Environmental Impact Statements; Notice of Availability, 30589-30590 [E7-10593]
Download as PDF
Federal Register / Vol. 72, No. 105 / Friday, June 1, 2007 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6687–5]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2007 (72 FR 17156).
hsrobinson on PROD1PC76 with NOTICES
Draft EISs
EIS No. 20070116, ERP No. D–AFS–
J65478–00, Norwood Project, Proposes
to Implement Multiple Resource
Management Actions, Black Hills
National Forest, Hell Canyon Ranger
District, Pennington County, SD and
Weston and Crook Counties, WY.
Summary: EPA expressed
environmental concerns about impacts
to water quality, impacts to wetlands,
impacts from noxious and invasive
weeds, and impacts to wildlife habitat.
Also, the final EIS should include
information about future interactions
with the soon to be completed cellulosic
ethanol plant.
Rating EC2.
EIS No. 20070119, ERP No. D–NOA–
L02034–AK, PROGRAMMATIC—Outer
Continental Shelf Seismic Surveys in
the Beaufort and Chukchi Seas,
Proposed Offshore Oil and Gas Seismic
Survey, AK.
Summary: EPA expressed
environmental concerns about the
uncertainties presented in the document
that do not provide support for many of
the documents alternatives and
conclusions. EPA also requested that the
cumulative effects analysis be
expanded.
Rating EC2.
EIS No. 20070122, ERP No. D–BLM–
J03020–00, Overland Pass Natural Gas
Liquids Pipeline Project (OPP),
Construction and Operation of 760 Mile
Natural Gas Liquids Pipeline, Right-ofWay Grant, KS, WY and CO.
Summary: EPA expressed
environmental concerns about potential
impacts to river and stream water
quality. EPA requested additional
analysis of water quality impacts and
mitigation measures.
Rating EC2.
VerDate Aug<31>2005
18:10 May 31, 2007
Jkt 211001
EIS No. 20070154, ERP No. D–NOA–
E91018–00, Amendment 27 to the Reef
Fish Fishery Management Plan and
Amendment 14 to the Shrimp Fishery
Management Plan, To Address Stock
Rebuilding and Overfishing of Red
Snapper, Gulf of Mexico.
Summary: EPA does not object to the
proposed actions.
Rating LO.
EIS No. 20070140, ERP No. DR–NOA–
A91073–00, PROGRAMMATIC—
Toward an Ecosystem Approach for the
Western Pacific Region: From SpeciesBased Fishery Management Plans to
Place-Based Fishery Ecosystem Plans,
Bottomfish and Seamount Groundfish,
Coral Reef Ecosystems, Crustaceans,
Precious Corals, Pelagics,
Implementation, American Samoa,
Commonwealth of the Northern Mariana
Islands, Hawaii, U.S. Pacific Remote
Island Area.
Summary: EPA expressed a lack of
objections to the proposed action.
Rating LO.
Final EISs
EIS No. 20070164, ERP No. F–AFS–
J65440–MT, Northeast Yaak Project,
Additional Documentation of
Cumulative Effects Analysis, Proposed
Harvest to Reduce Fuels in Old Growth,
Implementation, Kootenai National
Forest, Three Rivers Ranger District,
Lincoln County, MT.
Summary: EPA continues to express
concern about impacts to wildlife
habitat.
Dated: May 29, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–10600 Filed 5–31–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6687–4]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 05/21/2007 Through 05/25/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070205, Draft EIS, AFS, WA,
Tripod Fire Salvage Project, Proposal
to Salvage Harvest Dead Trees and
Fire-Injured Trees Expected to Die
Within One Year, Methow Valley and
Tonasket Ranger Districts, Okanogan
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
30589
and Wenatchee National Forests,
Okanogan County, WA, Comment
Period Ends: 07/16/2007, Contact:
John Newcom 509–996–4003.
EIS No. 20070206, Final EIS, FHW, NY,
NY Route 347 Safety and Mobility
Improvement Project, from Northern
State Parkway to NY Route 25A,
Funding, Towns of Smithtown, Islip
and Brookhaven, Suffolk County, NY,
Wait Period Ends: 07/02/2007,
Contact: Robert Arnold 518–431–
4167.
EIS No. 20070207, Draft EIS, AFS, SD,
Citadel Project Area, Proposes to
Implement Multiple Resource
Management Actions, Northern Hills
Ranger District, Black Hills National
Forest, Lawrence County, SD,
Comment Period Ends: 07/16/2007,
Contact: Chris Stores 605–642–4622.
EIS No. 20070208, Draft EIS, HUD, CA,
Vista Village Workforce Housing
Project, To Provide Professional
Managed Affordable Housing, Tahoe
Vista, Placer County, CA, Comment
Period Ends: 07/16/2007, Contact:
Joanne Auerboch 530–745–3150.
