Environmental Impacts Statements; Notice of Availability, 29314-29315 [E7-10131]

Download as PDF 29314 Federal Register / Vol. 72, No. 101 / Friday, May 25, 2007 / Notices closely with the permitting agencies and state environmental agencies to minimize impacts from these activities. EIS No. 20070128, ERP No. F–AFS– L65511–ID, Myrtle Creek Healthy Forest Restoration Act Project, Proposes Aquatic and Vegetation Improvement Treatments, Panhandle National Forests, Bonners Ferry Ranger District, City of Bonners Ferry, Boundary County, ID. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20070135, ERP No. F–AFS– L65507–ID, White/White Analysis Project, Preferred Alternative is 4, Vegetative Management and Watershed Improvement, Lolo Creek, Chamook Creek, White Creek, Mike White Creek, Nevada Creek, and Utah Creek, Lochsa Ranger District, Clearwater National Forest, Idaho and Clearwater County, ID. Summary: While EPA supports the proposed watershed improvement activities, we have continued concerns related to 303(d) listed streams. EPA recommends implementing BMPs for other activities such as grazing and placer mining to improve aquatic habitat and water quality. EIS No. 20070137, ERP No. F–AFS– L65482–ID, Aspen Range Timber Sale and Vegetation Treatment Project, Preferred Alternative is 5, Proposal to Treat Forested and Nonforested Vegetation, Caribou-Targhee National Forest, Soda Springs Ranger District, Caribou County, ID. jlentini on PROD1PC65 with NOTICES Summary: EPA has no objections to the proposed project. EIS No. 20070095, ERP No. FS–AFS– L65383–ID, Hidden Cedar Project, Updated Information, Manage Vegetation Conditions and the Transportation System, Idaho Panhandle National Forests, St. Joe Ranger District, Benewah, Latah and Shoshone Counties, ID. Summary: EPA previous water quality issues have been resolved; therefore, EPA has no objection to the proposed action. Dated: May 22, 2007. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. E7–10132 Filed 5–24–07; 8:45 am] BILLING CODE 6560–50–P VerDate Aug<31>2005 17:34 May 24, 2007 Jkt 211001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6687–2] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 05/14/2007 through 05/18/2007 Pursuant to 40 CFR 1506.9. EIS No. 20070194, Final EIS, AFS, ID, Payette National Forest Travel Management Plan, Designate a System of Roads, Trails and Areas Open to Motorized and Non-Motorized Use, Implementation, Adam, Washington, Idaho, Valley Counties, ID, Wait Period Ends: 06/25/2007, Contact: Bill Gamble 208–253–0100. EIS No. 20070195, Final EIS, AFS, AK, Traitors Cove Timber Sale Project, Timber Harvest and Road Construction, Implementation, Revillagigedo Island, Ketchikan-Misty Fiords Ranger District, Tongass National Forest, AK, Wait Period Ends: 06/25/2007, Contact: Rob Reeck 907–228–4114. EIS No. 20070196, Draft EIS, AFS, AK, Angoon Hydroeletric Project, Construction and Operation, SpecialUse-Authorization, Thayer Creek, Admiralty Island National Monument, Tongass National Forest, AK, Comment Period Ends: 07/09/2007, Contact: Kathy Rodriquez 907–790– 7472. EIS No. 20070197, Revised Draft EIS, AFS, CA, Phoenix Project, Proposes to Use a Combination of Contract and Forest Service Crew to Treat Poor Forest Health and High Fire Hazard Conditions, Develop a Network Defensible Fuel Profile Zones (DFPZs), Sierraville Ranger District, Tahoe National Forest, Sierra and Nevada Counties, CA, Comment Period Ends: 07/09/2007, Contact: Jeff Leach 530–994–3401 Ext 6680. EIS