Environmental Impact Statements; Notice of Availability, 30589-30590 [E7-10593]

Download as PDF Federal Register / Vol. 72, No. 105 / Friday, June 1, 2007 / Notices ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6687–5] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 6, 2007 (72 FR 17156). hsrobinson on PROD1PC76 with NOTICES Draft EISs EIS No. 20070116, ERP No. D–AFS– J65478–00, Norwood Project, Proposes to Implement Multiple Resource Management Actions, Black Hills National Forest, Hell Canyon Ranger District, Pennington County, SD and Weston and Crook Counties, WY. Summary: EPA expressed environmental concerns about impacts to water quality, impacts to wetlands, impacts from noxious and invasive weeds, and impacts to wildlife habitat. Also, the final EIS should include information about future interactions with the soon to be completed cellulosic ethanol plant. Rating EC2. EIS No. 20070119, ERP No. D–NOA– L02034–AK, PROGRAMMATIC—Outer Continental Shelf Seismic Surveys in the Beaufort and Chukchi Seas, Proposed Offshore Oil and Gas Seismic Survey, AK. Summary: EPA expressed environmental concerns about the uncertainties presented in the document that do not provide support for many of the documents alternatives and conclusions. EPA also requested that the cumulative effects analysis be expanded. Rating EC2. EIS No. 20070122, ERP No. D–BLM– J03020–00, Overland Pass Natural Gas Liquids Pipeline Project (OPP), Construction and Operation of 760 Mile Natural Gas Liquids Pipeline, Right-ofWay Grant, KS, WY and CO. Summary: EPA expressed environmental concerns about potential impacts to river and stream water quality. EPA requested additional analysis of water quality impacts and mitigation measures. Rating EC2. VerDate Aug<31>2005 18:10 May 31, 2007 Jkt 211001 EIS No. 20070154, ERP No. D–NOA– E91018–00, Amendment 27 to the Reef Fish Fishery Management Plan and Amendment 14 to the Shrimp Fishery Management Plan, To Address Stock Rebuilding and Overfishing of Red Snapper, Gulf of Mexico. Summary: EPA does not object to the proposed actions. Rating LO. EIS No. 20070140, ERP No. DR–NOA– A91073–00, PROGRAMMATIC— Toward an Ecosystem Approach for the Western Pacific Region: From SpeciesBased Fishery Management Plans to Place-Based Fishery Ecosystem Plans, Bottomfish and Seamount Groundfish, Coral Reef Ecosystems, Crustaceans, Precious Corals, Pelagics, Implementation, American Samoa, Commonwealth of the Northern Mariana Islands, Hawaii, U.S. Pacific Remote Island Area. Summary: EPA expressed a lack of objections to the proposed action. Rating LO. Final EISs EIS No. 20070164, ERP No. F–AFS– J65440–MT, Northeast Yaak Project, Additional Documentation of Cumulative Effects Analysis, Proposed Harvest to Reduce Fuels in Old Growth, Implementation, Kootenai National Forest, Three Rivers Ranger District, Lincoln County, MT. Summary: EPA continues to express concern about impacts to wildlife habitat. Dated: May 29, 2007. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. E7–10600 Filed 5–31–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6687–4] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 05/21/2007 Through 05/25/2007 Pursuant to 40 CFR 1506.9. EIS No. 20070205, Draft EIS, AFS, WA, Tripod Fire Salvage Project, Proposal to Salvage Harvest Dead Trees and Fire-Injured Trees Expected to Die Within One Year, Methow Valley and Tonasket Ranger Districts, Okanogan PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 30589 and Wenatchee National Forests, Okanogan County, WA, Comment Period Ends: 07/16/2007, Contact: John Newcom 509–996–4003. EIS No. 20070206, Final EIS, FHW, NY, NY Route 347 Safety and Mobility Improvement Project, from Northern State Parkway to NY Route 25A, Funding, Towns of