TXU Generation Company LP Comanche Peak Steam Electric Station, Units 1 and 2; Notice of Consideration of Approval of Application Regarding Proposed Indirect Transfer of Control of Facility Operating Licenses and Conforming License Amendments, and Opportunity for a Hearing, 32685-32686 [07-2929]
Download as PDF
Federal Register / Vol. 72, No. 113 / Wednesday, June 13, 2007 / Notices
Collection of such items, in addition to
those known from the east side of the
Antarctic Peninsula, would be major
contributions to the Antarctic record of
vertebrate evolution. Rock samples
would also be collected for stable
isotopes of oxygen, carbon, and
hydrogen to shed light on late Mesozoic
climatic conditions in the area of the
South Shetlands and to improve
correlations with other areas.
Byers Peninsula (ASPA #126),
Livingston Island.
not produce antifreeze glycoproteins
that would enable them to survive in
Antarctic waters.) The Black cod will be
fed nototheniid fish muscle
supplemented with antifreeze
glycoproteins. Periodic blood samples
will be taken to ascertain whether
antifreeze glycoproteins are being
transported from the intestinal fluid into
the bloodstream. Upon completion of
the experiments the fish will be
sacrificed, their tissues and blood
collected, and they will be preserved in
formalin and sent to the fish collection
at the University of Illinois.
Dates
Location
Location
November 24, 2007 to December 31,
2007.
2. Applicant, Permit Application No.
2008–003
Activity for Which Permit Is Requested
Enter an Antarctic Specially Protected
Area (ASPA). The applicant proposes to
enter Cape Evans (ASPA #155) for the
purpose of photography. The applicant
is a participant in the U.S. Antarctic
Program’s Artists and Writers Program
who will film an overall ‘‘Year on Ice’’
time-lapse photography project, which
will document the Antarctic
environment, landscapes, living
conditions, and researchers at work
through an Antarctic year. Photography
of the historic hut at Cape Evans would
be part of this project. Depending on the
weather patterns at the time, it may also
give an indication of erosion patterns
affecting the site, which could be of
great use to conservators.
Location
Historic Hut at Cape Evans (ASPA
#155).
Dates
November 1, 2007 to December 10,
2007.
3. Applicant, Permit Application No.
2008–004
Arthur L. DeVries, Department of
Animal Biology, 524 Burrill Hall,
University of Illinois, Urbana, IL 61801.
sroberts on PROD1PC70 with NOTICES
Activity for Which Permit Is Requested
Introduce non-indigenous species into
Antarctica. The applicant proposes to
use 15 New Zealand black cod
(Notothenia angustata) in experiments
to determine whether antifreeze
glycoproteins are absorbed from the
intestinal tract into the blood stream.
(These fish are related to the
Trematomus fishes in Antarctica but do
18:30 Jun 12, 2007
Jkt 211001
Dates
September 25, 2007 to January 31,
2008.
Anthony Powell, 32742 Alipaz #94,
San Juan Capistrano, CA 92675.
VerDate Aug<31>2005
McMurdo Station seawater aquarium.
4. Applicant, Permit Application No.
2008–005
Rachael Morgan-Kiss, Delaware
Biotechnology Institute, 15 Innovation
Way, Newark, DE 19711.
Activity for Which Permit Is Requested
Introduce non-indigenous species into
Antarctica. The applicant proposes to
bring 10g cell pellets of green algae
(Chlamydomonas raudensis), originally
collected from Antarctica, for use in
experiments to link their understanding
of physiological responses in this
organism in a laboratory setting with
photosynthetic adaptation during the
transition between summer and winter
in its natural environment. The algal
pellets will be used to grow algae
cultures which will be transferred to
dialysis tubing at the Lake Bonney
laboratory. The dialysis chambers will
be suspended in the Lake Bonney water
column. Once the samples are collected
they will be extracted at the Bonney
Lake Lab or at Crary Lab at McMurdo
Station, resulting in the death of all
cells. The cells will be processed in a
variety of ways for different analyses
back in the U.S. Any remaining viable
cultures will be autoclaved to ensure
100% mortality of unused cultures.
Location
Lake Bonney field camp, Taylor
Valley, and Crary Laboratory at
McMurdo Station.
