Notice of Electronic Distribution Initiative Pilot Program, 35520-35521 [E7-12563]
Download as PDF
35520
Federal Register / Vol. 72, No. 124 / Thursday, June 28, 2007 / Notices
HEU fuel in accordance with the
schedules planned by the Department of
Energy to support U.S. non-proliferation
policies and the licensee to support its
academic mission.
IV
Accordingly, pursuant to Sections 51,
53, 57, 101, 104, 161b, 161i, and 161o
of the Atomic Energy Act of 1954, as
amended, and to Commission
regulations in 10 CFR 2.202 and 10 CFR
50.64, It is hereby ordered that:
Facility Operating License No. R–87 is
modified by adding the following
license condition:
2.B.(4) Pursuant to the Act and 10 CFR
Part 70, ‘‘Domestic Licensing of Special
Nuclear Material,’’ to receive and possess,
but not use in the reactor, in addition to the
amount specified under License Condition
2.B.(2), up to 4.0 kilograms of contained
uranium-235 in the form of reactor fuel, at
enrichments less than 20 percent.
This Order will be effective 20 days
after the date of publication of this
Order in the Federal Register.
mstockstill on PROD1PC66 with NOTICES
V
Pursuant to the Atomic Energy Act of
1954, as amended, any person adversely
affected by this Order may submit an
answer to this Order, and may request
a hearing on this Order, within 20 days
of the date of this Order. Any answer or
request for a hearing shall set forth the
matters of fact and law on which the
person adversely affected, relies and the
reasons why the Order should not have
been issued. Any answer or request for
a hearing shall be filed: (1) By first class
mail addressed to the Office of the
Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) by courier,
express mail, and expedited delivery
services to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Because of possible delays in delivery of
mail to the United States Government
Offices, it is requested that answers and/
or requests for hearing be transmitted to
the Secretary of the Commission either
by e-mail addressed to the Office of the
Secretary, U.S. Nuclear Regulatory
Commission,
HEARINGDOCKET@NRC.GOV; or by
facsimile transmission addressed to the
Office of the Secretary, U.S. Nuclear
Regulatory Commission, Washington,
DC, Attention: Rulemakings and
Adjudications Staff at 301–415–1101
(the verification number is 301–415–
1966). Copies of the request for hearing
must also be sent to the Director, Office
VerDate Aug<31>2005
18:23 Jun 27, 2007
Jkt 211001
of Nuclear Reactor Regulation and to the
Assistant General Counsel for Materials
Litigation and Enforcement, Office of
the General Counsel, with both copies
addressed to the U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, and the NRC requests
that a copy also be transmitted either by
facsimile transmission to 301–415–3725
or by e-mail to OGCMailCenter@nrc.gov.
If a person requests a hearing, he or
she shall set forth in the request for a
hearing with particularity the manner in
which his or her interest is adversely
affected by this Order and shall address
the criteria set forth in 10 CFR 2.309.
If a hearing is requested by a person
whose interest is adversely affected, the
Commission shall issue an Order
designating the time and place of any
hearing. If a hearing is held, the issue to
be considered at such hearing shall be
whether this Order should be sustained.
In accordance with 10 CFR 51.10(d)
this Order is not subject to Section
102(2) of the National Environmental
Policy Act, as amended. The NRC staff
notes, however, that with respect to
environmental impacts associated with
the changes imposed by this Order as
described in the safety evaluation, the
changes would, if imposed by other
than an Order, meet the definition of a
categorical exclusion in accordance
with 10 CFR 51.22(c)(9). Thus, pursuant
to either 10 CFR 51.10(d) or 51.22(c)(9),
no environmental assessment nor
environmental impact statement is
required.
For further information see the letter
from the licensee dated May 25, 2007
(Agencywide Documents Access and
Management System (ADAMS)
Accession No. ML071500054), the
application for conversion and safety
analysis report (ADAMS Accession No.
