Dominion Transmission, Inc.; Notice of Compliance Filing, 35702-35703 [E7-12613]
Download as PDF
35702
Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Notices
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov., or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. QF07–115–000]
Continental Cogeneration Services;
Notice of Self-Certification of
Qualifying Status of a Cogeneration
Facility
Kimberly D. Bose,
Secretary.
[FR Doc. E7–12614 Filed 6–28–07; 8:45 am]
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–12612 Filed 6–28–07; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RP07–434–001]
[Docket No. RP07–429–001]
Dominion Cove Point LNG, LP; Notice
of Compliance Filing
Dominion Transmission, Inc.; Notice of
Compliance Filing
June 22, 2007.
mstockstill on PROD1PC66 with NOTICES
June 22, 2007.
Take notice that on March 9, 2007, as
completed on May 30, 2007, Continental
Cogeneration Services, 964 Ebbets Ave.,
Manteca, California, filed with the
Federal Energy Regulatory Commission
a notice of self-certification of a facility
as a qualifying cogeneration facility
pursuant to 18 CFR 292.207(a) of the
Commission’s regulations.
The facility for which certification is
requested is a topping-cycle
cogeneration facility. The primary
energy source is natural gas. The power
production equipment includes a
Siemens SGT6–5000F gas turbine in
combined cycle, with a maximum net
power production of 275 MW. The
location of the facility is 12045 South
Ingomar Grade, Los Banos, California.
The Name of the electric utility with
which the facility expects to
interconnect, transmit or sell electric
energy to, or purchase supplementary,
standby, back-up and maintenance
power is the Pacific Gas & Electric
Company (PG&E).
The applicant proposes to sell more
than 50 percent of its aggregate, annual
energy output to PG&E. Although the
facility does not fall within the 50
percent ‘‘safe harbor’’ for fundamental
use of energy output in 18 CFR
292.205(d)(3), the applicant argues that
the facility’s beneficial use of
biomethane from digested cow manure
as 5 percent of the fuel input is
sufficient to meet the requirements of 18
CFR 292.205(d)(2).
A notice of self-certification does not
institute a proceeding regarding
qualifying facility status; a notice of selfcertification provides notice that the
entity making filing has determined the
Facility meets the applicable criteria to
be a qualifying facility. Any person
seeking to challenge such qualifying
facility status may do so by filing a
motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible on-line at
https://www.ferc.gov., using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
VerDate Aug<31>2005
16:20 Jun 28, 2007
Jkt 211001
June 22, 2007.
Take notice that on June 20, 2007,
Dominion Cove Point LNG, LP (Cove
Point) submitted a compliance filing
pursuant to the Commission’s order
issued May 31, 2007 in Docket No.
RP07–429–000.
Cove Point states that copies of the
filing were served on parties on the
official service list in the abovecaptioned proceeding.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Take notice that on June 20, 2007,
Dominion Transmission, Inc. (DTI)
submitted a compliance filing pursuant
to the Commission’s order issued May
31, 2007 in Docket No. RP07–434–000.
DTI states that copies of the filing
were served on parties on the official
service list in the above-captioned
proceeding.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
§ 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\29JNN1.SGM
29JNN1
Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–12613 Filed 6–28–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2242–078—Oregon]
Eugene Water and Electric Board;
Notice of Designation of Certain
Commission Personnel as NonDecisional
June 22, 2007.
Commission staff member James
Hastreiter (Office of Energy Projects
503–552–2760;
james.hastreiter@ferc.gov) is assigned to
help resolve environmental and other
issues associated with development of a
settlement agreement for the CarmenSmith Project.
As ‘‘non-decisional’’ staff, Mr.
Hastreiter will not participate in an
advisory capacity in the Commission’s
review of any offer of settlement or
settlement agreement, or deliberations
concerning the disposition of the
relicense application.
Different Commission ‘‘advisory staff’’
will be assigned to review any offer of
settlement or settlement agreement, and
to process the relicense application,
including providing advice to the
Commission with respect to the
agreement and the application. Nondecisional staff and advisory staff are
prohibited from communicating with
one another concerning the settlement
and the relicense application.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–12617 Filed 6–28–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER07–761–000 and ER07–761–
001]
mstockstill on PROD1PC66 with NOTICES
Fulcrum Energy Limited; Notice of
Issuance of Order
June 22, 2007.
Fulcrum Energy Limited (Fulcrum)
filed an application for market-based
rate authority, with an accompanying
tariff. The proposed market-based rate
tariff provides for the sale of energy, and
VerDate Aug<31>2005
16:20 Jun 28, 2007
Jkt 211001
capacity at market-based rates. Fulcrum
also requested waivers of various
Commission regulations. In particular,
Fulcrum requested that the Commission
grant blanket approval under 18 CFR
Part 34 of all future issuances of
securities and assumptions of liability
by Fulcrum.
On June 19, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by Fulcrum should file a
protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is July 19,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Fulcrum is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of
Fulcrum, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Fulcrums’ issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
35703
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–12616 Filed 6–28–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER07–874–000]
Rainbow Energy Ventures LLC; Notice
of Issuance of Order
June 22, 2007.
Rainbow Energy Ventures LLC
(Rainbow Ventures) filed an application
for market-based rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. Rainbow Ventures also requested
waivers of various Commission
regulations. In particular, Rainbow
Ventures requested that the Commission
grant blanket approval under 18 CFR
Part 34 of all future issuances of
securities and assumptions of liability
by Rainbow Ventures.
On June 19, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by Rainbow Ventures should
file a protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is July 19,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Rainbow Ventures
is authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of
Rainbow Ventures, compatible with the
E:\FR\FM\29JNN1.SGM
29JNN1
Agencies
[Federal Register Volume 72, Number 125 (Friday, June 29, 2007)]
[Notices]
[Pages 35702-35703]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-12613]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP07-434-001]
Dominion Transmission, Inc.; Notice of Compliance Filing
June 22, 2007.
Take notice that on June 20, 2007, Dominion Transmission, Inc.
(DTI) submitted a compliance filing pursuant to the Commission's order
issued May 31, 2007 in Docket No. RP07-434-000.
DTI states that copies of the filing were served on parties on the
official service list in the above-captioned proceeding.
Any person desiring to protest this filing must file in accordance
with Rule 211 of the Commission's Rules of Practice and Procedure (18
CFR 385.211). Protests to this filing will be considered by the
Commission in determining the appropriate action to be taken, but will
not serve to make protestants parties to the proceeding. Such protests
must be filed in accordance with the provisions of Sec. 154.210 of the
Commission's regulations (18 CFR 154.210). Anyone filing a protest must
serve a copy of that document on all the parties to the proceeding.
The Commission encourages electronic submission of protests in lieu
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons
unable to file electronically should submit an original and 14 copies
of the protest to the Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
[[Page 35703]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-12613 Filed 6-28-07; 8:45 am]