Lea Power Partners, LLC; Notice of Issuance of Order, 32842 [E7-11465]
Download as PDF
32842
Federal Register / Vol. 72, No. 114 / Thursday, June 14, 2007 / Notices
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: June 28, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–11464 Filed 6–13–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER07–751–000]
Lea Power Partners, LLC; Notice of
Issuance of Order
jlentini on PROD1PC65 with NOTICES
June 7, 2007.
Lea Power Partners, LLC (Lea Power)
filed an application for market-based
rate authority, with an accompanying
rate schedule. The proposed marketbased rate schedule provides for the sale
of energy, capacity, and ancillary
services at market-based rates, the
reassignment of transmission capacity,
and the resale of firm transmissions
rights. Lea Power also requested waivers
of various Commission regulations. In
particular, Lea Power requested that the
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by Lea Power.
On June 5, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34 (Director’s Order). The Director’s
VerDate Aug<31>2005
17:22 Jun 13, 2007
Jkt 211001
Order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by Lea Power should file a
protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is July 6,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Lea Power is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of Lea
Power, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Lea Power’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–11465 Filed 6–13–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP07–467–000]
Natural Gas Pipeline Company of
America; Notice of Proposed Changes
in FERC Gas Tariff
June 4, 2007.
Take notice that on May 31, 2007,
Natural Gas Pipeline Company of
America (Natural) tendered for filing as
part of its FERC Gas Tariff, Sixth
Revised Volume No. 1, the following
tariff sheets, to become effective July 1,
2007:
Twelfth Revised Sheet No. 414.
Second Revised Sheet No. 414A.02.
First Revised Sheet No. 414A.03.
Natural states that copies of the filing
are being mailed to its customers and
interested state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
E:\FR\FM\14JNN1.SGM
14JNN1
Agencies
[Federal Register Volume 72, Number 114 (Thursday, June 14, 2007)]
[Notices]
[Page 32842]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-11465]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER07-751-000]
Lea Power Partners, LLC; Notice of Issuance of Order
June 7, 2007.
Lea Power Partners, LLC (Lea Power) filed an application for
market-based rate authority, with an accompanying rate schedule. The
proposed market-based rate schedule provides for the sale of energy,
capacity, and ancillary services at market-based rates, the
reassignment of transmission capacity, and the resale of firm
transmissions rights. Lea Power also requested waivers of various
Commission regulations. In particular, Lea Power requested that the
Commission grant blanket approval under 18 CFR part 34 of all future
issuances of securities and assumptions of liability by Lea Power.
On June 5, 2007, pursuant to delegated authority, the Director,
Division of Tariffs and Market Development--West, granted the requests
for blanket approval under part 34 (Director's Order). The Director's
Order also stated that the Commission would publish a separate notice
in the Federal Register establishing a period of time for the filing of
protests. Accordingly, any person desiring to be heard concerning the
blanket approvals of issuances of securities or assumptions of
liability by Lea Power should file a protest with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure. 18 CFR 385.211, 385.214 (2004).
Notice is hereby given that the deadline for filing protests is
July 6, 2007.
Absent a request to be heard in opposition to such blanket
approvals by the deadline above, Lea Power is authorized to issue
securities and assume obligations or liabilities as a guarantor,
indorser, surety, or otherwise in respect of any security of another
person; provided that such issuance or assumption is for some lawful
object within the corporate purposes of Lea Power, compatible with the
public interest, and is reasonably necessary or appropriate for such
purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approvals of Lea Power's issuance of securities or
assumptions of liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-11465 Filed 6-13-07; 8:45 am]
BILLING CODE 6717-01-P