Invenergy Thermal LLC, Complainant, v. ISO New England, Inc., Respondent.; Notice of Complaint and Request for Fast Track, 31571-31572 [E7-10998]

Download as PDF Federal Register / Vol. 72, No. 109 / Thursday, June 7, 2007 / Notices Issued in Washington, DC, on June 1, 2007. Kevin M. Kolevar, Director, Office of Electricity Delivery and Energy Reliability. [FR Doc. E7–11010 Filed 6–6–07; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY [Docket No. 2007–OE–01, Draft Mid-Atlantic Area National Corridor; Docket No. 2007– OE–02, Draft Southwest Area National Corridor] Office of Electricity Delivery and Energy Reliability; Draft National Interest Electric Transmission Corridor Designations Department of Energy. Notice of errata and meetings. AGENCY: ACTION: SUMMARY: The Department of Energy (DOE) published notice of two draft National Interest Electric Transmission Corridors (National Corridors) under section 216 of the Federal Power Act in 72 FR 25838 on May 7, 2007. With regard to the draft Mid-Atlantic Area National Corridor (Docket No. 2007– OE–01), DOE is correcting an error in the text of the May 7, 2007 notice. There are six counties that were correctly included in the map of the draft MidAtlantic Area National Corridor, displayed in Figure VIII–21 at 72 FR 25908, but that were inadvertently omitted from the narrative description of the draft Corridor at 72 FR 25909. The six counties that should have been included in the list at 72 FR 25908 are: Monroe County, OH; Carbon County, PA; Cumberland County, PA; Kanawha County, WV; Mason County, WV; and Putnam County, WV. Further, DOE will be holding four additional public meetings on the draft National Corridors. DOE has scheduled two new public meetings on Docket No. 2007– OE–01 (the draft Mid-Atlantic Area National Corridor) for the following dates: June 12, 2007, 1 p.m. to 7 p.m., Rochester, NY; and June 13, 2007, 1 p.m. to 7 p.m., Pittsburgh, PA. DOE has scheduled two new public meetings on Docket No. 2007–OE–02 (the draft Southwest Area National Corridor) for the following dates: June 20, 2007, 1 p.m. to 7 p.m., Las Vegas, NV; and June 21, 2007, 1 p.m. to 7 p.m., Phoenix, AZ. rwilkins on PROD1PC63 with NOTICES DATES: The locations for the public meetings are: ADDRESSES: VerDate Aug<31>2005 20:59 Jun 06, 2007 Jkt 211001 Rochester, NY—RIT Inn & Conference Center, 5257 West Henrietta Road, West Henrietta, NY 14586; Pittsburgh, PA—National Energy Technology Laboratory, Building 922, Conference Center A, B, & C, 626 Cochrans Mill Road, Pittsburgh, PA 15236 (All attendees will be required to present valid government-issued photo identification, such as a driver’s license, passport, or military ID, upon entrance to the National Energy Technology Laboratory campus); Las Vegas, NV—Atomic Testing Museum, 755 East Flamingo Road, Las Vegas, NV 89119; and Phoenix, AZ—Crowne Plaza Hotel Phoenix Airport, 4300 East Washington, Phoenix, AZ 85034. If you are interested in speaking at one of these meetings, please sign up at https://www.energetics.com/ NIETCpublicmeetings or call 410–953– 6250. FOR FURTHER INFORMATION CONTACT: For technical information, David Meyer, DOE Office of Electricity Delivery and Energy Reliability, (202) 586–1411, david.meyer@hq.doe.gov. For legal information, Mary Morton, DOE Office of the General Counsel, (202) 586–1221, mary.morton@hq.doe.gov. Issued in Washington, DC, on June 1, 2007. Kevin M. Kolevar, Director, Office of Electricity Delivery and Energy Reliability. [FR Doc. E7–11017 Filed 6–6–07; 8:45 am] BILLING CODE 6450–01–P Federal Energy Regulatory Commission [Docket Nos. CP05–130–000, CP05–132– 000; Docket No. CP05–131–000] Dominion Cove Point LNG, LP; Dominion Transmission, Inc.; Notice of Availability of the Final Conformity Determination for Pennsylvania, Maryland, Virginia, West Virginia and New York—Cove Point Expansion Project June 1, 2007. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a Final General Conformity Determination to assess the potential air quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline facilities proposed by Dominion Cove Point LNG, LP and Dominion Transmission, Incorporated (Dominion), referred to as the Cove Frm 00023 Fmt 4703 Point Expansion Project, in the abovereferenced docket. This Final General Conformity Determination was prepared to satisfy the requirements of the Clean Air Act. Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–11000 Filed 6–6–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL07–66–000] Invenergy Thermal LLC, Complainant, v. ISO New England, Inc., Respondent.; Notice of Complaint and Request for Fast Track June 1, 2007. DEPARTMENT OF ENERGY PO 00000 31571 Sfmt 4703 Take notice that on May 31, 2007, Invenergy Thermal LLC (Invenergy) filed a formal complaint against ISO New England, Inc. (ISO–NE) pursuant to section 206 of the Federal Power Act, alleging that it was improper for ISO– NE to disqualify Invenergy’s Sutton Energy Project from being further considered as a potential capacity supplier in ISO–NE’s 2008 Forward Capacity Market auction on the grounds that Invenergy failed to post a Qualification Deposit by February 20, 2007. Invenergy requests that the Commission grant Invenergy a waiver of the February 20, 2007 deadline. Invenergy seeks fast track processing for this complaint. Invenergy certified that it served a copy of the complaint on the contacts for the ISO–NE as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the E:\FR\FM\07JNN1.SGM 07JNN1 31572 Federal Register / Vol. 72, No. 109 / Thursday, June 7, 2007 / Notices appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on June 8, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–10998 Filed 6–6–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 rwilkins on PROD1PC63 with NOTICES June 1, 2007. