Western Systems Power Pool Agreement; Notice of Institution of Proceeding and Refund Effective Date, 35704 [E7-12611]

Download as PDF 35704 Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Notices public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of Rainbow Ventures’ issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E7–12615 Filed 6–28–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL07–69–000] Western Systems Power Pool Agreement; Notice of Institution of Proceeding and Refund Effective Date mstockstill on PROD1PC66 with NOTICES June 22, 2007. On June 21, 2007, the Commission issued an order that instituted a proceeding in the above-referenced docket, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824c, to investigate whether the Western Systems Power Pool Agreement ceiling rate is just and reasonable for a public utility seller in markets in which such seller has been found to have market power or is presumed to have market power. Western System Power Pool, 119 FERC ¶ 61,302 (2007). The refund effective date in the above-docketed proceeding, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Kimberly D. Bose, Secretary. [FR Doc. E7–12611 Filed 6–28–07; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 16:20 Jun 28, 2007 Jkt 211001 ENVIRONMENTAL PROTECTION AGENCY [ER-FRL–6688–5] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 6, 2007 (72 FR 17156). Draft EISs EIS No. 20070055, ERP No. D–AFS– L65534–ID, Idaho Cobalt Project, Development of Two Underground Mines, a Waste Disposal Site and Associated Facilities, Approval of Plan-of-Operation, Salmon-Cobalt Ranger District, Salmon-Challis National Forest, Lemhi County, ID. Summary: EPA expressed environmental concerns about the impacts to fishery and cultural resources and impacts related to contaminated soils. Rating EC2. EIS No. 20070103, ERP No. D–FHW– C50015–NY, Kosciuszko Bridge Project, Proposed Rehabilitation or Replacement a 1.1 mile Segment Brooklyn-Queens Expressway (-278) from Morgan Avenue in Brooklyn and the Long Island Expressway (1495) in Queens, Kings and Queens Counties, NY. Summary: EPA expressed environmental concerns about potential air quality impacts, and requested additional information and mitigation. Rating EC2. EIS No. 20070132, ERP No. D–AFS– J61111–00, Yellowstone and Grand Teton National Parks and the John D. Rockefeller, Jr. Memorial Parkway, Winter Use Plan, To Provide a Framework for Managing Winter Use Activities, Implementation, Fremont County, ID, Gallatin and Park Counties, MT Park and Teton Counties, WY. Summary: EPA expressed environmental concerns about air quality, natural soundscapes, and wildlife. EPA believes that the preferred alternative should be modified or a different alternative should be selected that meets the National Park Service’s adaptive management thresholds and its PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 resource protection directives. Rating EC2. EIS No. 20070171, ERP No. D–FRC– K03030–00, Phoenix Expansion Project, Construction and Operation of Existing Natural Gas Transmission Pipeline, Right-of-Way Grant and Temporary Use Permit, San Juan and McKinley Counties, NM and Pinal and Maricopa Counties, AZ. Summary: EPA expressed environmental concerns about potential impacts to air quality, aquatic resources, and endangered species. EPA recommended that the FEIS provide additional information regarding alternatives and identify, and commit to, opportunities for minimizing impacts. Rating EC2. EIS No. 20070172, ERP No. D–FRC– G03035–00, Southeast Supply Header Project, Construction and Operation of Natural Gas Pipeline Facilities, Located in various Counties and Parishes in LA, MS and AL. Summary: EPA expressed environmental concerns about potential impacts to wetlands and air quality, and recommended additional analyses to be included in the Final EIS. Rating EC2. EIS No. 20070174, ERP No. D–BPA– L91029–WA, Chief Joseph Hatchery Program, Construction, Operation and Maintenance of a Chinook Salmon Hatchery Production Program, Confederated Tribes of the Colville Reservation (Colville Tribes), Okanogan River and Columbia River, Okanogan County, WA. Summary: EPA expressed environmental concerns about discharge water quality and requested additional information regarding the applicability of state and tribal water quality standards. Rating EC2. EIS No. 20070051, ERP No. DS–COE– E32070–MS, Gulfport Harbor Navigation Channel Project, Updated Information on Providing Safe and Unrestricted Navigation into and out of Gulfport Harbor, Harrison County, MS. Summary: EPA expressed environmental concerns about impacts to biological resources. EPA requested additional information to ensure that the dredged material to be disposed meets the relevant Ocean Dumping Criteria. Rating EC2. Final EISs EIS No. 20070087, ERP No. F–FTA– E40775–FL, Miami North Corridor Project, Build Alternative is Selected, Transit Improvement between NW 62 Street at Dr. Martin Luther King Jr. Station and NW 215th Street at the E:\FR\FM\29JNN1.SGM 29JNN1

Agencies

[Federal Register Volume 72, Number 125 (Friday, June 29, 2007)]
[Notices]
[Page 35704]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-12611]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL07-69-000]


Western Systems Power Pool Agreement; Notice of Institution of 
Proceeding and Refund Effective Date

June 22, 2007.
    On June 21, 2007, the Commission issued an order that instituted a 
proceeding in the above-referenced docket, pursuant to section 206 of 
the Federal Power Act (FPA), 16 U.S.C. 824c, to investigate whether the 
Western Systems Power Pool Agreement ceiling rate is just and 
reasonable for a public utility seller in markets in which such seller 
has been found to have market power or is presumed to have market 
power. Western System Power Pool, 119 FERC ] 61,302 (2007).
    The refund effective date in the above-docketed proceeding, 
established pursuant to section 206(b) of the FPA, will be the date of 
publication of this notice in the Federal Register.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-12611 Filed 6-28-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.