Smithtown, Islip and Brookhaven, Suffolk County, NY, Wait Period Ends: 07/02/2007, Contact: Robert Arnold 518–431– 4167. EIS No. 20070207, Draft EIS, AFS, SD, Citadel Project Area, Proposes to Implement Multiple Resource Management Actions, Northern Hills Ranger District, Black Hills National Forest, Lawrence County, SD, Comment Period Ends: 07/16/2007, Contact: Chris Stores 605–642–4622. EIS No. 20070208, Draft EIS, HUD, CA, Vista Village Workforce Housing Project, To Provide Professional Managed Affordable Housing, Tahoe Vista, Placer County, CA, Comment Period Ends: 07/16/2007, Contact: Joanne Auerboch 530–745–3150. EIS No. 20070209, Draft EIS, FHW, NY, Long Island Truck-Rail Intermodel (LITRIM) Facility, Construction and Operation, Right-of-Way Acquisition, Town of Islip, Suffolk County, NY, Comment Period Ends: 07/25/2007, Contact: Robert Arnold 518–431– 4127. EIS No. 20070210, Draft EIS, USA, CA, Carmp Parks Real Property Master Plan and Real Property Exchange, Provide Exceptional Training and Modern Facilities for Soldiers, Master Planned Development, Alameda and Contra Costa Counties, CA, Comment Period Ends: 07/16/2007, Contact: Amy Phillip 925–875–4298. EIS No. 20070211, Draft EIS, AFS, OR, Thorn Fire Salvage Recovery Project, Salvaging Dead and Dying Timber, Shake Table Fire Complex, Malheur National Forest, Grant County, OR, Comment Period Ends: 07/16/2007, Contact: Jerry Hensley 541–575–3000. EIS No. 20070212, Draft EIS, TVA, AL, Bear Creek Dam Leakage Resolution Project, To Modify Dam and Maintain Summer Pool Level of 576 Feet, Bear Creek Dam, Franklin County, AL, Comment Period Ends: 07/16/2007, Contact: James F. Williamson 865– 632–6418. EIS No. 20070213, Draft EIS, DOE, 00, FutureGen Project, Planning, Design, Construction and Operation a Coal Fueled Electric Power and Hydrogen Gas Production Plant, Four Alternative Sites: Mattoon, IL, Tuscola, IL, Jewett, TX and Odessa, TX, Comment Period Ends: 07/16/ E:\FR\FM\01JNN1.SGM 01JNN1 30590 Federal Register / Vol. 72, No. 105 / Friday, June 1, 2007 / Notices 2007, Contact: Mark McKoy 304–285– 4426. EIS No. 20070214, Final EIS, FRC, 00, East Texas to Mississippi Expansion Project, Construction and Operation of 243.3 miles Natural Gas Pipeline to Transport Natural Gas from Production Fields in eastern Texas to Markets in the Gulf Coast, Midwestern, Northeastern and Southeastern United States, Wait Period Ends: 07/02/2007, Contact: Andy Black 1–866–208–3372. EIS No. 20070216, Draft Supplement, AFS, 00, Southwest Idaho Ecogroup Land and Resource Management Plan, Additional Information Concerning Terrestrial Management Indicator Species (MIS), Boise National Forest, Payette National Forest and Sawtooth National Forest, Forest Plan Revision, Implementation, Several Counties, ID; Malhaur County, OR and Box Elder County, UT, Comment Period Ends: 08/30/2007, Contact: Sharon LaBrecque 208–737–3200. EIS No. 20070217, Final EIS, CDB, NY, East River Waterfront Esplanade and Piers Project, Revitalization, Connecting Whitehall Ferry Terminal and Peter Minuit Plaza to East River Park, Funding New York, NY, Wait Period Ends: 07/02/2007, Contact: Irene Chang 212–962–2300. EIS No. 20070218, Draft EIS, FHW, CA, Interstate 405 (San Diego Freeway) Sepulveda Pass Widening Project, From Interstate 10 to US–101 in the City of Los Angeles, Los Angeles County, CA, Comment Period Ends: 07/16/2007, Contact: Steve Healow 916–498–5849. EIS No. 20070219, Final EIS, AFS, 00, Norwood Project, Proposes to Implement Multiple Resource Management Actions, Black Hills National Forest, Hell Canyon Ranger District, Pennington County, SD and Weston and Crook Counties, WY, Wait Period Ends: 07/02/2007, Contact: Kelly Honors 605–673–4853. hsrobinson on PROD1PC76 with NOTICES Amended