Richard V. Williamson: Notice of Surrender of Preliminary Permit, 32846 [E7-11463]
Download as PDF
32846
Federal Register / Vol. 72, No. 114 / Thursday, June 14, 2007 / Notices
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on June 21, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–11457 Filed 6–13–07; 8:45 am]
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Lake Shannon Hydroelectric Company,
LLC; Notice of Surrender of
Preliminary Permit
[Project No. 2277]
AmerenUE; Notice of Availability of
Draft Environmental Assessment
June 7, 2007.
June 7, 2007.
jlentini on PROD1PC65 with NOTICES
BILLING CODE 6717–01–P
[Project No. 12677–002]
Federal Energy Regulatory
Commission
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission or FERC)
regulations contained in the Code of
Federal Regulations (CFR) (18 CFR part
380), the Office of Energy Projects staff
(staff) reviewed AmerenUE’s request to
rebuild the upper reservoir of the Taum
Sauk Pumped Storage Project (FERC No.
2277), located on the East Fork Black
River, in Reynolds County, Missouri,
and prepared a Draft Environmental
Assessment (DEA) for the construction
project. In this DEA, staff analyzes the
potential environmental effects of the
Proposed Action and concludes that the
proposal, with recommended mitigation
measures, would not constitute a major
federal action significantly affecting the
quality of the human environment.
A copy of the DEA is available for
review at the Commission in the Public
Reference Room, or it may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the e-Library link.
Enter the docket number (P–2277) in the
docket number field to access the
document. For assistance, call (202)
502–8222 or (202) 502–8659 (for TTY).
17:22 Jun 13, 2007
Kimberly D. Bose,
Secretary.
[FR Doc. E7–11460 Filed 6–13–07; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
VerDate Aug<31>2005
Any comments should be filed by,
July 9, 2007, and should be addressed
to Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Please reference
the Taum Sauk Project No. 2277, on all
comments. For further information on
this notice, please contact Thomas
LoVullo at (202) 502–8900.
Comments may be filed electronically
via the Internet in lieu of paper. See 18
CFR 385.2001 (a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the eFiling link. The Commission strongly
encourages electronic filing.
Jkt 211001
Take notice that Lake Shannon
Hydroelectric Company, LLC, permittee
for the proposed Scoggins Dam
Hydroelectric Project, has requested that
its preliminary permit be terminated.
The permit was issued on October 3,
2006, and would have expired on
September 30, 2009.1 The project would
have been located on Scoggins Creek in
Washington County, Oregon.
The permittee filed the request on
May 21, 2007, and the preliminary
permit for Project No. 12677 shall
remain in effect through the thirtieth
day after issuance of this notice unless
that day is a Saturday, Sunday, part-day
holiday that affects the Commission, or
legal holiday as described in section 18
CFR 385.2007, in which case the
effective date is the first business day
following that day. New applications
involving this project site, to the extent
provided for under 18 CFR part 4, may
be filed on the next business day.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–11462 Filed 6–13–07; 8:45 am]
BILLING CODE 6717–01–P
1 117
PO 00000
FERC ¶ 62,001.
Frm 00014
Fmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12659–002]
Richard V. Williamson: Notice of
Surrender of Preliminary Permit
June 7, 2007.
Take notice that Richard V.
Williamson, permittee for the proposed
Stony Creek Water Power Project, has
requested that its preliminary permit be
terminated. The permit was issued on
October 25, 2006, and would have
expired on September 30, 2009.1 The
project would have been located on
Stony Creek in Colusa County,
California.
The permittee filed the request on
May 23, 2007, and the preliminary
permit for Project No. 12659 shall
remain in effect through the thirtieth
day after issuance of this notice unless
that day is a Saturday, Sunday, part-day
holiday that affects the Commission, or
legal holiday as described in section 18
CFR 385.2007, in which case the
effective date is the first business day
following that day. New applications
involving this project site, to the extent
provided for under 18 CFR part 4, may
be filed on the next business day.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–11463 Filed 6–13–07; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[OECA–2007–0466; FRL–8327–5]
Agency Information Collection
Activities: Proposed Collection;
Comment Request; State Review
Framework; EPA ICR Number 2185.01
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that EPA is planning to submit a
proposed amendment to an existing
Information Collection Request (ICR),
number 2185.01, which is set to expire
on November 30, 2008, to the Office of
Management and Budget (OMB). This is
a request for a new collection. Before
submitting the ICR to OMB for review
and approval, EPA is soliciting
comments on specific aspects of the
1 117
Sfmt 4703
E:\FR\FM\14JNN1.SGM
FERC ¶ 62,068.
14JNN1
Agencies
[Federal Register Volume 72, Number 114 (Thursday, June 14, 2007)]
[Notices]
[Page 32846]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-11463]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12659-002]
Richard V. Williamson: Notice of Surrender of Preliminary Permit
June 7, 2007.
Take notice that Richard V. Williamson, permittee for the proposed
Stony Creek Water Power Project, has requested that its preliminary
permit be terminated. The permit was issued on October 25, 2006, and
would have expired on September 30, 2009.\1\ The project would have
been located on Stony Creek in Colusa County, California.
---------------------------------------------------------------------------
\1\ 117 FERC ] 62,068.
---------------------------------------------------------------------------
The permittee filed the request on May 23, 2007, and the
preliminary permit for Project No. 12659 shall remain in effect through
the thirtieth day after issuance of this notice unless that day is a
Saturday, Sunday, part-day holiday that affects the Commission, or
legal holiday as described in section 18 CFR 385.2007, in which case
the effective date is the first business day following that day. New
applications involving this project site, to the extent provided for
under 18 CFR part 4, may be filed on the next business day.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-11463 Filed 6-13-07; 8:45 am]
BILLING CODE 6717-01-P