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC07–98–000. Applicants: James A. Goodman. Description: Brick Power Holdings LLC submits an application requesting authorization and approval to transfer existing control over assets to himself in his anticipated capacity as the sole Managing Member. Filed Date: 05/24/2007. Accession Number: 20070531–0127. Comment Date: 5 p.m. Eastern Time on Thursday, June 14, 2007. Docket Numbers: EC07–99–000. Applicants: Great Plains Energy Incorporated, Kansas City Power & Light VerDate Aug<31>2005 20:59 Jun 06, 2007 Jkt 211001 Company, Aquila, Inc., and Black Hills Corporation. Description: Great Plains Energy Inc., et al request for approval of a two-step transaction in which Aquila will sell its jurisdictional electric utility assets located in Colorado. Filed Date: 05/25/2007. Accession Number: 20070531–0175. Comment Date: 5 p.m. Eastern Time on Friday, June 15, 2007. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER07–576–001. Applicants: Baltimore Gas and Electric Company. Description: Baltimore Gas and Electric Company submits its responses to the information requested in FERC’s Deficiency Letter dated 5/4/07. Filed Date: 05/25/2007. Accession Number: 20070531–0085. Comment Date: 5 p.m. Eastern Time on Friday, June 15, 2007. Docket Numbers: ER07–939–000. Applicants: Columbia Utilities Power, LLC. Description: Columbia Utilities Power, LLC’s Petition for Acceptance of Initial Tariff, Waivers and Blanket Authority, FERC Electric Tariff, Original Volume No.1. Filed Date: 05/25/2007. Accession Number: 20070530–0121. Comment Date: 5 p.m. Eastern Time on Friday, June 15, 2007. Docket Numbers: ER07–941–000. Applicants: Pacific Gas and Electric Company. Description: Pacific Gas and Electric Company submits notice of termination of the revised Service Agreement for Wholesale Distribution Service and Letter Agreement with Modesto Irrigation District. Filed Date: 05/25/2007. Accession Number: 20070530–0135. Comment Date: 5 p.m. Eastern Time on Friday, June 15, 2007. Docket Numbers: ER07–942–000. Applicants: ISO New England Inc., New England Power Pool. Description: ISO New England Power Pool Participants Committee et al submits its Market Rule 1 changes relating to support payments for the cost of Internet Based Communication System etc. Filed Date: 05/29/2007. Accession Number: 20070531–0101. Comment Date: 5 p.m. Eastern Time on Tuesday, June 19, 2007. Docket Numbers: ER07–943–000. Applicants: Black Hills Power, Inc., Cheyenne Light Fuel & Power Company. Description: Black Hills Power Inc and Cheyenne Light, Fuel and Power Co PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 submit a Generation Dispatch and Energy Management Agreement. Filed Date: 05/29/2007. Accession Number: 20070531–0102. Comment Date: 5 p.m. Eastern Time on Tuesday, June 19, 2007. Docket Numbers: ER07–944–000, ER07–945–000. Applicants: Florida Power & Light Company, FPL Energy Power Marketing, Inc. Description: Florida Power & Light Co and FPL Energy Power Marketing, Inc submits proposed amendments to their market based rate tariffs. Filed Date: 05/29/2007. Accession Number: 20070531–0099. Comment Date: 5 p.m. Eastern Time on Tuesday, June 19, 2007. Docket Numbers: ER07–946–000. Applicants: Westar Energy, Inc. Description: Westar Energy, Inc submits Second Revised Sheet No. 1 et al. of First Revised Rate Schedule FERC No. 226 with the City of Holton, Kansas. Filed Date: 05/29/2007. Accession Number: 20070531–0093. Comment Date: 5 p.m. Eastern Time on Tuesday, June 19, 2007. Docket Numbers: ER07–947–000. Applicants: Westar Energy, Inc. Description: Westar Energy, Inc submits Second Revised Sheet No. 1 and First Revised Sheet No. 4 of First Revised Rate Schedule No. 235, a Wholesale Electric Service Agreement with the City of Sabetha, Kansas. Filed Date: 05/29/2007. Accession Number: 20070531–0097. Comment Date: 5 p.m. Eastern Time on Tuesday, June 19, 2007. Docket Numbers: ER07–948–000. Applicants: Westar Energy, Inc. Description: Westar Energy, Inc submits Second Revised Sheet No. 1 et al. of First Revised FERC Rate Schedule No. 211, a Wholesale Electric Service Agreement with the City of Minneapolis, Kansas. Filed Date: 05/29/2007. Accession Number: 20070531–0098. Comment Date: 5 p.m. Eastern Time on Tuesday, June 19, 2007. Docket Numbers: ER07–949–000. Applicants: Westar Energy, Inc. Description: Westar Energy, Inc on behalf of Kansas Gas and Electric Co submits Third Revised Sheet No.1 et al of Rate Schedule FERC No. 152 with Missouri Public Service Co. Filed Date: 05/25/2007. Accession Number: 20070531–0100. Comment Date: 5 p.m. Eastern Time on Friday, June 15, 2007. Docket Numbers: ER07–950–000. Applicants: Saracen Energy MB L.P. Description: Saracen Energy MB, LP submits petition for acceptance of initial E:\FR\FM\07JNN1.SGM 07JNN1

