 2007.
Docket Numbers: ER07–1084–000.
Applicants: Southern California
Edison Company.
Description: Southern California
Edison submits a Large Generator
Interconnection Agreement etc for
Wholesale Distribution Service between
the Transmission and Distribution
Business Unit of SCE et al for the Barre
Peaker Project.
Filed Date: 06/26/2007.
Accession Number: 20070628–0218.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 17, 2007.
Docket Numbers: ER07–1085–000.
Applicants: Niagara Mohawk Power
Corporation.
Description: Niagara Mohawk Power
Corp dba National Grid submits an
Amended and Restated Power Sales
Agreement with Fulton Cogeneration
Associates, LP, designated as Service
Agreement 1150.
Filed Date: 06/26/2007.
Accession Number: 20070628–0082.
Comment Date: 5 p.m. Eastern Time
on Tuesday, July 17, 2007.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
VerDate Aug<31>2005
18:43 Jul 03, 2007
Jkt 211001
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at
https://www.ferc.gov. To facilitate
electronic service, persons with Internet
access who will eFile a document and/
or be listed as a contact for an
intervenor must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the web site that
enables subscribers to receive email
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary,
[FR Doc. E7–13064 Filed 7–3–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
36697
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11588–027—AK]
Alaska Power and Telephone
Company; Notice of Availability of
Environmental Assessment
June 28, 2007.
An environmental assessment (EA) is
available for public review. The EA was
prepared for an application filed by
Alaska Power and Telephone Company
(licensee) on January 26, 2007, and
supplemented on March 6 and April 5,
2007, requesting Commission approval
for an Amendment of License to Modify
Project Design at the Kasidaya
Hydroelectric Project. The project is
located on Kasidaya Creek at Taiya
Inlet, 3 miles south of the City of
Skagway, Alaska. The project occupies
lands within the Tongass National
Forest, administered by the U.S. Forest
Service.
The licensee has requested that in lieu
of passing the penstock through a tunnel
to cross Kasidaya Creek and gain access
to the diversion structure, they would
like to have the penstock cross over
Kasidaya Creek with a modular steel
bridge. The penstock would be buried
adjacent to the access road, except for
crossing the creek, on a small bridge
adjacent to the aluminum block culvert.
In addition to being significantly less
expensive than the tunnel, the bridge
arrangement would also provide more
convenient access to the diversion site
for construction and operation of the
project.
The Environmental Assessment (EA),
which is attached to the order approving
order amending license and revising
annual charges, evaluates the
environmental effects of the relocation
and redesign of project facilities. While
these changes to project facilities will
impact areas not specifically evaluated
in previous EA’s, the environmental
effects are expected to be similar.
A copy of the EA is attached to a
Commission order titled ‘‘Approving
Order Amending License and Revising
Annual Charges,’’ issued June 27, 2007
and is available for review at the
Commission or may be viewed on the
Commission’s web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access documents. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll-
E:\FR\FM\05JYN1.SGM
05JYN1
Agencies
[Federal Register Volume 72, Number 128 (Thursday, July 5, 2007)]
[Notices]
[Pages 36696-36697]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-13064]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
June 29, 2007.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER05-1065-010.
Applicants: Entergy Services, Inc.
Description: Entergy Operating Companies submits its compliance
filing in accordance with Commission's May 25, 2007 Order.
Filed Date: 06/25/2007.
Accession Number: 20070627-0102.
Comment Date: 5 p.m. Eastern Time on Monday, July 16, 2007.
Docket Numbers: ER07-157-001, ER06-398-002, ER06-399-002, ER04-268-
005, ER98-4159-008.
Applicants: Macquarie Cook Power, Inc.; Duquesne Keystone LLC;
Duquesne Conemaugh LLC; Duquesne Power, LLC; Duquesne Light Company.
Description: Macquarie Cook Power, Inc et al submit their notice of
change in status related to the 5/31/07 acquisition of Duquesne Light
Holdings, Inc.
Filed Date: 06/25/2007.
Accession Number: 20070627-0101.
Comment Date: 5 p.m. Eastern Time on Monday, July 16, 2007.
Docket Numbers: ER07-613-004, ER07-1077-000.
Applicants: California Independent System Operator Corporation.