EIS No. 20070209, Draft EIS, FHW, NY,
Long Island Truck-Rail Intermodel
(LITRIM) Facility, Construction and
Operation, Right-of-Way Acquisition,
Town of Islip, Suffolk County, NY,
Comment Period Ends: 07/25/2007,
Contact: Robert Arnold 518–431–
4127.
EIS No. 20070210, Draft EIS, USA, CA,
Carmp Parks Real Property Master
Plan and Real Property Exchange,
Provide Exceptional Training and
Modern Facilities for Soldiers, Master
Planned Development, Alameda and
Contra Costa Counties, CA, Comment
Period Ends: 07/16/2007, Contact:
Amy Phillip 925–875–4298.
EIS No. 20070211, Draft EIS, AFS, OR,
Thorn Fire Salvage Recovery Project,
Salvaging Dead and Dying Timber,
Shake Table Fire Complex, Malheur
National Forest, Grant County, OR,
Comment Period Ends: 07/16/2007,
Contact: Jerry Hensley 541–575–3000.
EIS No. 20070212, Draft EIS, TVA, AL,
Bear Creek Dam Leakage Resolution
Project, To Modify Dam and Maintain
Summer Pool Level of 576 Feet, Bear
Creek Dam, Franklin County, AL,
Comment Period Ends: 07/16/2007,
Contact: James F. Williamson 865–
632–6418.
EIS No. 20070213, Draft EIS, DOE, 00,
FutureGen Project, Planning, Design,
Construction and Operation a Coal
Fueled Electric Power and Hydrogen
Gas Production Plant, Four
Alternative Sites: Mattoon, IL,
Tuscola, IL, Jewett, TX and Odessa,
TX, Comment Period Ends: 07/16/
E:\FR\FM\01JNN1.SGM
01JNN1
30590
Federal Register / Vol. 72, No. 105 / Friday, June 1, 2007 / Notices
2007, Contact: Mark McKoy 304–285–
4426.
EIS No. 20070214, Final EIS, FRC, 00,
East Texas to Mississippi Expansion
Project, Construction and Operation
of 243.3 miles Natural Gas Pipeline to
Transport Natural Gas from
Production Fields in eastern Texas to
Markets in the Gulf Coast,
Midwestern, Northeastern and
Southeastern United States, Wait
Period Ends: 07/02/2007, Contact:
Andy Black 1–866–208–3372.
EIS No. 20070216, Draft Supplement,
AFS, 00, Southwest Idaho Ecogroup
Land and Resource Management Plan,
Additional Information Concerning
Terrestrial Management Indicator
Species (MIS), Boise National Forest,
Payette National Forest and Sawtooth
National Forest, Forest Plan Revision,
Implementation, Several Counties, ID;
Malhaur County, OR and Box Elder
County, UT, Comment Period Ends:
08/30/2007, Contact: Sharon
LaBrecque 208–737–3200.
EIS No. 20070217, Final EIS, CDB, NY,
East River Waterfront Esplanade and
Piers Project, Revitalization,
Connecting Whitehall Ferry Terminal
and Peter Minuit Plaza to East River
Park, Funding New York, NY, Wait
Period Ends: 07/02/2007, Contact:
Irene Chang 212–962–2300.
EIS No. 20070218, Draft EIS, FHW, CA,
Interstate 405 (San Diego Freeway)
Sepulveda Pass Widening Project,
From Interstate 10 to US–101 in the
City of Los Angeles, Los Angeles
County, CA, Comment Period Ends:
07/16/2007, Contact: Steve Healow
916–498–5849.
EIS No. 20070219, Final EIS, AFS, 00,
Norwood Project, Proposes to
Implement Multiple Resource
Management Actions, Black Hills
National Forest, Hell Canyon Ranger
District, Pennington County, SD and
Weston and Crook Counties, WY,
Wait Period Ends: 07/02/2007,
Contact: Kelly Honors 605–673–4853.
hsrobinson on PROD1PC76 with NOTICES
Amended Notices
EIS No. 20070069, Second Final
Supplement, FHW, WV, Appalachian
Corridor H Project, Construction of a
9-mile Long Segment between the
Termini of Parsons and Davis,
Updated Information the Parsons-toDavis Project, Funding and U.S. Army
COE Section 404 Permit Issuance,
Tucker County, WV, Wait Period
Ends: 08/01/2007, Contact: Thomas J.
Smith 304–347–5928. Revision to FR
Notice Published 03/02/2007: Reopen
and Extending Comment Period from
4/27/2007 to August 1, 2007.
