Invenergy Thermal LLC, Complainant, v. ISO New England, Inc., Respondent.; Notice of Complaint and Request for Fast Track, 31571-31572 [E7-10998]
Download as PDF
Federal Register / Vol. 72, No. 109 / Thursday, June 7, 2007 / Notices
Issued in Washington, DC, on June 1, 2007.
Kevin M. Kolevar,
Director, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. E7–11010 Filed 6–6–07; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[Docket No. 2007–OE–01, Draft Mid-Atlantic
Area National Corridor; Docket No. 2007–
OE–02, Draft Southwest Area National
Corridor]
Office of Electricity Delivery and
Energy Reliability; Draft National
Interest Electric Transmission Corridor
Designations
Department of Energy.
Notice of errata and meetings.
AGENCY:
ACTION:
SUMMARY: The Department of Energy
(DOE) published notice of two draft
National Interest Electric Transmission
Corridors (National Corridors) under
section 216 of the Federal Power Act in
72 FR 25838 on May 7, 2007. With
regard to the draft Mid-Atlantic Area
National Corridor (Docket No. 2007–
OE–01), DOE is correcting an error in
the text of the May 7, 2007 notice. There
are six counties that were correctly
included in the map of the draft MidAtlantic Area National Corridor,
displayed in Figure VIII–21 at 72 FR
25908, but that were inadvertently
omitted from the narrative description
of the draft Corridor at 72 FR 25909. The
six counties that should have been
included in the list at 72 FR 25908 are:
Monroe County, OH; Carbon County,
PA; Cumberland County, PA; Kanawha
County, WV; Mason County, WV; and
Putnam County, WV. Further, DOE will
be holding four additional public
meetings on the draft National
Corridors.
DOE has scheduled two new
public meetings on Docket No. 2007–
OE–01 (the draft Mid-Atlantic Area
National Corridor) for the following
dates:
June 12, 2007, 1 p.m. to 7 p.m.,
Rochester, NY; and
June 13, 2007, 1 p.m. to 7 p.m.,
Pittsburgh, PA.
DOE has scheduled two new public
meetings on Docket No. 2007–OE–02
(the draft Southwest Area National
Corridor) for the following dates:
June 20, 2007, 1 p.m. to 7 p.m., Las
Vegas, NV; and
June 21, 2007, 1 p.m. to 7 p.m., Phoenix,
AZ.
rwilkins on PROD1PC63 with NOTICES
DATES:
The locations for the public
meetings are:
ADDRESSES:
VerDate Aug<31>2005
20:59 Jun 06, 2007
Jkt 211001
Rochester, NY—RIT Inn & Conference
Center, 5257 West Henrietta Road,
West Henrietta, NY 14586;
Pittsburgh, PA—National Energy
Technology Laboratory, Building 922,
Conference Center A, B, & C, 626
Cochrans Mill Road, Pittsburgh, PA
15236 (All attendees will be required
to present valid government-issued
photo identification, such as a driver’s
license, passport, or military ID, upon
entrance to the National Energy
Technology Laboratory campus);
Las Vegas, NV—Atomic Testing
Museum, 755 East Flamingo Road,
Las Vegas, NV 89119; and
Phoenix, AZ—Crowne Plaza Hotel
Phoenix Airport, 4300 East
Washington, Phoenix, AZ 85034.
If you are interested in speaking at
one of these meetings, please sign up at
https://www.energetics.com/
NIETCpublicmeetings or call 410–953–
6250.
FOR FURTHER INFORMATION CONTACT: For
technical information, David Meyer,
DOE Office of Electricity Delivery and
Energy Reliability, (202) 586–1411,
david.meyer@hq.doe.gov. For legal
information, Mary Morton, DOE Office
of the General Counsel, (202) 586–1221,
mary.morton@hq.doe.gov.
Issued in Washington, DC, on June 1, 2007.
