Notice of Availability to Distribute a Final Environmental Impact Statement for the Construction of a New Border Station Facility in Derby Line, Vermont, 35467 [E7-12552]
Download as PDF
35467
Federal Register / Vol. 72, No. 124 / Thursday, June 28, 2007 / Notices
Segment-reach
08040205–904
08040205–905
08040205–907
11010012–003
11010012–008
11010012–010
11010012–011
11010012–014
11010012–015
11010012–016
11010009–902
11010014–004
11010014–006
11010014–007
11010014–008
11010014–009
11010014–010
11010014–012
11010014–027
11010014–028
11010014–038
Waterbody name
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
Pollutant
Jacks Bayou ...........................................................................................
Cross Bayou ...........................................................................................
Chemin-A-Haut Creek ............................................................................
Cooper Creek .........................................................................................
Strawberry River .....................................................................................
Little Strawberry River ............................................................................
Strawberry River .....................................................................................
Reeds Creek ...........................................................................................
Mill Creek ................................................................................................
Caney Creek ...........................................................................................
Data Creek .............................................................................................
Overflow Creek .......................................................................................
Overflow Creek .......................................................................................
Little Red River .......................................................................................
Little Red River .......................................................................................
Ten Mile Creek .......................................................................................
Little Red River .......................................................................................
Little Red River .......................................................................................
Middle Fork Little Red River ...................................................................
Middle Fork Little Red River ...................................................................
South Fork Little Red River ....................................................................
AGENCY:
to construct a new border station facility
which meets their needs, and the design
requirements of the GSA.
The existing facilities are undersized
and obsolete, and consequently
incapable of providing the level of
security now required. The Proposed
Action has been defined and includes:
(a) identification of land requirements,
including acquisition of adjoining land;
(b) demolition of existing government
structures at the border station; (c)
construction of a main administration
building and ancillary support
buildings; and (d) consequent potential
alterations to secondary roads.
Studied alternatives have identified
alternative locations for the components
of the border station including the main
administration and ancillary support
buildings, the associated roadway
network and parking. A No Action
alternative has also been studied and
evaluates the consequences of not
constructing the new border station
facility. This alternative has been
included to provide a basis for
comparison to the action alternatives
described above as required by NEPA
regulations (40 CFR 1002.14(d)).
DATES: July 30, 2007.
ACTION:
FOR FURTHER INFORMATION CONTACT
EPA requests that the public provide
to EPA any water quality related data
and information that may be relevant to
the calculations for these 52 TMDLs.
EPA will review all data and
information submitted during the public
comment period and revise the TMDLs
and determinations where appropriate.
EPA will then forward the TMDLs to the
Arkansas Department of Environmental
Quality (ADEQ). The ADEQ will
incorporate the TMDLs into its current
water quality management plan.
Dated: June 20, 2007.
Miguel I. Flores,
Director, Water Quality Protection Division,
EPA Region 6.
[FR Doc. E7–12576 Filed 6–27–07; 8:45 am]
BILLING CODE 6560–50–P
GENERAL SERVICES
ADMINISTRATION
[PBS-N01]
Notice of Availability to Distribute a
Final Environmental Impact Statement
for the Construction of a New Border
Station Facility in Derby Line, Vermont
Public Buildings Service, GSA.
Notice of Availability.
The General Services
Administration (GSA) announces its
intent to distribute a Final
Environmental Impact Statement (Final
EIS) under the National Environmental
Policy Act (NEPA) of 1969, as amended,
42 USC 4321-4347 (NEPA) to assess the
potential impacts of the construction of
a New Border Station Facility in Derby
Line, Vermont (the ‘‘Proposed Action’’).
At the request of Customs andBorder
Protection (CBP), the GSA is proposing
mstockstill on PROD1PC66 with NOTICES
SUMMARY:
VerDate Aug<31>2005
18:23 Jun 27, 2007
Jkt 211001
David M. Drevinsky P.E., PMP, Regional
Environmental Quality Advocate
(REQA), U.S. General Services
Administration, 10 Causeway Street,
Room 975, Boston, MA 02222. Fax:
(617) 565-5967. Phone: (617) 565–6596.
E-mail: david.drevinsky@gsa.gov.