ML062400495 and ML070920272), the
NRC staff’s request for additional
information (ADAMS Accession No.
ML070680273), the licensee’s reply
(ADAMS Accession No. ML071410299)
and the cover letter to the licensee and
the staff’s safety evaluation dated June
21, 2007 (ADAMS Accession No.
ML071550409), available for public
inspection at the Commission’s Public
Document Room (PDR), located at One
White Flint North, Public File Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available
records will be accessible electronically
from the ADAMS Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/adams.html. Persons who
do not have access to ADAMS or who
have problems in accessing the
documents in ADAMS should contact
the NRC PDR reference staff by
PO 00000
Frm 00099
Fmt 4703
Sfmt 4703
telephone at 1–800–397–4209 or 301–
415–4737 or by e-mail to pdr@nrc.gov.
Dated this 21st day of June 2007.
For the Nuclear Regulatory Commission.
James T. Wiggins,
Acting Director, Office of Nuclear Reactor
Regulation.
[FR Doc. E7–12565 Filed 6–27–07; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Notice of Electronic Distribution
Initiative Pilot Program
The Office of Nuclear Reactor
Regulation (NRR) at the U.S. Nuclear
Regulatory Commission (NRC) is
implementing a pilot program to test the
feasibility of its electronic distribution
initiative (EDI). The EDI seeks to
provide a more effective and efficient
method of communication with internal
and external stakeholders. The EDI is an
alternative to paper copy (hardcopy)
distribution of correspondence and is
replacing hardcopy distribution with
distribution via electronic mail (e-mail).
Currently, the NRR staff provides
paper copies for reactor licensing
activities to the addressee and each
entity on the carbon copy list, otherwise
known as the Service List. In the future,
the NRR staff intends to provide those
on the Service List via e-mail an
electronic link to licensing documents
which are available publicly in the
NRC’s Agencywide Documents Access
and Management System. The
addressees will continue to receive the
official NRC hardcopy. The distribution
of documents containing safeguards,
proprietary or security-related
information, or other information that is
withheld from public disclosure will
not be affected by this initiative at the
present time.
The EDI pilot program will begin July
1 and end September 30, 2007. Exelon
Generation Company, LLC (Exelon), one
of the NRC’s licensees, has agreed to
participate in this pilot program. The
Exelon plants included are: Byron
Station, Units 1 and 2; Braidwood
Station, Units 1 and 2; Clinton Power
Station, Unit 1; Dresden Nuclear Power
Station, Units 2 and 3; LaSalle County
Station, Units 1 and 2; and Quad Cities
Nuclear Power Station, Units 1 and 2.
The NRR staff plan to expand the EDI
to include all the operating reactor
licensees, with the goal for
implementation to begin in January
2008.
Dated at Rockville, Maryland, this 21st day
of June 2007.
E:\FR\FM\28JNN1.SGM
28JNN1
Federal Register / Vol. 72, No. 124 / Thursday, June 28, 2007 / Notices
For the Nuclear Regulatory Commission.
Russell A. Gibbs,
Chief, Plant Licensing Branch III–2, Division
of Operating Reactor Licensing. Office of
Nuclear Reactor Regulation.
[FR Doc. E7–12563 Filed 6–27–07; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
mstockstill on PROD1PC66 with NOTICES
Draft Regulatory Guide: Issuance,
Availability
The U.S. Nuclear Regulatory
Commission (NRC) has issued for public
comment a draft of a revised existing
guide in the agency’s Regulatory Guide
Series. This series has been developed
to describe and make available to the
public such information as methods that
are acceptable to the NRC staff for
implementing specific parts of the
NRC’s regulations, techniques that the
staff uses in evaluating specific
problems or postulated accidents, and
data that the staff needs in its review of
applications for permits and licenses.
The draft regulatory guide, entitled
‘‘Guidance on Monitoring and
Responding to Reactor Coolant System
Leakage,’’ is temporarily identified by
its task number, DG–1173, which
should be mentioned in all related
correspondence.