Notices EIS No. 20070069, Second Final Supplement, FHW, WV, Appalachian Corridor H Project, Construction of a 9-mile Long Segment between the Termini of Parsons and Davis, Updated Information the Parsons-toDavis Project, Funding and U.S. Army COE Section 404 Permit Issuance, Tucker County, WV, Wait Period Ends: 08/01/2007, Contact: Thomas J. Smith 304–347–5928. Revision to FR Notice Published 03/02/2007: Reopen and Extending Comment Period from 4/27/2007 to August 1, 2007. VerDate Aug<31>2005 18:10 May 31, 2007 Jkt 211001 Dated: May 29, 2007. Ken Mittelholtz, Environmental Protection Specialist, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–10593 Filed 5–31–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2006–0072; FRL–8131–1] Pesticide Products; Registration Applications Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: This notice announces receipt of applications to register pesticide products containing new active ingredients not included in any currently registered products pursuant to the provisions of section 3(c)(4) of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), as amended. DATES: Comments must be received on or before July 31, 2007. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPP–2006–0072, by one of the following methods: • Federal eRulemaking Portal: https:// www.regulations.gov. Follow the on-line instructions for submitting comments. • Mail: Office of Pesticide Programs (OPP) Regulatory Public Docket (7502P), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001. • Delivery: OPP Regulatory Public Docket (7502P), Environmental Protection Agency, Rm. S-4400, One Potomac Yard (South Bldg.), 2777 S. Crystal Dr., Arlington, VA. Deliveries are only accepted during the Docket’s normal hours of operation (8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays). Special arrangements should be made for deliveries of boxed information. The Docket telephone number is (703) 305– 5805. Instructions: Direct your comments to docket ID number EPA–HQ–OPP–2006– 0072. EPA’s policy is that all comments received will be included in the docket without change and may be made available on-line at https:// www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 consider to be CBI or otherwise protected through regulations.gov or email. The Federal regulations.gov website is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly to EPA without going through regulations.gov, your email address will be automatically captured and included as part of the comment that is placed in the docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD-ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. Docket: All documents in the docket are listed in the docket index available in regulations.gov. To access the electronic docket, go to https:// www.regulations.gov, select ‘‘Advanced Search,’’ then ‘‘Docket Search.’’ Insert the docket ID number where indicated and select the ‘‘Submit’’ button. Follow the instructions on the regulations.gov web site to view the docket index or access available documents. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either in the electronic docket at https:// www.regulations.gov, or, if only available in hard copy, at the OPP Regulatory Public Docket in Rm. S-4400, One Potomac Yard (South Bldg.), 2777 S. Crystal Dr., Arlington, VA. The hours of operation of this Docket Facility are from 8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays. The Docket telephone number is (703) 305–5805. FOR FURTHER INFORMATION CONTACT: Eugene Wilson, Registration Division (7505P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001; telephone number: (703) 305–6103; e-mail address: wilson.eugene@epa.gov. SUPPLEMENTARY INFORMATION: E:\FR\FM\01JNN1.SGM 01JNN1

