Bonneville Power Administration Complainant, v. Puget Sound Energy, Inc., Hermiston Power Partnership, Chehalis Power Generating, L.P., PPM Energy, Inc. TransAlta Centralia Generation, L.L.C., Respondents.; Notice of Complaint, 31311-31312 [E7-10834]
Download as PDF
Federal Register / Vol. 72, No. 108 / Wednesday, June 6, 2007 / Notices
Internet in lieu of paper. See 18 CFR
385.2001(a) (1) (iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link at https://www.ferc.gov.
The Commission strongly encourages
intervenors to file electronically.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Comment Date: June 20, 2007.
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
31311
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time on
June 4, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–10817 Filed 6–5–07; 8:45 am]
BILLING CODE 6717–01–P
Kimberly D. Bose,
Secretary.
[FR Doc. E7–10840 Filed 6–5–07; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Kimberly D. Bose,
Secretary.
[FR Doc. E7–10814 Filed 6–5–07; 8:45 am]
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. EL07–65–000]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
Bonneville Power Administration
Complainant, v. Puget Sound Energy,
Inc., Hermiston Power Partnership,
Chehalis Power Generating, L.P., PPM
Energy, Inc. TransAlta Centralia
Generation, L.L.C., Respondents.;
Notice of Complaint
DEPARTMENT OF ENERGY
[Docket No. ES07–31–000]
Federal Energy Regulatory
Commission
Trans Bay Cable LLD; Notice of Filing
[Docket No. RP07–396–001]
Take notice that on May 25, 2007,
Trans Bay Cable LLC tendered for filing
amendments to the Application Under
Section 204 of the Federal Power Act for
Authority to Issue Securities.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
May 29, 2007.
Tennessee Gas Pipeline Company;
Notice of Compliance Filing
May 31, 2007.
Take notice that on May 23, 2007,
Tennessee Gas Pipeline Company
(Tennessee) tendered for filing as part of
its FERC Gas Tariff, Fifth Revised
Volume No. 1, the following tariff
sheets, effective May 9, 2007:
jlentini on PROD1PC65 with NOTICES
Substitute Ninth Revised Sheet No. 324
Substitute Fifth Revised Sheet No. 324A
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed in
accordance with the provisions of
Section 154.210 of the Commission’s
regulations (18 CFR 154.210). Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
VerDate Aug<31>2005
16:59 Jun 05, 2007
Jkt 211001
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
May 31, 2007.
Take notice that on May 30, 2007, the
Bonneville Power Administration
(Bonneville) filed a formal complaint
against Puget Sound Energy, Inc.,
Hermiston Power Partnership, Chehalis
Power Generating, L.P., PPM Energy,
Inc., and TransAlta Centralia
Generation, L.L.C. (Respondents)
pursuant to section 206 of the Federal
Power Act and Rule 206 of the Rules of
Practice and Procedure of the Federal
Energy Regulatory Commission, 18 CFR
385.206 (2006), requesting that the
Commission issue an order reducing to
zero the rates Respondents may charge
Bonneville for Reactive Power Service,
effective October 1, 2007.
Bonneville certified that copies of the
complaint were served on the contacts
for Respondents as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
E:\FR\FM\06JNN1.SGM
06JNN1
31312
Federal Register / Vol. 72, No. 108 / Wednesday, June 6, 2007 / Notices
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on June 19, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–10834 Filed 6–5–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings # 1
jlentini on PROD1PC65 with NOTICES
May 30, 2007.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC06–15–001;
EC06–78–001; EC07–37–001; EC06–
147–001.
Applicants: Entegra Power Group
LLC; Gila River Power, L.P.; Union
Power Partners, L.P.; Morgan Stanley &
Co. Incorporated; Merrill Lynch; Pierce,
Fenner & Smith Inc.; Entegra Holdings
LLC; Entegra TC LLC.
Description: Application by Entegra
Power Group, LLC et al for order
amending blanket authorizations for
certain future transfers & acquisitions of
equity interests under Section 203.
Filed Date: 5/15/2007.
Accession Number: 20070524–0006.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 5, 2007.
Docket Numbers: EC07–94–000.
Applicants: Forked River Power LLC.
Description: Forked River Power LLC
submits an application for its proposed
acquisition of the Forked River
Generating Station with related assets
and real property from Jersey Central
Power & Light Co.
Filed Date: 5/21/2007.
Accession Number: 20070524–0116.
Comment Date: 5 p.m. Eastern Time
on Monday, June 11, 2007.
VerDate Aug<31>2005
16:59 Jun 05, 2007
Jkt 211001
Docket Numbers: EC07–95–000.
Applicants: UBS Americas Inc.; UBS
International Infrastructure Fund; UBS
AG; Northern Star Generation LLC; AIG
Global Investment Corp.; Front Range
Power Company, LLC; Vandolah Power
Company, LLC.
Description: UBS Americas Inc et al
submit a Joint Application for
authorization for disposition of
jurisdictional assets pursuant to section
203 of the FPA.
Filed Date: 5/21/2007.
Accession Number: 20070524–0087.
Comment Date: 5 p.m. Eastern Time
on Monday, June 11, 2007.
Docket Numbers: EC07–96–000.
Applicants: Eagle Energy Partners I,
LP; Lehman Brothers Commodity
Services Inc.