General Design Criterion (GDC) 14,
‘‘Reactor Coolant Pressure Boundary,’’
as set forth in Appendix A, ‘‘General
Design Criteria for Nuclear Power
Plants,’’ to Title 10, Part 50, of the Code
of Federal Regulations (10 CFR Part 50),
‘‘Domestic Licensing of Production and
Utilization Facilities’’, requires that the
reactor coolant pressure boundary
(RCPB) shall be designed, fabricated,
erected, and tested so as to have an
extremely low probability of abnormal
leakage, of rapidly propagating failure,
and of gross rupture. As a result, these
nuclear components are normally
designed to the criteria established in
Section III of the Boiler and Pressure
Vessel Code promulgated by the
American Society of Mechanical
Engineers.
During the design phase, degradationresistant materials are normally
specified for reactor coolant system
components. However, materials can
degrade as a result of the complex
interaction of the materials, the stresses
they encounter, and the normal and
upset operating environments in which
they are used. Such material
degradation could lead to the leakage of
the reactor coolant. Consequently, GDC
30, ‘‘Quality of Reactor Coolant Pressure
Boundary,’’ of Appendix A to 10 CFR
VerDate Aug<31>2005
18:23 Jun 27, 2007
Jkt 211001
Part 50, requires that means shall be
provided for detecting and, to the extent
practical, identifying the location of the
source of reactor coolant leakage.
Additionally, 10 CFR 50.55a, ‘‘Codes
and Standards’’, requires the
performance of inservice inspection and
testing of nuclear power plant
components. Thus, the concept of
defense-in-depth is used to provide
assurance that structural integrity of the
RCPB is maintained. This guide
describes methods that the staff of the
U.S. Nuclear Regulatory Commission
(NRC) considers acceptable for
implementing these requirements, with
regard to selecting reactor coolant
leakage detection systems, monitoring
for leakage, and responding to leakage.
This guide applies to light-water cooled
reactors.
The NRC staff is soliciting comments
on Draft Regulatory Guide DG–1173.
Comments may be accompanied by
relevant information or supporting data,
and should mention DG–1173 in the
subject line. Comments submitted in
writing or in electronic form will be
made available to the public in their
entirety through the NRC’s Agencywide
Documents Access and Management
System (ADAMS). Personal information
will not be removed from your
comments. You may submit comments
by any of the following methods.
Mail comments to: Rulemaking,
Directives, and Editing Branch, Office of
Administration, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
E-mail comments to:
NRCREP@nrc.gov. You may also submit
comments via the NRC’s rulemaking
Web site at https://ruleforum.llnl.gov.
Address questions about our rulemaking
Web site to Carol A. Gallagher (301)
415–5905; e-mail CAG@nrc.gov.
Hand-deliver comments to:
Rulemaking, Directives, and Editing
Branch, Office of Administration, U.S.
Nuclear Regulatory Commission, 11555
Rockville Pike, Rockville, Maryland
20852, between 7:30 a.m. and 4:15 p.m.
on Federal workdays.
Fax comments to: Rulemaking,
Directives, and Editing Branch, Office of
Administration, U.S. Nuclear Regulatory
Commission at (301) 415–5144.
Requests for technical information
about Draft Regulatory Guide DG–1173
may be directed to NRC Senior Program
Manager, Makuteswara Srinivasan, at
(301) 415–6356 or e-mail
MXS5@nrc.gov.
Comments would be most helpful if
received by 60 days from issuance of
FRN. Comments received after that date
will be considered if it is practical to do
so, but the NRC is able to ensure
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
35521
consideration only for comments
received on or before this date.
Although a time limit is given,
comments and suggestions in
connection with items for inclusion in
guides currently being developed or
improvements in all published guides
are encouraged at any time.
