Applegate Dam; Notice of Availability of Environmental Assessment, 34676 [E7-12191]
Download as PDF
34676
Federal Register / Vol. 72, No. 121 / Monday, June 25, 2007 / Notices
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 6, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–12184 Filed 6–22–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 11910–002 Oregon]
Applegate Dam; Notice of Availability
of Environmental Assessment
sroberts on PROD1PC70 with NOTICES
June 15, 2007.
In accordance with the National
Environmental Policy Act of 1969 and
Federal Energy Regulatory Commission
(Commission) regulations, 18 CFR Part
380 (Order No. 486, 52 FR 47897),
Office of Energy Projects staff have
reviewed Symbiotics, LLC’s application
for the proposed Applegate Dam Project
and prepared this environmental
assessment (EA). The proposed project
would be located at the existing U.S.
Army Corps of Engineers’ (Corps)
Applegate dam located at river mile 45.7
on the Applegate River, near the town
of Medford, in Jackson County, Oregon.
The proposed project facilities would
occupy 7.1 acres of federal land
administered by the Corps below and
VerDate Aug<31>2005
23:08 Jun 22, 2007
Jkt 211001
adjacent to the dam. In addition, the
project boundary would include 2.32
acres of National Forest System land
and 0.66 acre of U.S. Bureau of Land
Management land.
This EA contains the Commission
staff’s analysis of the potential future
environmental effects of the project.
Staff has concluded that licensing the
project, with appropriate environmental
protective measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov
or toll-free at (866) 208–3676, or for
TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice and
should be addressed to Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please affix ‘‘Applegate Dam Project No.
11910–002’’ to all comments. Comments
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-filing’’ link.
Please contact Tim Looney by
telephone at (202) 502–6096 or by email at Timothy.Looney@ferc.gov if you
have any questions.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–12191 Filed 6–22–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–9988–015]
Augusta Canal Authority; Notice of
Application Tendered for Filing With
the Commission, Soliciting Additional
Study Requests, and Establishing
Procedural Schedule for Relicensing
and Deadline for Submission of Final
Amendments
June 15, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New major
license.
b. Project No.: P–9988–015.
c. Date Filed: May 31, 2007.
d. Applicant: Augusta Canal
Authority.
e. Name of Project: King Mill
Hydroelectric Project.
f. Location: The King Mill Project is
located on the Augusta Canal about 6
miles downstream of the Augusta
Diversion Dam, adjacent to the
Savannah River, Richmond County,
Augusta, GA. The project does not affect
federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Dayton
Sherrouse, Executive Director, Augusta
Canal Authority, 1450 Green Street,
Suite 400, Augusta, GA 30901;
Telephone (706) 823–0440, Ext. 1.
i. FERC Contact: Sarah Florentino,
Telephone (202) 502–6863, or e-mail
sarah.florentino@ferc.gov. Additional
information on Federal Energy
Regulatory Commission (FERC)
hydroelectric projects is available on
FERC’s Web site: https://www.ferc.gov/
industries/hydropower.asp.
j. This application is not ready for
environmental analysis at this time.
k. Cooperating agencies: We are
asking Federal, State, local, and tribal
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to cooperate with
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions for filing
such requests described in item m
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
l. Pursuant to Section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
E:\FR\FM\25JNN1.SGM
25JNN1
Agencies
[Federal Register Volume 72, Number 121 (Monday, June 25, 2007)]
[Notices]
[Page 34676]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-12191]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 11910-002 Oregon]
Applegate Dam; Notice of Availability of Environmental
Assessment
June 15, 2007.
In accordance with the National Environmental Policy Act of 1969
and Federal Energy Regulatory Commission (Commission) regulations, 18
CFR Part 380 (Order No. 486, 52 FR 47897), Office of Energy Projects
staff have reviewed Symbiotics, LLC's application for the proposed
Applegate Dam Project and prepared this environmental assessment (EA).
The proposed project would be located at the existing U.S. Army Corps
of Engineers' (Corps) Applegate dam located at river mile 45.7 on the
Applegate River, near the town of Medford, in Jackson County, Oregon.
The proposed project facilities would occupy 7.1 acres of federal land
administered by the Corps below and adjacent to the dam. In addition,
the project boundary would include 2.32 acres of National Forest System
land and 0.66 acre of U.S. Bureau of Land Management land.
This EA contains the Commission staff's analysis of the potential
future environmental effects of the project. Staff has concluded that
licensing the project, with appropriate environmental protective
measures, would not constitute a major federal action that would
significantly affect the quality of the human environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY,
(202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Any comments should be filed within 30 days from the date of this
notice and should be addressed to Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. Please affix ``Applegate Dam Project No. 11910-002'' to all
comments. Comments may be filed electronically via the Internet in lieu
of paper. The Commission strongly encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-filing'' link.
Please contact Tim Looney by telephone at (202) 502-6096 or by e-
mail at Timothy.Looney@ferc.gov if you have any questions.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-12191 Filed 6-22-07; 8:45 am]
BILLING CODE 6717-01-P