Agencies

[Federal Register Volume 72, Number 105 (Friday, June 1, 2007)]
[Notices]
[Pages 30589-30590]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-10593]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6687-4]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 05/21/2007 Through 05/25/2007
Pursuant to 40 CFR 1506.9.

EIS No. 20070205, Draft EIS, AFS, WA, Tripod Fire Salvage Project, 
Proposal to Salvage Harvest Dead Trees and Fire-Injured Trees Expected 
to Die Within One Year, Methow Valley and Tonasket Ranger Districts, 
Okanogan and Wenatchee National Forests, Okanogan County, WA, Comment 
Period Ends: 07/16/2007, Contact: John Newcom 509-996-4003.
EIS No. 20070206, Final EIS, FHW, NY, NY Route 347 Safety and Mobility 
Improvement Project, from Northern State Parkway to NY Route 25A, 
Funding, Towns of Smithtown, Islip and Brookhaven, Suffolk County, NY, 
Wait Period Ends: 07/02/2007, Contact: Robert Arnold 518-431-4167.
EIS No. 20070207, Draft EIS, AFS, SD, Citadel Project Area, Proposes to 
Implement Multiple Resource Management Actions, Northern Hills Ranger 
District, Black Hills National Forest, Lawrence County, SD, Comment 
Period Ends: 07/16/2007, Contact: Chris Stores 605-642-4622.
EIS No. 20070208, Draft EIS, HUD, CA, Vista Village Workforce Housing 
Project, To Provide Professional Managed Affordable Housing, Tahoe 
Vista, Placer County, CA, Comment Period Ends: 07/16/2007, Contact: 
Joanne Auerboch 530-745-3150.
EIS No. 20070209, Draft EIS, FHW, NY, Long Island Truck-Rail Intermodel 
(LITRIM) Facility, Construction and Operation, Right-of-Way 
Acquisition, Town of Islip, Suffolk County, NY, Comment Period Ends: 
07/25/2007, Contact: Robert Arnold 518-431-4127.
EIS No. 20070210, Draft EIS, USA, CA, Carmp Parks Real Property Master 
Plan and Real Property Exchange, Provide Exceptional Training and 
Modern Facilities for Soldiers, Master Planned Development, Alameda and 
Contra Costa Counties, CA, Comment Period Ends: 07/16/2007, Contact: 
Amy Phillip 925-875-4298.
EIS No. 20070211, Draft EIS, AFS, OR, Thorn Fire Salvage Recovery 
Project, Salvaging Dead and Dying Timber, Shake Table Fire Complex, 
Malheur National Forest, Grant County, OR, Comment Period Ends: 07/16/
2007, Contact: Jerry Hensley 541-575-3000.
EIS No. 20070212, Draft EIS, TVA, AL, Bear Creek Dam Leakage Resolution 
Project, To Modify Dam and Maintain Summer Pool Level of 576 Feet, Bear 
Creek Dam, Franklin County, AL, Comment Period Ends: 07/16/2007, 
Contact: James F. Williamson 865-632-6418.
EIS No. 20070213, Draft EIS, DOE, 00, FutureGen Project, Planning, 
Design, Construction and Operation a Coal Fueled Electric Power and 
Hydrogen Gas Production Plant, Four Alternative Sites: Mattoon, IL, 
Tuscola, IL, Jewett, TX and Odessa, TX, Comment Period Ends: 07/16/

[[Page 30590]]

2007, Contact: Mark McKoy 304-285-4426.
EIS No. 20070214, Final EIS, FRC, 00, East Texas to Mississippi 
Expansion Project, Construction and Operation of 243.3 miles Natural 
Gas Pipeline to Transport Natural Gas from Production Fields in eastern 
Texas to Markets in the Gulf Coast, Midwestern, Northeastern and 
Southeastern United States, Wait Period Ends: 07/02/2007, Contact: Andy 
Black 1-866-208-3372.
EIS No. 20070216, Draft Supplement, AFS, 00, Southwest Idaho Ecogroup 
Land and Resource Management Plan, Additional Information Concerning 
Terrestrial Management Indicator Species (MIS), Boise National Forest, 
Payette National Forest and Sawtooth National Forest, Forest Plan 
Revision, Implementation, Several Counties, ID; Malhaur County, OR and 
Box Elder County, UT, Comment Period Ends: 08/30/2007, Contact: Sharon 
LaBrecque 208-737-3200.
EIS No. 20070217, Final EIS, CDB, NY, East River Waterfront Esplanade 
and Piers Project, Revitalization, Connecting Whitehall Ferry Terminal 
and Peter Minuit Plaza to East River Park, Funding New York, NY, Wait 
Period Ends: 07/02/2007, Contact: Irene Chang 212-962-2300.
EIS No. 20070218, Draft EIS, FHW, CA, Interstate 405 (San Diego 
Freeway) Sepulveda Pass Widening Project, From Interstate 10 to US-101 
in the City of Los Angeles, Los Angeles County, CA, Comment Period 
Ends: 07/16/2007, Contact: Steve Healow 916-498-5849.
EIS No. 20070219, Final EIS, AFS, 00, Norwood Project, Proposes to 
Implement Multiple Resource Management Actions, Black Hills National 
Forest, Hell Canyon Ranger District, Pennington County, SD and Weston 
and Crook Counties, WY, Wait Period Ends: 07/02/2007, Contact: Kelly 
Honors 605-673-4853.

Amended Notices

EIS No. 20070069, Second Final Supplement, FHW, WV, Appalachian 
Corridor H Project, Construction of a 9-mile Long Segment between the 
Termini of Parsons and Davis, Updated Information the Parsons-to-Davis 
Project, Funding and U.S. Army COE Section 404 Permit Issuance, Tucker 
County, WV, Wait Period Ends: 08/01/2007, Contact: Thomas J. Smith 304-
347-5928. Revision to FR Notice Published 03/02/2007: Reopen and 
Extending Comment Period from 4/27/2007 to August 1, 2007.

    Dated: May 29, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA Compliance Division, Office 
of Federal Activities.
[FR Doc. E7-10593 Filed 5-31-07; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.