Electronic copies of Draft Regulatory
Guide DG–1173 are available through
the NRC’s public Web site under Draft
Regulatory Guides in the Regulatory
Guides document collection of the
NRC’s Electronic Reading Room at
https://www.nrc.gov/reading-rm/doccollections/. Electronic copies are also
available in ADAMS (https://
www.nrc.gov/reading-rm/adams.html),
under Accession #ML071070410.
In addition, regulatory guides are
available for inspection at the NRC’s
Public Document Room (PDR), which is
located at 11555 Rockville Pike,
Rockville, Maryland. The PDR’s mailing
address is USNRC PDR, Washington, DC
20555–0001. The PDR can also be
reached by telephone at (301) 415–4737
or (800) 397–4205, by fax at (301) 415–
3548, and by e-mail to PDR@nrc.gov.
Requests for single copies of draft or
final guides (which may be reproduced)
should be made in writing to the U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Reproduction and Distribution Services
Section; by e-mail to
DISTRIBUTION@nrc.gov; or by fax to
(301) 415–2289. Telephone requests
cannot be accommodated.
Regulatory guides are not
copyrighted, and Commission approval
is not required to reproduce them.
(5 U.S.C. 552(a))
Dated at Rockville, Maryland, this 20th day
of June, 2007.
For the U.S. Nuclear Regulatory
Commission.
Jimi T. Yerokun,
Chief,Risk Applications and Special Projects
Branch,Division of Risk Assessment and
Special Projects,Office of Nuclear Regulatory
Research.
[FR Doc. E7–12562 Filed 6–27–07; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Guidance for Electronic Submissions
to the NRC; Report Available for
Comment
Nuclear Regulatory
Commission.
ACTION: Announcement of issuance for
public comment, availability.
AGENCY:
E:\FR\FM\28JNN1.SGM
28JNN1
Agencies
[Federal Register Volume 72, Number 124 (Thursday, June 28, 2007)]
[Notices]
[Pages 35520-35521]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-12563]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Notice of Electronic Distribution Initiative Pilot Program
The Office of Nuclear Reactor Regulation (NRR) at the U.S. Nuclear
Regulatory Commission (NRC) is implementing a pilot program to test the
feasibility of its electronic distribution initiative (EDI). The EDI
seeks to provide a more effective and efficient method of communication
with internal and external stakeholders. The EDI is an alternative to
paper copy (hardcopy) distribution of correspondence and is replacing
hardcopy distribution with distribution via electronic mail (e-mail).
Currently, the NRR staff provides paper copies for reactor
licensing activities to the addressee and each entity on the carbon
copy list, otherwise known as the Service List. In the future, the NRR
staff intends to provide those on the Service List via e-mail an
electronic link to licensing documents which are available publicly in
the NRC's Agencywide Documents Access and Management System. The
addressees will continue to receive the official NRC hardcopy. The
distribution of documents containing safeguards, proprietary or
security-related information, or other information that is withheld
from public disclosure will not be affected by this initiative at the
present time.
The EDI pilot program will begin July 1 and end September 30, 2007.
Exelon Generation Company, LLC (Exelon), one of the NRC's licensees,
has agreed to participate in this pilot program. The Exelon plants
included are: Byron Station, Units 1 and 2; Braidwood Station, Units 1
and 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station,
Units 2 and 3; LaSalle County Station, Units 1 and 2; and Quad Cities
Nuclear Power Station, Units 1 and 2.
The NRR staff plan to expand the EDI to include all the operating
reactor licensees, with the goal for implementation to begin in January
2008.
Dated at Rockville, Maryland, this 21st day of June 2007.
[[Page 35521]]
For the Nuclear Regulatory Commission.
Russell A. Gibbs,
Chief, Plant Licensing Branch III-2, Division of Operating Reactor
Licensing. Office of Nuclear Reactor Regulation.
[FR Doc. E7-12563 Filed 6-27-07; 8:45 am]