Notice of Availability to Distribute a Final Environmental Impact Statement for the Construction of a New Border Station Facility in Derby Line, Vermont, 35467 [E7-12552]

Download as PDF 35467 Federal Register / Vol. 72, No. 124 / Thursday, June 28, 2007 / Notices Segment-reach 08040205–904 08040205–905 08040205–907 11010012–003 11010012–008 11010012–010 11010012–011 11010012–014 11010012–015 11010012–016 11010009–902 11010014–004 11010014–006 11010014–007 11010014–008 11010014–009 11010014–010 11010014–012 11010014–027 11010014–028 11010014–038 Waterbody name ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... ............................... Pollutant Jacks Bayou ........................................................................................... Cross Bayou ........................................................................................... Chemin-A-Haut Creek ............................................................................ Cooper Creek ......................................................................................... Strawberry River ..................................................................................... Little Strawberry River ............................................................................ Strawberry River ..................................................................................... Reeds Creek ........................................................................................... Mill Creek ................................................................................................ Caney Creek ........................................................................................... Data Creek ............................................................................................. Overflow Creek ....................................................................................... Overflow Creek ....................................................................................... Little Red River ....................................................................................... Little Red River ....................................................................................... Ten Mile Creek ....................................................................................... Little Red River ....................................................................................... Little Red River ....................................................................................... Middle Fork Little Red River ................................................................... Middle Fork Little Red River ................................................................... South Fork Little Red River .................................................................... AGENCY: to construct a new border station facility which meets their needs, and the design requirements of the GSA. The existing facilities are undersized and obsolete, and consequently incapable of providing the level of security now required. The Proposed Action has been defined and includes: (a) identification of land requirements, including acquisition of adjoining land; (b) demolition of existing government structures at the border station; (c) construction of a main administration building and ancillary support buildings; and (d) consequent potential alterations to secondary roads. Studied alternatives have identified alternative locations for the components of the border station including the main administration and ancillary support buildings, the associated roadway network and parking. A No Action alternative has also been studied and evaluates the consequences of not constructing the new border station facility. This alternative has been included to provide a basis for comparison to the action alternatives described above as required by NEPA regulations (40 CFR 1002.14(d)). DATES: July 30, 2007. ACTION: FOR FURTHER INFORMATION CONTACT EPA requests that the public provide to EPA any water quality related data and information that may be relevant to the calculations for these 52 TMDLs. EPA will review all data and information submitted during the public comment period and revise the TMDLs and determinations where appropriate. EPA will then forward the TMDLs to the Arkansas Department of Environmental Quality (ADEQ). The ADEQ will incorporate the TMDLs into its current water quality management plan. Dated: June 20, 2007. Miguel I. Flores, Director, Water Quality Protection Division, EPA Region 6. [FR Doc. E7–12576 Filed 6–27–07; 8:45 am] BILLING CODE 6560–50–P GENERAL SERVICES ADMINISTRATION [PBS-N01] Notice of Availability to Distribute a Final Environmental Impact Statement for the Construction of a New Border Station Facility in Derby Line, Vermont Public Buildings Service, GSA. Notice of Availability. The General Services Administration (GSA) announces its intent to distribute a Final Environmental Impact Statement (Final EIS) under the National Environmental Policy Act (NEPA) of 1969, as amended, 42 USC 4321-4347 (NEPA) to assess the potential impacts of the construction of a New Border Station Facility in Derby Line, Vermont (the ‘‘Proposed Action’’). At the request of Customs andBorder Protection (CBP), the GSA is proposing mstockstill on PROD1PC66 with NOTICES SUMMARY: VerDate Aug<31>2005 18:23 Jun 27, 2007 Jkt 211001 David M. Drevinsky P.E., PMP, Regional Environmental Quality Advocate (REQA), U.S. General Services Administration, 10 Causeway Street, Room 975, Boston, MA 02222. Fax: (617) 565-5967. Phone: (617) 565–6596. E-mail: david.drevinsky@gsa.gov. DISTRIBUTION: GSA will distribute ten reading copies of the Final EIS at the Daily Memorial Library, Goodrich Memorial Library and PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal Fecal coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform coliform and and and and and and and and and and and and and and and and and and and and and E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. coli. Haskell Free Library located on 101 Jr. High Drive in Derby Line, 202 Main Street in Newport and 96 Caswell Avenue in Derby Line; respectively. Dated: June 13, 2007. Glenn C. Rotondo, Assistant Regional Administrator, Public Buildings Service, New England Region [FR Doc. E7–12552 Filed 6–27–07; 8:45 am] BILLING CODE 6820–A8–S GENERAL SERVICES ADMINISTRATION Revised Notice of Intent to Prepare an Environmental Impact Statement General Services Administration (GSA), National Capital Region. ACTION: Notice. AGENCY: SUMMARY: Pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C. § 4321– 4347, the Council on Environmental Quality Regulations (40 CFR parts 15001508), GSA Order PBS P 1095.1F (Environmental considerations in decision-making, dated October 19, 1999), and the GSA Public Buildings Service NEPA Desk Guide, GSA is revising its June 7, 2005, notice of intent announcing the preparation of an Environmental Impact Statement (EIS) for the redevelopment of the St. Elizabeths West Campus (St. Elizabeths) in Southeast Washington, DC. The initial notice of intent defined the purpose of the proposed action as ‘‘develop[ing] secure office space in the District of Columbia to accommodate substantial Federal operations.’’ Since that notice was issued, GSA has E:\FR\FM\28JNN1.SGM 28JNN1