Agencies

[Federal Register Volume 72, Number 109 (Thursday, June 7, 2007)]
[Notices]
[Pages 31571-31572]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-10998]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL07-66-000]


Invenergy Thermal LLC, Complainant, v. ISO New England, Inc., 
Respondent.; Notice of Complaint and Request for Fast Track

June 1, 2007.
    Take notice that on May 31, 2007, Invenergy Thermal LLC (Invenergy) 
filed a formal complaint against ISO New England, Inc. (ISO-NE) 
pursuant to section 206 of the Federal Power Act, alleging that it was 
improper for ISO-NE to disqualify Invenergy's Sutton Energy Project 
from being further considered as a potential capacity supplier in ISO-
NE's 2008 Forward Capacity Market auction on the grounds that Invenergy 
failed to post a Qualification Deposit by February 20, 2007. Invenergy 
requests that the Commission grant Invenergy a waiver of the February 
20, 2007 deadline. Invenergy seeks fast track processing for this 
complaint.
    Invenergy certified that it served a copy of the complaint on the 
contacts for the ISO-NE as listed on the Commission's list of Corporate 
Officials.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the

[[Page 31572]]

appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a notice of intervention or motion to intervene, as appropriate. 
The Respondent's answer and all interventions, or protests must be 
filed on or before the comment date. The Respondent's answer, motions 
to intervene, and protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on June 8, 2007.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-10998 Filed 6-6-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.