VerDate Aug<31>2005
18:10 May 31, 2007
Jkt 211001
Dated: May 29, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA
Compliance Division, Office of Federal
Activities.
[FR Doc. E7–10593 Filed 5–31–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2006–0072; FRL–8131–1]
Pesticide Products; Registration
Applications
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: This notice announces receipt
of applications to register pesticide
products containing new active
ingredients not included in any
currently registered products pursuant
to the provisions of section 3(c)(4) of the
Federal Insecticide, Fungicide, and
Rodenticide Act (FIFRA), as amended.
DATES: Comments must be received on
or before July 31, 2007.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2006–0072, by
one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Office of Pesticide Programs
(OPP) Regulatory Public Docket (7502P),
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001.
• Delivery: OPP Regulatory Public
Docket (7502P), Environmental
Protection Agency, Rm. S-4400, One
Potomac Yard (South Bldg.), 2777 S.
Crystal Dr., Arlington, VA. Deliveries
are only accepted during the Docket’s
normal hours of operation (8:30 a.m. to
4 p.m., Monday through Friday,
excluding legal holidays). Special
arrangements should be made for
deliveries of boxed information. The
Docket telephone number is (703) 305–
5805.
Instructions: Direct your comments to
docket ID number EPA–HQ–OPP–2006–
0072. EPA’s policy is that all comments
received will be included in the docket
without change and may be made
available on-line at https://
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
consider to be CBI or otherwise
protected through regulations.gov or email. The Federal regulations.gov
website is an ‘‘anonymous access’’
system, which means EPA will not
know your identity or contact
information unless you provide it in the
body of your comment. If you send an
e-mail comment directly to EPA without
going through regulations.gov, your email address will be automatically
captured and included as part of the
comment that is placed in the docket
and made available on the Internet. If
you submit an electronic comment, EPA
recommends that you include your
name and other contact information in
the body of your comment and with any
disk or CD-ROM you submit. If EPA
cannot read your comment due to
technical difficulties and cannot contact
you for clarification, EPA may not be
able to consider your comment.
Electronic files should avoid the use of
special characters, any form of
encryption, and be free of any defects or
viruses.
Docket: All documents in the docket
are listed in the docket index available
in regulations.gov. To access the
electronic docket, go to https://
www.regulations.gov, select ‘‘Advanced
Search,’’ then ‘‘Docket Search.’’ Insert
the docket ID number where indicated
and select the ‘‘Submit’’ button. Follow
the instructions on the regulations.gov
web site to view the docket index or
access available documents. Although
listed in the index, some information is
not publicly available, e.g., CBI or other
information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
is not placed on the Internet and will be
publicly available only in hard copy
form. Publicly available docket
materials are available either in the
electronic docket at https://
www.regulations.gov, or, if only
available in hard copy, at the OPP
Regulatory Public Docket in Rm. S-4400,
One Potomac Yard (South Bldg.), 2777
S. Crystal Dr., Arlington, VA. The hours
of operation of this Docket Facility are
from 8:30 a.m. to 4 p.m., Monday
through Friday, excluding legal
holidays. The Docket telephone number
is (703) 305–5805.
FOR FURTHER INFORMATION CONTACT:
Eugene Wilson, Registration Division
(7505P), Office of Pesticide Programs,
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460–0001; telephone number:
(703) 305–6103; e-mail address:
wilson.eugene@epa.gov.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\01JNN1.SGM
01JNN1
Agencies
[Federal Register Volume 72, Number 105 (Friday, June 1, 2007)]
[Notices]
[Pages 30589-30590]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-10593]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6687-4]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 05/21/2007 Through 05/25/2007
Pursuant to 40 CFR 1506.9.
EIS No. 20070205, Draft EIS, AFS, WA, Tripod Fire Salvage Project,
Proposal to Salvage Harvest Dead Trees and Fire-Injured Trees Expected
to Die Within One Year, Methow Valley and Tonasket Ranger Districts,
Okanogan and Wenatchee National Forests, Okanogan County, WA, Comment
Period Ends: 07/16/2007, Contact: John Newcom 509-996-4003.
EIS No. 20070206, Final EIS, FHW, NY, NY Route 347 Safety and Mobility
Improvement Project, from Northern State Parkway to NY Route 25A,
Funding, Towns of Smithtown, Islip and Brookhaven, Suffolk County, NY,
Wait Period Ends: 07/02/2007, Contact: Robert Arnold 518-431-4167.
EIS No. 20070207, Draft EIS, AFS, SD, Citadel Project Area, Proposes to
Implement Multiple Resource Management Actions, Northern Hills Ranger
District, Black Hills National Forest, Lawrence County, SD, Comment
Period Ends: 07/16/2007, Contact: Chris Stores 605-642-4622.