Agencies

[Federal Register Volume 72, Number 124 (Thursday, June 28, 2007)]
[Notices]
[Page 35467]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-12552]


=======================================================================
-----------------------------------------------------------------------

GENERAL SERVICES ADMINISTRATION

[PBS-N01]


Notice of Availability to Distribute a Final Environmental Impact 
Statement for the Construction of a New Border Station Facility in 
Derby Line, Vermont

AGENCY: Public Buildings Service, GSA.

ACTION: Notice of Availability.

-----------------------------------------------------------------------

SUMMARY: The General Services Administration (GSA) announces its intent 
to distribute a Final Environmental Impact Statement (Final EIS) under 
the National Environmental Policy Act (NEPA) of 1969, as amended, 42 
USC 4321-4347 (NEPA) to assess the potential impacts of the 
construction of a New Border Station Facility in Derby Line, Vermont 
(the ``Proposed Action''). At the request of Customs andBorder 
Protection (CBP), the GSA is proposing to construct a new border 
station facility which meets their needs, and the design requirements 
of the GSA.
    The existing facilities are undersized and obsolete, and 
consequently incapable of providing the level of security now required. 
The Proposed Action has been defined and includes: (a) identification 
of land requirements, including acquisition of adjoining land; (b) 
demolition of existing government structures at the border station; (c) 
construction of a main administration building and ancillary support 
buildings; and (d) consequent potential alterations to secondary roads.
    Studied alternatives have identified alternative locations for the 
components of the border station including the main administration and 
ancillary support buildings, the associated roadway network and 
parking. A No Action alternative has also been studied and evaluates 
the consequences of not constructing the new border station facility. 
This alternative has been included to provide a basis for comparison to 
the action alternatives described above as required by NEPA regulations 
(40 CFR 1002.14(d)).

DATES: July 30, 2007.

FOR FURTHER INFORMATION CONTACT David M. Drevinsky P.E., PMP, Regional 
Environmental Quality Advocate (REQA), U.S. General Services 
Administration, 10 Causeway Street, Room 975, Boston, MA 02222. Fax: 
(617) 565-5967. Phone: (617) 565-6596. E-mail: david.drevinsky@gsa.gov.



DISTRIBUTION:

     GSA will distribute ten reading copies of the Final EIS at the 
Daily Memorial Library, Goodrich Memorial Library and Haskell Free 
Library located on 101 Jr. High Drive in Derby Line, 202 Main Street in 
Newport and 96 Caswell Avenue in Derby Line; respectively.

    Dated: June 13, 2007.
Glenn C. Rotondo,
Assistant Regional Administrator, Public Buildings Service, New England 
Region
[FR Doc. E7-12552 Filed 6-27-07; 8:45 am]
BILLING CODE 6820-A8-S
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.