DISTRIBUTION:
GSA will distribute ten reading copies
of the Final EIS at the Daily Memorial
Library, Goodrich Memorial Library and
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
Fecal
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
coliform
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
E.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
coli.
Haskell Free Library located on 101 Jr.
High Drive in Derby Line, 202 Main
Street in Newport and 96 Caswell
Avenue in Derby Line; respectively.
Dated: June 13, 2007.
Glenn C. Rotondo,
Assistant Regional Administrator, Public
Buildings Service, New England Region
[FR Doc. E7–12552 Filed 6–27–07; 8:45 am]
BILLING CODE 6820–A8–S
GENERAL SERVICES
ADMINISTRATION
Revised Notice of Intent to Prepare an
Environmental Impact Statement
General Services
Administration (GSA), National Capital
Region.
ACTION: Notice.
AGENCY:
SUMMARY: Pursuant to the requirements
of the National Environmental Policy
Act of 1969 (NEPA), 42 U.S.C. § 4321–
4347, the Council on Environmental
Quality Regulations (40 CFR parts 15001508), GSA Order PBS P 1095.1F
(Environmental considerations in
decision-making, dated October 19,
1999), and the GSA Public Buildings
Service NEPA Desk Guide, GSA is
revising its June 7, 2005, notice of intent
announcing the preparation of an
Environmental Impact Statement (EIS)
for the redevelopment of the St.
Elizabeths West Campus (St. Elizabeths)
in Southeast Washington, DC. The
initial notice of intent defined the
purpose of the proposed action as
‘‘develop[ing] secure office space in the
District of Columbia to accommodate
substantial Federal operations.’’ Since
that notice was issued, GSA has
E:\FR\FM\28JNN1.SGM
28JNN1
Agencies
[Federal Register Volume 72, Number 124 (Thursday, June 28, 2007)]
[Notices]
[Page 35467]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-12552]
=======================================================================
-----------------------------------------------------------------------
GENERAL SERVICES ADMINISTRATION
[PBS-N01]
Notice of Availability to Distribute a Final Environmental Impact
Statement for the Construction of a New Border Station Facility in
Derby Line, Vermont
AGENCY: Public Buildings Service, GSA.
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: The General Services Administration (GSA) announces its intent
to distribute a Final Environmental Impact Statement (Final EIS) under
the National Environmental Policy Act (NEPA) of 1969, as amended, 42
USC 4321-4347 (NEPA) to assess the potential impacts of the
construction of a New Border Station Facility in Derby Line, Vermont
(the ``Proposed Action''). At the request of Customs andBorder
Protection (CBP), the GSA is proposing to construct a new border
station facility which meets their needs, and the design requirements
of the GSA.
The existing facilities are undersized and obsolete, and
consequently incapable of providing the level of security now required.
The Proposed Action has been defined and includes: (a) identification
of land requirements, including acquisition of adjoining land; (b)
demolition of existing government structures at the border station; (c)
construction of a main administration building and ancillary support
buildings; and (d) consequent potential alterations to secondary roads.
Studied alternatives have identified alternative locations for the
components of the border station including the main administration and
ancillary support buildings, the associated roadway network and
parking. A No Action alternative has also been studied and evaluates
the consequences of not constructing the new border station facility.
This alternative has been included to provide a basis for comparison to
the action alternatives described above as required by NEPA regulations
(40 CFR 1002.14(d)).
DATES: July 30, 2007.
FOR FURTHER INFORMATION CONTACT David M. Drevinsky P.E., PMP, Regional
Environmental Quality Advocate (REQA), U.S. General Services
Administration, 10 Causeway Street, Room 975, Boston, MA 02222. Fax:
(617) 565-5967. Phone: (617) 565-6596. E-mail: david.drevinsky@gsa.gov.
DISTRIBUTION:
GSA will distribute ten reading copies of the Final EIS at the
Daily Memorial Library, Goodrich Memorial Library and Haskell Free
Library located on 101 Jr. High Drive in Derby Line, 202 Main Street in
Newport and 96 Caswell Avenue in Derby Line; respectively.
Dated: June 13, 2007.
Glenn C. Rotondo,
Assistant Regional Administrator, Public Buildings Service, New England
Region
[FR Doc. E7-12552 Filed 6-27-07; 8:45 am]
BILLING CODE 6820-A8-S