Kevin M. Kolevar,
Director, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. E7–11017 Filed 6–6–07; 8:45 am]
BILLING CODE 6450–01–P
Federal Energy Regulatory
Commission
[Docket Nos. CP05–130–000, CP05–132–
000; Docket No. CP05–131–000]
Dominion Cove Point LNG, LP;
Dominion Transmission, Inc.; Notice of
Availability of the Final Conformity
Determination for Pennsylvania,
Maryland, Virginia, West Virginia and
New York—Cove Point Expansion
Project
June 1, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a Final
General Conformity Determination to
assess the potential air quality impacts
associated with the construction and
operation of a liquefied natural gas
(LNG) import terminal and natural gas
pipeline facilities proposed by
Dominion Cove Point LNG, LP and
Dominion Transmission, Incorporated
(Dominion), referred to as the Cove
Frm 00023
Fmt 4703
Point Expansion Project, in the abovereferenced docket.
This Final General Conformity
Determination was prepared to satisfy
the requirements of the Clean Air Act.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
contact (202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–11000 Filed 6–6–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL07–66–000]
Invenergy Thermal LLC, Complainant,
v. ISO New England, Inc., Respondent.;
Notice of Complaint and Request for
Fast Track
June 1, 2007.
DEPARTMENT OF ENERGY
PO 00000
31571
Sfmt 4703
Take notice that on May 31, 2007,
Invenergy Thermal LLC (Invenergy)
filed a formal complaint against ISO
New England, Inc. (ISO–NE) pursuant to
section 206 of the Federal Power Act,
alleging that it was improper for ISO–
NE to disqualify Invenergy’s Sutton
Energy Project from being further
considered as a potential capacity
supplier in ISO–NE’s 2008 Forward
Capacity Market auction on the grounds
that Invenergy failed to post a
Qualification Deposit by February 20,
2007. Invenergy requests that the
Commission grant Invenergy a waiver of
the February 20, 2007 deadline.
Invenergy seeks fast track processing for
this complaint.
Invenergy certified that it served a
copy of the complaint on the contacts
for the ISO–NE as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
E:\FR\FM\07JNN1.SGM
07JNN1
31572
Federal Register / Vol. 72, No. 109 / Thursday, June 7, 2007 / Notices
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on June 8, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–10998 Filed 6–6–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
rwilkins on PROD1PC63 with NOTICES
June 1, 2007.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC07–98–000.
Applicants: James A. Goodman.
Description: Brick Power Holdings
LLC submits an application requesting
authorization and approval to transfer
existing control over assets to himself in
his anticipated capacity as the sole
Managing Member.
Filed Date: 05/24/2007.
Accession Number: 20070531–0127.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 14, 2007.
Docket Numbers: EC07–99–000.
Applicants: Great Plains Energy
Incorporated, Kansas City Power & Light
VerDate Aug<31>2005
20:59 Jun 06, 2007
Jkt 211001
Company, Aquila, Inc., and Black Hills
Corporation.
Description: Great Plains Energy Inc.,
et al request for approval of a two-step
transaction in which Aquila will sell its
jurisdictional electric utility assets
located in Colorado.
Filed Date: 05/25/2007.
Accession Number: 20070531–0175.
Comment Date: 5 p.m. Eastern Time
on Friday, June 15, 2007.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER07–576–001.
Applicants: Baltimore Gas and
Electric Company.
Description: Baltimore Gas and
Electric Company submits its responses
to the information requested in FERC’s
Deficiency Letter dated 5/4/07.
Filed Date: 05/25/2007.
Accession Number: 20070531–0085.
Comment Date: 5 p.m. Eastern Time
on Friday, June 15, 2007.
Docket Numbers: ER07–939–000.
Applicants: Columbia Utilities Power,
LLC.
Description: Columbia Utilities
Power, LLC’s Petition for Acceptance of
Initial Tariff, Waivers and Blanket
Authority, FERC Electric Tariff, Original
Volume No.1.
Filed Date: 05/25/2007.
Accession Number: 20070530–0121.
Comment Date: 5 p.m. Eastern Time
on Friday, June 15, 2007.
Docket Numbers: ER07–941–000.
Applicants: Pacific Gas and Electric
Company.
Description: Pacific Gas and Electric
Company submits notice of termination
of the revised Service Agreement for
Wholesale Distribution Service and
Letter Agreement with Modesto
Irrigation District.
Filed Date: 05/25/2007.
Accession Number: 20070530–0135.