Dates
February 25, 2008 to April 10, 2008.
Nadene G. Kennedy,
Permit Officer, Office of Polar Programs.
[FR Doc. E7–11341 Filed 6–12–07; 8:45 am]
BILLING CODE 7555–01–P
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
32685
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–445 and 50–446]
TXU Generation Company LP
Comanche Peak Steam Electric
Station, Units 1 and 2; Notice of
Consideration of Approval of
Application Regarding Proposed
Indirect Transfer of Control of Facility
Operating Licenses and Conforming
License Amendments, and Opportunity
for a Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering the issuance of an order
under 10 CFR 50.80 approving the
indirect transfer of the Facility
Operating Licenses numbered NPF–87
and NPF–89, for the Comanche Peak
Steam Electric Station, Units 1 and 2
(CPSES) currently held by TXU
Generation Company LP, as owner and
licensed operator of CPSES. The
Commission is also considering
amending the licenses for
administrative purposes to reflect a
proposed name change.
According to an application for
approval filed by TXU Generation
Company LP, acting on behalf of itself
and Texas Energy Future Holdings
Limited Partnership (Texas Energy LP),
the applicants are requesting consent to
indirect transfer of control of TXU
Generation Company LP’s operating
licences for CPSES, in connection with
the acquisition of TXU Corporation by
Texas Energy LP. TXU Corporation is
the indirect owner of TXU Generation
Company LP.
No physical changes to the CPSES
facility or operational changes are being
proposed in the application.
In connection with the indirect
change of control, and the plans of
Texas Energy LP to clarify the
distinctions between TXU Corporation’s
state-regulated transmission and
distribution business and its other
businesses, TXU Generation Company
LP will be converted to a limited
liability company and renamed
Luminant Generation Company LLC.
Therefore, TXU Generation Company LP
has requested proposed conforming
amendments to Facility Operating
License Nos. NPF–87 and NPF–89 that
would replace references to TXU
Generation Company LP in the license
with references to Luminant Generation
Company LLC.
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
E:\FR\FM\13JNN1.SGM
13JNN1
sroberts on PROD1PC70 with NOTICES
32686
Federal Register / Vol. 72, No. 113 / Wednesday, June 13, 2007 / Notices
Commission will approve an
application for the indirect transfer of a
license, if the Commission determines
that the proposed acquisition will not
affect the qualifications of the licensee
to hold the license, and that the transfer
is otherwise consistent with applicable
provisions of law, regulations, and
orders issued by the Commission
pursuant thereto.
Before issuance of the proposed
conforming license amendments, the
Commission will have made findings
required by the Atomic Energy Act of
1954, as amended (the Act), and the
Commission’s regulations.
As provided in 10 CFR 2.1315, unless
otherwise determined by the
Commission with regard to a specific
application, the Commission has
determined that any amendment to the
license of a utilization facility which
does no more than conform the license
to reflect the transfer action involves no
significant hazards consideration. No
contrary determination has been made
with respect to this specific license
amendment application. In light of the
generic determination reflected in 10
CFR 2.1315, no public comments with
respect to significant hazards
considerations are being solicited,
notwithstanding the general comment
procedures contained in 10 CFR 50.91.
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days from the date of
publication of this notice, any person
whose interest may be affected by the
Commission’s action on the application
may request a hearing and, if not the
applicant, may petition for leave to
intervene in a hearing proceeding on the
Commission’s action. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in Subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR Part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
VerDate Aug<31>2005
19:19 Jun 12, 2007
Jkt 211001
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i)–(viii).
Requests for a hearing and petitions
for leave to intervene should be served
upon counsel for TXU Generation
Company LP, Mr. Timothy Matthews at
Morgan, Lewis & Bockius, LLP, 1111
Pennsylvania Avenue, NW.,
Washington, DC 20004 (tel: 202–739–
5527, fax: 202–793–3001, e-mail:
tmatthews@morganlewis.com), and
counsel for Texas Energy LP, Dr.
Richard A. Meserve at Covington &
Burling LLP, 1201 Pennsylvania Ave.
NW., Washington, DC 20004 (tel: 202–
662–5304, fax: 202–662–5304, fax: 202–
778–5304, e-mail: rmeserve@cov.com);
the General Counsel, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001 (e-mail address for
filings regarding license transfer cases
only: OGCLT@NRC.gov); and the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff, in
accordance with 10 CFR 2.302 and
2.305.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice.
