Drawbridge Operation Regulations; Long Island, New York Waterway From East Rockaway Inlet to Shinnecock Canal, Hempstead, NY, 32004-32005 [E7-11178]
Download as PDF
32004
Federal Register / Vol. 72, No. 111 / Monday, June 11, 2007 / Rules and Regulations
United States-Singapore Free Trade
Agreement (SFTA), including a SFTA
importer’s supporting statement if
previously required by the port director.
*
*
*
*
*
■ 11. The Appendix to Part 163 is
amended by adding two new listings
under section IV in numerical order to
read as follows:
Appendix to Part 163—Interim (a)(1)(A)
List.
*
*
*
*
§ 10.512 SFTA records that the importer
may have in support of a SFTA claim for
preferential tariff treatment, including an
importer’s supporting statement if previously
required by the port director.
10.522 SFTA TPL Certificate of
eligibility.
*
*
*
*
*
Authority: 5 U.S.C. 301; 19 U.S.C. 1624; 44
U.S.C. 3501 et seq.
13. Section 178.2 is amended by
adding new listings for §§ 10.510 and
10.511 to the table in numerical order to
read as follows:
■
§ 178.2
PART 178—APPROVAL OF
INFORMATION COLLECTION
REQUIREMENTS
Listing of OMB control numbers.
12. The authority citation for part 178
continues to read as follows:
■
*
IV. * * *
OMB control
No.
19 CFR section
Description
*
*
§§ 10.510 and 10.511 ...............................
*
*
*
*
Claim for preferential tariff treatment under the US-Singapore Free Trade Agreement.
*
*
*
*
*
*
*
*
Deborah J. Spero,
Acting Commissioner, U.S. Customs and
Border Protection.
Approved: June 1, 2007.
Timothy E. Skud,
Deputy Assistant Secretary of the Treasury.
[FR Doc. E7–11078 Filed 6–8–07; 8:45 am]
BILLING CODE 9111–14–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–07–044]
Drawbridge Operation Regulations;
Long Island, New York Waterway From
East Rockaway Inlet to Shinnecock
Canal, Hempstead, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations; request for comments.
AGENCY:
rmajette on DSK8KYBLC1PROD with MISCELLANEOUS
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Meadowbrook State
Parkway Bridge across Sloop Channel at
mile 12.8, at Hempstead, New York.
This deviation will test a change to the
drawbridge operation schedule to
determine whether a permanent change
to the schedule is needed. This
deviation will allow the bridge to open
on signal if at least a half-hour notice is
given to the New York State Department
of Transportation, except that, from 7
VerDate Mar<15>2010
12:20 Mar 07, 2011
Jkt 223001
*
*
a.m. to 8 p.m. on Saturdays, Sundays,
and Federal holidays, the draw shall
open every hour, on the hour, if at least
a half-hour notice is given. In addition,
the bridge need not open from 9:30 p.m.
to midnight on June 30, 2007 and the
rain date July 1, 2007, if needed, and
from 9 p.m. to 11 p.m. on July 4, 2007,
for the annual fireworks displays.
DATES: This deviation is effective from
June 25, 2007 through November 30,
2007. Comments must reach the Coast
Guard on or before December 15, 2007.
ADDRESSES: You may mail comments
and related material to Commander
(dpb), First Coast Guard District Bridge
Branch, One South Street, Battery Park
Building, New York, New York, 10004,
or deliver them to the same address
between 7 a.m. and 3 p.m., Monday
through Friday, except Federal holidays.
The First Coast Guard District, Bridge
Branch, maintains the public docket for
this deviation. Comments and material
received from the public, as well as
documents indicated in this notice as
being available in the docket, will
become part of this docket and will be
available for inspection or copying at
the First Coast Guard District, Bridge
Branch, 7 a.m. to 3 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7195.
SUPPLEMENTARY INFORMATION:
Request for Comments
We encourage you to participate in
evaluating this test schedule by
submitting comments or related
material. If you do so, please include
your name and address, identify the
PO 00000
Frm 00036
Fmt 4700
Sfmt 4700
*
*
1651–0117
*
docket number for this deviation
(CGD01–07–044), indicate the specific
section of this document to which each
comment applies, and give the reason
for each comment. Please submit all
comments and related material in an
unbound format, no larger than 81⁄2 by
11 inches, suitable for copying. If you
would like to know if they reached us,
please enclose a stamped, self-addressed
postcard or envelope. We will consider
all comments and material received
during the comment period. Comments
must be received by December 15, 2007.
Background and Purpose
The Meadowbrook State Parkway
Bridge has a vertical clearance in the
closed position of 22 feet at mean high
water and 25 feet at mean low water.
The existing drawbridge operation
regulations are listed at 33 CFR
117.799(h).