Comment Date: 5 p.m. Eastern Time
on Friday, June 15, 2007.
Docket Numbers: ER07–942–000.
Applicants: ISO New England Inc.,
New England Power Pool.
Description: ISO New England Power
Pool Participants Committee et al
submits its Market Rule 1 changes
relating to support payments for the cost
of Internet Based Communication
System etc.
Filed Date: 05/29/2007.
Accession Number: 20070531–0101.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 19, 2007.
Docket Numbers: ER07–943–000.
Applicants: Black Hills Power, Inc.,
Cheyenne Light Fuel & Power Company.
Description: Black Hills Power Inc
and Cheyenne Light, Fuel and Power Co
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
submit a Generation Dispatch and
Energy Management Agreement.
Filed Date: 05/29/2007.
Accession Number: 20070531–0102.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 19, 2007.
Docket Numbers: ER07–944–000,
ER07–945–000.
Applicants: Florida Power & Light
Company, FPL Energy Power Marketing,
Inc.
Description: Florida Power & Light Co
and FPL Energy Power Marketing, Inc
submits proposed amendments to their
market based rate tariffs.
Filed Date: 05/29/2007.
Accession Number: 20070531–0099.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 19, 2007.
Docket Numbers: ER07–946–000.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc
submits Second Revised Sheet No. 1 et
al. of First Revised Rate Schedule FERC
No. 226 with the City of Holton, Kansas.
Filed Date: 05/29/2007.
Accession Number: 20070531–0093.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 19, 2007.
Docket Numbers: ER07–947–000.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc
submits Second Revised Sheet No. 1
and First Revised Sheet No. 4 of First
Revised Rate Schedule No. 235, a
Wholesale Electric Service Agreement
with the City of Sabetha, Kansas.
Filed Date: 05/29/2007.
Accession Number: 20070531–0097.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 19, 2007.
Docket Numbers: ER07–948–000.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc
submits Second Revised Sheet No. 1 et
al. of First Revised FERC Rate Schedule
No. 211, a Wholesale Electric Service
Agreement with the City of
Minneapolis, Kansas.
Filed Date: 05/29/2007.
Accession Number: 20070531–0098.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 19, 2007.
Docket Numbers: ER07–949–000.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc on
behalf of Kansas Gas and Electric Co
submits Third Revised Sheet No.1 et al
of Rate Schedule FERC No. 152 with
Missouri Public Service Co.
Filed Date: 05/25/2007.
Accession Number: 20070531–0100.
Comment Date: 5 p.m. Eastern Time
on Friday, June 15, 2007.
Docket Numbers: ER07–950–000.
Applicants: Saracen Energy MB L.P.
Description: Saracen Energy MB, LP
submits petition for acceptance of initial
E:\FR\FM\07JNN1.SGM
07JNN1
Agencies
[Federal Register Volume 72, Number 109 (Thursday, June 7, 2007)]
[Notices]
[Pages 31571-31572]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-10998]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL07-66-000]
Invenergy Thermal LLC, Complainant, v. ISO New England, Inc.,
Respondent.; Notice of Complaint and Request for Fast Track
June 1, 2007.
Take notice that on May 31, 2007, Invenergy Thermal LLC (Invenergy)
filed a formal complaint against ISO New England, Inc. (ISO-NE)
pursuant to section 206 of the Federal Power Act, alleging that it was
improper for ISO-NE to disqualify Invenergy's Sutton Energy Project
from being further considered as a potential capacity supplier in ISO-
NE's 2008 Forward Capacity Market auction on the grounds that Invenergy
failed to post a Qualification Deposit by February 20, 2007. Invenergy
requests that the Commission grant Invenergy a waiver of the February
20, 2007 deadline. Invenergy seeks fast track processing for this
complaint.
Invenergy certified that it served a copy of the complaint on the
contacts for the ISO-NE as listed on the Commission's list of Corporate
Officials.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the
[[Page 31572]]
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a notice of intervention or motion to intervene, as appropriate.
The Respondent's answer and all interventions, or protests must be
filed on or before the comment date. The Respondent's answer, motions
to intervene, and protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on June 8, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-10998 Filed 6-6-07; 8:45 am]
BILLING CODE 6717-01-P