For further details with respect to this
action, see the application dated April
18, 2007, available for public inspection
at the Commission’s Public Document
Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the Agencywide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, or 301–415–4737 or by e-mail
to pdr@nrc.gov.
Dated at Rockville, Maryland this 7th day
of June, 2007.
For the Nuclear Regulatory Commission.
Mohan C. Thadani,
Senior Project Manager, Plant Licensing
Branch IV, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 07–2929 Filed 6–12–07; 8:45 am]
BILLING CODE 7590–01–P
PRESIDENT’S COUNCIL ON
INTEGRITY AND EFFICIENCY
Senior Executive Service Performance
Review Board Membership
Office of Inspector General,
Department of the Interior.
ACTION: Notice; corrections.
AGENCY:
SUMMARY: The Office of Inspector
General, Department of the Interior,
published a document in the Federal
Register of December 5, 2006,
concerning the membership of the
Senior Executive Service Performance
Review Board for the President’s
Council on Integrity and Efficiency. The
document should also have included
the Executive Council on Integrity and
Efficiency.
FOR FURTHER INFORMATION CONTACT: Eric
M. Lippold, 703–487–5371 Corrections.
In the Federal Register of December 5,
2006, in FR Doc. E6–20548, on page
70570, in the third column, correct the
‘‘Heading’’ caption to read:
PRESIDENT’S COUNCIL ON INTEGRITY
AND EFFICIENCY EXECUTIVE COUNCIL
ON INTEGRITY AND EFFICIENCY.
In the Federal Register of December 5,
2006, in FR Doc. E6–20548, on page
70570, in the third column, correct the
‘‘Summary’’ caption to read:
This notice sets forth the names
and titles of the current membership of the
President’s Council on Integrity and
Efficiency (PCIE) and Executive Council on
Integrity and Efficiency (ECIE) Performance
Review Board as of October 2, 2006.
SUMMARY:
In the Federal Register of December 5,
2006, in FR Doc. E6–20548, on page
70570, in the third column, correct the
‘‘Supplementary Information’’ caption
to read:
I. Background
The Inspector General Act of 1978, as
amended, created the Offices of Inspectors
E:\FR\FM\13JNN1.SGM
13JNN1
Agencies
[Federal Register Volume 72, Number 113 (Wednesday, June 13, 2007)]
[Notices]
[Pages 32685-32686]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 07-2929]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-445 and 50-446]
TXU Generation Company LP Comanche Peak Steam Electric Station,
Units 1 and 2; Notice of Consideration of Approval of Application
Regarding Proposed Indirect Transfer of Control of Facility Operating
Licenses and Conforming License Amendments, and Opportunity for a
Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering the issuance of an order under 10 CFR 50.80 approving the
indirect transfer of the Facility Operating Licenses numbered NPF-87
and NPF-89, for the Comanche Peak Steam Electric Station, Units 1 and 2
(CPSES) currently held by TXU Generation Company LP, as owner and
licensed operator of CPSES. The Commission is also considering amending
the licenses for administrative purposes to reflect a proposed name
change.
According to an application for approval filed by TXU Generation
Company LP, acting on behalf of itself and Texas Energy Future Holdings
Limited Partnership (Texas Energy LP), the applicants are requesting
consent to indirect transfer of control of TXU Generation Company LP's
operating licences for CPSES, in connection with the acquisition of TXU
Corporation by Texas Energy LP. TXU Corporation is the indirect owner
of TXU Generation Company LP.
No physical changes to the CPSES facility or operational changes
are being proposed in the application.
In connection with the indirect change of control, and the plans of
Texas Energy LP to clarify the distinctions between TXU Corporation's
state-regulated transmission and distribution business and its other
businesses, TXU Generation Company LP will be converted to a limited
liability company and renamed Luminant Generation Company LLC.
Therefore, TXU Generation Company LP has requested proposed conforming
amendments to Facility Operating License Nos. NPF-87 and NPF-89 that
would replace references to TXU Generation Company LP in the license
with references to Luminant Generation Company LLC.