Description: California Independent System Operator Corp submits
amendments to the ISO Tariff 2007 Congestion Revenue Rights Credit
Policy Amendment.
Filed Date: 06/22/2007.
Accession Number: 20070627-0104.
Comment Date: 5 p.m. Eastern Time on Friday, July 13, 2007.
Docket Numbers: ER07-1076-000.
Applicants: Upper Peninsula Power Company.
Description: Upper Peninsula Power Co submits a letter of
understanding with the City of Escanaba, Michigan, will begin on 6/25/
07.
Filed Date: 06/25/2007.
Accession Number: 20070627-0108.
Comment Date: 5 p.m. Eastern Time on Monday, July 16, 2007.
Docket Numbers: ER07-1078-000.
Applicants: American Electric Power Service Corporation.
Description: AEP Operating Companies submit an Interconnection and
Local Delivery Service Agreement with the Village of Glouster, Ohio.
Filed Date: 06/26/2007.
Accession Number: 20070628-0084.
Comment Date: 5 p.m. Eastern Time on Tuesday, July 17, 2007.
Docket Numbers: ER07-1079-000.
Applicants: American Electric Power Service Corporation.
Description: Ohio Power Co and Columbus Southern Power Company
submit their eighth revision to the Interconnection and Local Delivery
Service Agreement with Buckeye Power, Inc.
Filed Date: 06/26/2007.
Accession Number: 20070628-0085.
Comment Date: 5 p.m. Eastern Time on Tuesday, July 17, 2007.
Docket Numbers: ER07-1080-000.
Applicants: American Electric Power Service Corporation.
Description: AEP Operating Companies submits an Interconnection and
Local Delivery Service Agreement with the Village of Woodsfield,
Woodsfield, Ohio.
Filed Date: 06/26/2007.
Accession Number: 20070628-0086.
Comment Date: 5 p.m. Eastern Time on Tuesday, July 17, 2007.
Docket Numbers: ER07-1081-000.
Applicants: Southern California Edison Company.
Description: Southern California Edison submits a Large Generator
Interconnection Agreement etc for Wholesale Distribution Service
between the Transmission and Distribution
[[Page 36697]]
Business Unit of SCE et al for the Mira Loma Peaker Project.
Filed Date: 06/26/2007.
Accession Number: 20070628-0221.
Comment Date: 5 p.m. Eastern Time on Tuesday, July 17, 2007.
Docket Numbers: ER07-1082-000.
Applicants: Southern California Edison Company.
Description: Southern California Edison submits a Large Generator
Interconnection Agreement etc for Wholesale Distribution Service
between the Transmission and Distribution Business Unit of SCE et al
for the Grapeland Peaker Project.
Filed Date: 06/26/2007.
Accession Number: 20070628-0220.
Comment Date: 5 p.m. Eastern Time on Tuesday, July 17, 2007.
Docket Numbers: ER07-1083-000.
Applicants: Southern California Edison Company.
Description: Southern California Edison submits a Large Generator
Interconnection Agreement etc for Wholesale Distribution Service
between the Transmission and Distribution Business Unit of SCE et al
for the Center Peaker Project.
Filed Date: 06/26/2007.
Accession Number: 20070628-0219.
Comment Date: 5 p.m. Eastern Time on Tuesday, July 17, 2007.
Docket Numbers: ER07-1084-000.
Applicants: Southern California Edison Company.
Description: Southern California Edison submits a Large Generator
Interconnection Agreement etc for Wholesale Distribution Service
between the Transmission and Distribution Business Unit of SCE et al
for the Barre Peaker Project.
Filed Date: 06/26/2007.
Accession Number: 20070628-0218.
Comment Date: 5 p.m. Eastern Time on Tuesday, July 17, 2007.
Docket Numbers: ER07-1085-000.
Applicants: Niagara Mohawk Power Corporation.
Description: Niagara Mohawk Power Corp dba National Grid submits an
Amended and Restated Power Sales Agreement with Fulton Cogeneration
Associates, LP, designated as Service Agreement 1150.
Filed Date: 06/26/2007.
Accession Number: 20070628-0082.
Comment Date: 5 p.m. Eastern Time on Tuesday, July 17, 2007.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the web site that enables subscribers to receive email notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary,
[FR Doc. E7-13064 Filed 7-3-07; 8:45 am]