Richard V. Williamson: Notice of Surrender of Preliminary Permit, 32846 [E7-11463]

Download as PDF 32846 Federal Register / Vol. 72, No. 114 / Thursday, June 14, 2007 / Notices Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on June 21, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–11457 Filed 6–13–07; 8:45 am] DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Lake Shannon Hydroelectric Company, LLC; Notice of Surrender of Preliminary Permit [Project No. 2277] AmerenUE; Notice of Availability of Draft Environmental Assessment June 7, 2007. June 7, 2007. jlentini on PROD1PC65 with NOTICES BILLING CODE 6717–01–P [Project No. 12677–002] Federal Energy Regulatory Commission In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission or FERC) regulations contained in the Code of Federal Regulations (CFR) (18 CFR part 380), the Office of Energy Projects staff (staff) reviewed AmerenUE’s request to rebuild the upper reservoir of the Taum Sauk Pumped Storage Project (FERC No. 2277), located on the East Fork Black River, in Reynolds County, Missouri, and prepared a Draft Environmental Assessment (DEA) for the construction project. In this DEA, staff analyzes the potential environmental effects of the Proposed Action and concludes that the proposal, with recommended mitigation measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the DEA is available for review at the Commission in the Public Reference Room, or it may be viewed on the Commission’s Web site at https:// www.ferc.gov using the e-Library link. Enter the docket number (P–2277) in the docket number field to access the document. For assistance, call (202) 502–8222 or (202) 502–8659 (for TTY). 17:22 Jun 13, 2007 Kimberly D. Bose, Secretary. [FR Doc. E7–11460 Filed 6–13–07; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P VerDate Aug<31>2005 Any comments should be filed by, July 9, 2007, and should be addressed to Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please reference the Taum Sauk Project No. 2277, on all comments. For further information on this notice, please contact Thomas LoVullo at (202) 502–8900. Comments may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the eFiling link. The Commission strongly encourages electronic filing. Jkt 211001 Take notice that Lake Shannon Hydroelectric Company, LLC, permittee for the proposed Scoggins Dam Hydroelectric Project, has requested that its preliminary permit be terminated. The permit was issued on October 3, 2006, and would have expired on September 30, 2009.1 The project would have been located on Scoggins Creek in Washington County, Oregon. The permittee filed the request on May 21, 2007, and the preliminary permit for Project No. 12677 shall remain in effect through the thirtieth day after issuance of this notice unless that day is a Saturday, Sunday, part-day holiday that affects the Commission, or legal holiday as described in section 18 CFR 385.2007, in which case the effective date is the first business day following that day. New applications involving this project site, to the extent provided for under 18 CFR part 4, may be filed on the next business day. Kimberly D. Bose, Secretary. [FR Doc. E7–11462 Filed 6–13–07; 8:45 am] BILLING CODE 6717–01–P 1 117 PO 00000 FERC ¶ 62,001. Frm 00014 Fmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12659–002] Richard V. Williamson: Notice of Surrender of Preliminary Permit June 7, 2007. Take notice that Richard V. Williamson, permittee for the proposed Stony Creek Water Power Project, has requested that its preliminary permit be terminated. The permit was issued on October 25, 2006, and would have expired on September 30, 2009.1 The project would have been located on Stony Creek in Colusa County, California. The permittee filed the request on May 23, 2007, and the preliminary permit for Project No. 12659 shall remain in effect through the thirtieth day after issuance of this notice unless that day is a Saturday, Sunday, part-day holiday that affects the Commission, or legal holiday as described in section 18 CFR 385.2007, in which case the effective date is the first business day following that day. New applications involving this project site, to the extent provided for under 18 CFR part 4, may be filed on the next business day. Kimberly D. Bose, Secretary. [FR Doc. E7–11463 Filed 6–13–07; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [OECA–2007–0466; FRL–8327–5] Agency Information Collection Activities: Proposed Collection; Comment Request; State Review Framework; EPA ICR Number 2185.01 Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: In compliance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), this document announces that EPA is planning to submit a proposed amendment to an existing Information Collection Request (ICR), number 2185.01, which is set to expire on November 30, 2008, to the Office of Management and Budget (OMB). This is a request for a new collection. Before submitting the ICR to OMB for review and approval, EPA is soliciting comments on specific aspects of the 1 117 Sfmt 4703 E:\FR\FM\14JNN1.SGM FERC ¶ 62,068. 14JNN1

Agencies

[Federal Register Volume 72, Number 114 (Thursday, June 14, 2007)]
[Notices]
[Page 32846]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-11463]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12659-002]


Richard V. Williamson: Notice of Surrender of Preliminary Permit

June 7, 2007.
    Take notice that Richard V. Williamson, permittee for the proposed 
Stony Creek Water Power Project, has requested that its preliminary 
permit be terminated. The permit was issued on October 25, 2006, and 
would have expired on September 30, 2009.\1\ The project would have 
been located on Stony Creek in Colusa County, California.
---------------------------------------------------------------------------

    \1\ 117 FERC ] 62,068.
---------------------------------------------------------------------------

    The permittee filed the request on May 23, 2007, and the 
preliminary permit for Project No. 12659 shall remain in effect through 
the thirtieth day after issuance of this notice unless that day is a 
Saturday, Sunday, part-day holiday that affects the Commission, or 
legal holiday as described in section 18 CFR 385.2007, in which case 
the effective date is the first business day following that day. New 
applications involving this project site, to the extent provided for 
under 18 CFR part 4, may be filed on the next business day.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-11463 Filed 6-13-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.