Pursuant to 10 CFR 50.80, no license, or any right thereunder,
shall be transferred, directly or indirectly, through transfer of
control of the license, unless the Commission shall give its consent in
writing. The
[[Page 32686]]
Commission will approve an application for the indirect transfer of a
license, if the Commission determines that the proposed acquisition
will not affect the qualifications of the licensee to hold the license,
and that the transfer is otherwise consistent with applicable
provisions of law, regulations, and orders issued by the Commission
pursuant thereto.
Before issuance of the proposed conforming license amendments, the
Commission will have made findings required by the Atomic Energy Act of
1954, as amended (the Act), and the Commission's regulations.
As provided in 10 CFR 2.1315, unless otherwise determined by the
Commission with regard to a specific application, the Commission has
determined that any amendment to the license of a utilization facility
which does no more than conform the license to reflect the transfer
action involves no significant hazards consideration. No contrary
determination has been made with respect to this specific license
amendment application. In light of the generic determination reflected
in 10 CFR 2.1315, no public comments with respect to significant
hazards considerations are being solicited, notwithstanding the general
comment procedures contained in 10 CFR 50.91.
The filing of requests for hearing and petitions for leave to
intervene, and written comments with regard to the license transfer
application, are discussed below.
Within 20 days from the date of publication of this notice, any
person whose interest may be affected by the Commission's action on the
application may request a hearing and, if not the applicant, may
petition for leave to intervene in a hearing proceeding on the
Commission's action. Requests for a hearing and petitions for leave to
intervene should be filed in accordance with the Commission's rules of
practice set forth in Subpart C ``Rules of General Applicability:
Hearing Requests, Petitions to Intervene, Availability of Documents,
Selection of Specific Hearing Procedures, Presiding Officer Powers, and
General Hearing Management for NRC Adjudicatory Hearings,'' of 10 CFR
Part 2. In particular, such requests and petitions must comply with the
requirements set forth in 10 CFR 2.309. Untimely requests and petitions
may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for
failure to file on time is established. In addition, an untimely
request or petition should address the factors that the Commission will
also consider, in reviewing untimely requests or petitions, set forth
in 10 CFR 2.309(c)(1)(i)-(viii).
Requests for a hearing and petitions for leave to intervene should
be served upon counsel for TXU Generation Company LP, Mr. Timothy
Matthews at Morgan, Lewis & Bockius, LLP, 1111 Pennsylvania Avenue,
NW., Washington, DC 20004 (tel: 202-739-5527, fax: 202-793-3001, e-
mail: tmatthews@morganlewis.com), and counsel for Texas Energy LP, Dr.
Richard A. Meserve at Covington & Burling LLP, 1201 Pennsylvania Ave.
NW., Washington, DC 20004 (tel: 202-662-5304, fax: 202-662-5304, fax:
202-778-5304, e-mail: rmeserve@cov.com); the General Counsel, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001 (e-mail
address for filings regarding license transfer cases only:
OGCLT@NRC.gov); and the Secretary of the Commission, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemakings and Adjudications Staff, in accordance with 10 CFR 2.302
and 2.305.
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
As an alternative to requests for hearing and petitions to
intervene, within 30 days from the date of publication of this notice,
persons may submit written comments regarding the license transfer
application, as provided for in 10 CFR 2.1305. The Commission will
consider and, if appropriate, respond to these comments, but such
comments will not otherwise constitute part of the decisional record.
Comments should be submitted to the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and should cite the publication date and page
number of this Federal Register notice.
For further details with respect to this action, see the
application dated April 18, 2007, available for public inspection at
the Commission's Public Document Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available records will be accessible
electronically from the Agencywide Documents Access and Management
System's (ADAMS) Public Electronic Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/reading-rm/adams.html. Persons who do
not have access to ADAMS or who encounter problems in accessing the
documents located in ADAMS should contact the NRC PDR Reference staff
by telephone at 1-800-397-4209, or 301-415-4737 or by e-mail to
pdr@nrc.gov.
Dated at Rockville, Maryland this 7th day of June, 2007.
For the Nuclear Regulatory Commission.
Mohan C. Thadani,
Senior Project Manager, Plant Licensing Branch IV, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 07-2929 Filed 6-12-07; 8:45 am]
BILLING CODE 7590-01-P