Description: Eagle Energy Partners I,
LP et al submit an application under
Section 203 for authorization of
disposition of jurisdictional facilities
resulting from Lehman’s proposed
acquisition of all ownership interest in
Eagle.
Filed Date: 5/21/2007.
Accession Number: 20070524–0181.
Comment Date: 5 p.m. Eastern Time
on Monday, June 11, 2007.
Docket Numbers: EC07–97–000.
Applicants: Ecofin Holdings Limited;
Ecofin Limited; Ecofin, Inc.; Ecofin
Fund Management Limited; Ecofin
General Partner Limited; Ecofin Water &
Power Opportunities Plc; Ecofin Global
Utilities Hedge Fund Limit; Ecofin
Global Utilities Hedge Fund LP; Ecofin
Global Utilities Master Fund Limited;
Ecofin Special Situations Utilities Fund;
Ecofin Special Situations Utilities Fund;
Ecofin Special Situations Utilities
Master; HFR HE Ecofin Master Trust.
Description: Ecofin Holdings Limited
et al submit its request for blanket
authorization to acquire securities under
Section 203 of the FPA.
Filed Date: 5/24/2007.
Accession Number: 20070529–0241.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 14, 2007.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG07–56–000.
Applicants: Tiverton Power LLC and
Rumford Power LLC.
Description: Tiverton Power LLC and
Rumford Power LLC notice of SelfCertification of Exempt Wholesale
Generator Status as the Proposed
Owners of the Tiverton and Rumford
Generating Facilities.
Filed Date: 5/24/2007.
Accession Number: 20070524–5068.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 14, 2007.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER99–1761–002.
Applicants: AES Eastern Energy, LP.
Description: AES Eastern Energy, LP
submits a notice of Non-Material
Change in Status Regarding MarketBased Rate Authority.
Filed Date: 5/24/2007.
Accession Number: 20070524–5010.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 14, 2007.
Docket Numbers: ER01–1266–008;
ER01–1270–010; ER01–1267–010;
ER01–1278–010; ER01–1268–009;
ER01–1271–009; ER01–1272–008;
ER01–1269–008; ER01–1273–009;
ER01–1277–008; ER02–1213–007;
ER06–406–001.
Applicants: Mirant California, LLC;
Mirant Delta, LLC; Mirant Canal, LLC;
Mirant Kendall, LLC; Mirant Potrero,
LLC; Mirant Bowline, LLC; Mirant
Lovett, LLC; Mirant Chalk Point, LLC;
Mirant Mid-Atlantic, LLC; Mirant
Potomac River, LLC; Mirant Energy
Trading, LLC; Mirant Power Purchase,
LLC.
Description: Mirant Entities submits
Notice of a Non-Material Change in
Status to reflect certain departures from
the facts the Commission relied upon in
granting market-based rate authority.
Filed Date: 5/22/2007.
Accession Number: 20070524–0120.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 12, 2007.
Docket Numbers: ER05–1178–010;
ER05–1191–010.
Applicants: Gila River Power, L.P.;
Union Power Partners, L.P.
Description: Gila River Power, L.P. et
al submits notice of non-material change
in status relating to their upstream
ownership structure.
Filed Date: 5/24/2007.
Accession Number: 20070529–0244.
Comment Date: 5 p.m. Eastern Time
on Thursday, June 14, 2007.
Docket Numbers: ER06–456–011;
ER06–954–007; ER06–1271–006; ER07–
424–002.
Applicants: PJM Interconnection,
L.L.C.
Description: PJM Interconnection,
LLC submits amendments to Schedule
12—Appendix to reflect the allocation
of cost responsibility on a region-wide
basis etc, in compliance with FERC’s 4/
19/07 Order.
Filed Date: 5/21/2007.
Accession Number: 20070524–0038.
Comment Date: 5 p.m. Eastern Time
on Monday, June 11, 2007.
Docket Numbers: ER07–335–001;
ER07–335–000.
Applicants: E.ON U.S., LLC.
E:\FR\FM\06JNN1.SGM
06JNN1
Agencies
[Federal Register Volume 72, Number 108 (Wednesday, June 6, 2007)]
[Notices]
[Pages 31311-31312]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-10834]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL07-65-000]
Bonneville Power Administration Complainant, v. Puget Sound
Energy, Inc., Hermiston Power Partnership, Chehalis Power Generating,
L.P., PPM Energy, Inc. TransAlta Centralia Generation, L.L.C.,
Respondents.; Notice of Complaint
May 31, 2007.
Take notice that on May 30, 2007, the Bonneville Power
Administration (Bonneville) filed a formal complaint against Puget
Sound Energy, Inc., Hermiston Power Partnership, Chehalis Power
Generating, L.P., PPM Energy, Inc., and TransAlta Centralia Generation,
L.L.C. (Respondents) pursuant to section 206 of the Federal Power Act
and Rule 206 of the Rules of Practice and Procedure of the Federal
Energy Regulatory Commission, 18 CFR 385.206 (2006), requesting that
the Commission issue an order reducing to zero the rates Respondents
may charge Bonneville for Reactive Power Service, effective October 1,
2007.
Bonneville certified that copies of the complaint were served on
the contacts for Respondents as listed on the Commission's list of
Corporate Officials.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov.
[[Page 31312]]
Persons unable to file electronically should submit an original and 14
copies of the protest or intervention to the Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on June 19, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-10834 Filed 6-5-07; 8:45 am]
BILLING CODE 6717-01-P