EIS No. 20070208, Draft EIS, HUD, CA, Vista Village Workforce Housing
Project, To Provide Professional Managed Affordable Housing, Tahoe
Vista, Placer County, CA, Comment Period Ends: 07/16/2007, Contact:
Joanne Auerboch 530-745-3150.
EIS No. 20070209, Draft EIS, FHW, NY, Long Island Truck-Rail Intermodel
(LITRIM) Facility, Construction and Operation, Right-of-Way
Acquisition, Town of Islip, Suffolk County, NY, Comment Period Ends:
07/25/2007, Contact: Robert Arnold 518-431-4127.
EIS No. 20070210, Draft EIS, USA, CA, Carmp Parks Real Property Master
Plan and Real Property Exchange, Provide Exceptional Training and
Modern Facilities for Soldiers, Master Planned Development, Alameda and
Contra Costa Counties, CA, Comment Period Ends: 07/16/2007, Contact:
Amy Phillip 925-875-4298.
EIS No. 20070211, Draft EIS, AFS, OR, Thorn Fire Salvage Recovery
Project, Salvaging Dead and Dying Timber, Shake Table Fire Complex,
Malheur National Forest, Grant County, OR, Comment Period Ends: 07/16/
2007, Contact: Jerry Hensley 541-575-3000.
EIS No. 20070212, Draft EIS, TVA, AL, Bear Creek Dam Leakage Resolution
Project, To Modify Dam and Maintain Summer Pool Level of 576 Feet, Bear
Creek Dam, Franklin County, AL, Comment Period Ends: 07/16/2007,
Contact: James F. Williamson 865-632-6418.
EIS No. 20070213, Draft EIS, DOE, 00, FutureGen Project, Planning,
Design, Construction and Operation a Coal Fueled Electric Power and
Hydrogen Gas Production Plant, Four Alternative Sites: Mattoon, IL,
Tuscola, IL, Jewett, TX and Odessa, TX, Comment Period Ends: 07/16/
[[Page 30590]]
2007, Contact: Mark McKoy 304-285-4426.
EIS No. 20070214, Final EIS, FRC, 00, East Texas to Mississippi
Expansion Project, Construction and Operation of 243.3 miles Natural
Gas Pipeline to Transport Natural Gas from Production Fields in eastern
Texas to Markets in the Gulf Coast, Midwestern, Northeastern and
Southeastern United States, Wait Period Ends: 07/02/2007, Contact: Andy
Black 1-866-208-3372.
EIS No. 20070216, Draft Supplement, AFS, 00, Southwest Idaho Ecogroup
Land and Resource Management Plan, Additional Information Concerning
Terrestrial Management Indicator Species (MIS), Boise National Forest,
Payette National Forest and Sawtooth National Forest, Forest Plan
Revision, Implementation, Several Counties, ID; Malhaur County, OR and
Box Elder County, UT, Comment Period Ends: 08/30/2007, Contact: Sharon
LaBrecque 208-737-3200.
EIS No. 20070217, Final EIS, CDB, NY, East River Waterfront Esplanade
and Piers Project, Revitalization, Connecting Whitehall Ferry Terminal
and Peter Minuit Plaza to East River Park, Funding New York, NY, Wait
Period Ends: 07/02/2007, Contact: Irene Chang 212-962-2300.
EIS No. 20070218, Draft EIS, FHW, CA, Interstate 405 (San Diego
Freeway) Sepulveda Pass Widening Project, From Interstate 10 to US-101
in the City of Los Angeles, Los Angeles County, CA, Comment Period
Ends: 07/16/2007, Contact: Steve Healow 916-498-5849.
EIS No. 20070219, Final EIS, AFS, 00, Norwood Project, Proposes to
Implement Multiple Resource Management Actions, Black Hills National
Forest, Hell Canyon Ranger District, Pennington County, SD and Weston
and Crook Counties, WY, Wait Period Ends: 07/02/2007, Contact: Kelly
Honors 605-673-4853.
Amended Notices
EIS No. 20070069, Second Final Supplement, FHW, WV, Appalachian
Corridor H Project, Construction of a 9-mile Long Segment between the
Termini of Parsons and Davis, Updated Information the Parsons-to-Davis
Project, Funding and U.S. Army COE Section 404 Permit Issuance, Tucker
County, WV, Wait Period Ends: 08/01/2007, Contact: Thomas J. Smith 304-
347-5928. Revision to FR Notice Published 03/02/2007: Reopen and
Extending Comment Period from 4/27/2007 to August 1, 2007.
Dated: May 29, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E7-10593 Filed 5-31-07; 8:45 am]
BILLING CODE 6560-50-P