New York State Department of
Transportation requested a temporary
deviation from the drawbridge operation
regulations to test an alternate
drawbridge operation schedule to help
better balance the needs between
vehicular land traffic and marine vessel
traffic.
Under this temporary deviation, in
effect from June 25, 2007 through
November 30, 2007, the Meadowbrook
State Parkway Bridge across Sloop
Channel at mile 12.8, shall operate as
follows:
The bridge shall open on signal if at
least a half-hour notice is given to the
New York State Department of
Transportation at (631) 578–5903,
except that, from 7 a.m. to 8 p.m. on
Saturdays, Sundays, and Federal
E:\ERIC\11JNR1.SGM
11JNR1
Federal Register / Vol. 72, No. 111 / Monday, June 11, 2007 / Rules and Regulations
holidays, the draw shall open on signal,
every hour on the hour, if at least a halfhour notice is given. In addition, the
bridge need not open from 9:30 p.m. to
midnight on June 30, 2007 and the rain
date July 1, 2007, and from 9 p.m. to 11
p.m. on July 4, 2007, for the annual
fireworks display.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: June 1, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E7–11178 Filed 6–8–07; 8:45 am]
BILLING CODE 4910–15–P
Request for Comments
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–07–046]
Drawbridge Operation Regulations;
Long Island, New York Inland
Waterway from East Rockaway Inlet to
Shinnecock Canal, Jones Beach, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations; request for comments.
AGENCY:
rmajette on DSK8KYBLC1PROD with MISCELLANEOUS
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Wantagh State
Parkway Bridge, across Goose Creek, at
mile 16.1, at Jones Beach, New York.
This deviation will test a change to the
drawbridge operation schedule to
determine whether a permanent change
to the schedule is needed. This
deviation will allow the bridge to open
on signal if at least a half-hour notice is
given to the New York State Department
of Transportation, except that, from 7:30
a.m. to 8:30 p.m. on Saturdays,
Sundays, and Federal holidays, the
draw shall be opened every hour on the
half-hour after at least a half-hour notice
is given. The bridge need not open from
9 p.m. to 11 p.m. on the Fourth of July
for fireworks display.
DATES: This deviation is effective from
June 25, 2007 through November 30,
2007. Comments must reach the Coast
Guard on or before December 15, 2007.
ADDRESSES: You may mail comments
and related material to Commander
(dpb), First Coast Guard District Bridge
Branch, One South Street, Battery Park
VerDate Mar<15>2010
12:20 Mar 07, 2011
Building, New York, New York, 10004,
or deliver them to the same address
between 7 a.m. and 3 p.m., Monday
through Friday, except, Federal
holidays. The First Coast Guard District,
Bridge Branch, maintains the public
docket for this deviation. Comments and
material received from the public, as
well as documents indicated in this
notice as being available in the docket,
will become part of this docket and will
be available for inspection or copying at
the First Coast Guard District, Bridge
Branch, 7 a.m. to 3 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7195.
SUPPLEMENTARY INFORMATION:
Jkt 223001
We encourage you to participate in
evaluating this test schedule by
submitting comments or related
material. If you do so, please include
your name and address, identify the
docket number for this deviation
(CGD01–07–046), indicate the specific
section of this document to which each
comment applies, and give the reason
for each comment. Please submit all
comments and related material in an
unbound format, no larger than 81⁄2 by
11 inches, suitable for copying. If you
would like to know if they reached us,
please enclose a stamped, self-addressed
postcard or envelope. We will consider
all comments and material received
during the comment period. Comments
must be received by December 15, 2007.
Background and Purpose
The Wantagh State Parkway Bridge
has a vertical clearance in the closed
position of 16 feet at mean high water
and 19 feet at mean low water. The
existing drawbridge operation
regulations are listed at 33 CFR
117.799(i).
New York State Department of
Transportation requested a temporary
deviation from the drawbridge operation
regulations to test an alternate
drawbridge operation schedule to help
better balance the needs between
vehicular land traffic and marine vessel
traffic.
Under this temporary deviation, in
effect from June 25, 2007 through
November 30, 2007, the Wantagh State
Parkway Bridge at mile 16.1, across
Goose Creek, shall operate as follows:
The bridge shall open on signal if at
least a half-hour notice is given to the
New York State Department of
Transportation at (516) 242–2637,
except that, from 7:30 a.m. to 8:30 p.m.
on Saturdays, Sundays, and Federal
PO 00000
Frm 00037
Fmt 4700
Sfmt 4700
32005
holidays, the draw shall open on signal
once an hour on the half-hour provided
at least a half-hour notice is given. The
draw need not open for the passage of
vessel traffic from 9 p.m. through 11
p.m. on July 4, 2007.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: June 1, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E7–11180 Filed 6–8–07; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–07–045]
Drawbridge Operation Regulations;
Long Island, New York Inland
Waterway From East Rockaway Inlet to
Shinnecock Canal, Jones Beach, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations; request for comments.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Loop Parkway
Bridge, across Long Creek at mile 0.7, at
Jones Beach, New York. This deviation
will test a change to the drawbridge
operation schedule to determine
whether a permanent change to the
schedule is needed. This deviation will
allow the bridge to open on signal for
all marine traffic, Monday through
Friday twice an hour at twenty and fifty
minutes after the hour, from 6:20 a.m.
to 7:20 p.m., except that, between 9:50
a.m. and 3:20 p.m., the bridge shall
open on signal for all commercial
vessels. On Saturday, Sunday, and
Federal Holidays, the bridge shall open
on signal twice an hour, at twenty
minutes and fifty minutes after the hour,
between 7:20 a.m. and 8:20 p.m., except
that, the bridge shall open on signal for
all commercial vessels. Additionally,
the bridge need not open during the
annual fireworks display from 9:30 p.m.
to midnight on June 30, 2007 and the
rain date July 1, 2007, if needed. At all
other times the bridge shall open on
signal for all vessel traffic.
DATES: This deviation is effective from
June 25, 2007 through November 30,
E:\ERIC\11JNR1.SGM
11JNR1
Agencies
[Federal Register Volume 72, Number 111 (Monday, June 11, 2007)]
[Rules and Regulations]
[Pages 32004-32005]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-11178]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-07-044]
Drawbridge Operation Regulations; Long Island, New York Waterway
From East Rockaway Inlet to Shinnecock Canal, Hempstead, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations; request for
comments.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Meadowbrook State Parkway Bridge across Sloop Channel at mile 12.8, at
Hempstead, New York. This deviation will test a change to the
drawbridge operation schedule to determine whether a permanent change
to the schedule is needed. This deviation will allow the bridge to open
on signal if at least a half-hour notice is given to the New York State
Department of Transportation, except that, from 7 a.m. to 8 p.m. on
Saturdays, Sundays, and Federal holidays, the draw shall open every
hour, on the hour, if at least a half-hour notice is given. In
addition, the bridge need not open from 9:30 p.m. to midnight on June
30, 2007 and the rain date July 1, 2007, if needed, and from 9 p.m. to
11 p.m. on July 4, 2007, for the annual fireworks displays.
DATES: This deviation is effective from June 25, 2007 through November
30, 2007. Comments must reach the Coast Guard on or before December 15,
2007.
ADDRESSES: You may mail comments and related material to Commander
(dpb), First Coast Guard District Bridge Branch, One South Street,
Battery Park Building, New York, New York, 10004, or deliver them to
the same address between 7 a.m. and 3 p.m., Monday through Friday,
except Federal holidays. The First Coast Guard District, Bridge Branch,
maintains the public docket for this deviation. Comments and material
received from the public, as well as documents indicated in this notice
as being available in the docket, will become part of this docket and
will be available for inspection or copying at the First Coast Guard
District, Bridge Branch, 7 a.m. to 3 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First
Coast Guard District, at (212) 668-7195.
SUPPLEMENTARY INFORMATION:
Request for Comments
We encourage you to participate in evaluating this test schedule by
submitting comments or related material. If you do so, please include
your name and address, identify the docket number for this deviation
(CGD01-07-044), indicate the specific section of this document to which
each comment applies, and give the reason for each comment. Please
submit all comments and related material in an unbound format, no
larger than 8\1/2\ by 11 inches, suitable for copying. If you would
like to know if they reached us, please enclose a stamped, self-
addressed postcard or envelope. We will consider all comments and
material received during the comment period. Comments must be received
by December 15, 2007.
Background and Purpose
The Meadowbrook State Parkway Bridge has a vertical clearance in
the closed position of 22 feet at mean high water and 25 feet at mean
low water. The existing drawbridge operation regulations are listed at
33 CFR 117.799(h).
New York State Department of Transportation requested a temporary
deviation from the drawbridge operation regulations to test an
alternate drawbridge operation schedule to help better balance the
needs between vehicular land traffic and marine vessel traffic.
Under this temporary deviation, in effect from June 25, 2007
through November 30, 2007, the Meadowbrook State Parkway Bridge across
Sloop Channel at mile 12.8, shall operate as follows:
The bridge shall open on signal if at least a half-hour notice is
given to the New York State Department of Transportation at (631) 578-
5903, except that, from 7 a.m. to 8 p.m. on Saturdays, Sundays, and
Federal
[[Page 32005]]
holidays, the draw shall open on signal, every hour on the hour, if at
least a half-hour notice is given. In addition, the bridge need not
open from 9:30 p.m. to midnight on June 30, 2007 and the rain date July
1, 2007, and from 9 p.m. to 11 p.m. on July 4, 2007, for the annual
fireworks display.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: June 1, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E7-11178 Filed 6-8-07; 8:45 am]