No. 20070198, Final EIS, HUD, WA, Westpark Redevelopment Master Plan, Redevelop of 82-acre Site to create a Mixed-Use, Mixed-Income Pedestrian Oriented Urban Community, Funding and U.S. Army COE Section 10 Permit, City of Bremerton, Kitsap County, WA, Wait Period Ends: 06/25/2007, Contact: Andrea Spencer 360–473–5283. EIS No. 20070199, Final EIS, FHW, NC, Wilmington Bypass Transportation Improvements, U.S. 17 to U.S. 421, Funding, COE Section 10 and 404 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Permits and U.S. Coast Guard Bridge Permit Issuance, Brunswick and New Hanover Counties, NC, Wait Period Ends: 06/25/2007 Contact: John F. Sullivan 919–856–4346-Ext 122. EIS No. 20070200, Draft EIS, AFS, WI, Fishel Vegetation and Transportation Management Project, To Implement Land Management Activities, Eagle River-Florence Ranger District, Chequamegor-Nicolet National Forest, Forest and Vilas Counties, WI, Comment Period Ends: 07/09/2007, Contact: Lois Pfeffer 559–359–7023. EIS No. 20070201, Final EIS, FHW, 00, U.S. 59—Amelia Earhart Memorial Bridge over the Missouri River, Construction from Atchison, Kansas to U.S. 59/State Route 45 Intersection, U.S. Coast Guard Section 9 Permit and U.S. Army COE Section 10 and 404 Permits, Atchison, KS and Buchanan County, MO, Wait Period Ends: 06/25/2007, Contact: John Knowles 785–271–2448 Ext 211. EIS No. 20070202, Final EIS, AFS, ID, South Fork Salmon River Subbasin Noxious and Invasive Weed Management Program, Implementation, Krassel and McCall Ranger Districts, Payette National Forest and Cascade Ranger District, Valley and Idaho Counties, ID, Wait Period Ends: 06/25/2007, Contact: Dan Anderson 208–634–0435. EIS No. 20070203, Final EIS, AFS, CO, Robin Redbreast Unpatented Lode Claim Mining Plan of Operations, Implementation, U.S. Army COE Section 404 Permit, Located above the Middle Fork of the Cimarron River within the Uncompahgre Wilderness, Ouray Ranger District, Grand Mesa, Uncompahgre and Gunnison National Forests, Hinsdale County, CO, Wait Period Ends: 06/25/2007, Contact: Jeff Burch 970–874–6649. EIS No. 20070204, Final EIS, FRC, CA, Oroville Facilities Project, Issuing an New Federal License to Continue Hydroelectric Power (FERC No. 2100), Feather River, Sierra Nevada, Butte County, CA, Wait Period Ends: 06/25/ 2007, Contact: James Fargo 202–502– 6095. Amended Notices EIS No. 20070158, Final EIS, FAA, AK, Juneau International Airport, Proposed Development Activities to Enhance Operations Safety, Facilitate Aircraft Alignment, U.S. Army COE Section 404 Permit, City and Borough of Juneau, AK, Wait Period Ends: 06/ 11/2007, Contact: Patti Sullivan 907– 271–5454. Revision to FR Notice Published 04/27/ 2007: Correction to Wait Period from 05/29/2007 to 06/11/2007. E:\FR\FM\25MYN1.SGM 25MYN1 Federal Register / Vol. 72, No. 101 / Friday, May 25, 2007 / Notices EIS No. 20070168, Draft EIS, FTA, CA, Alameda-Contra Transit (AC Transit) East Bay Bus Rapid Transit Project, Improve Transit Serve in cities of Berkeley, Oakland and San Leandro, San Francisco Bay Area, Alameda County, CA, Comment Period Ends: 07/03/2007, Contact: Lucinda Eagle 415–744–3133. Revision of FR Notice Published 05/04/ 2007: Extending Comment Period from 6/18/2007 to 07/03/2007. Dated: 05/22/2007. Ken Mittelholtz, Environmental Protection Specialist, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–10131 Filed 5–24–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2004–0369; FRL–8121–6] Chloroneb; Notice of Receipt of Request to Voluntarily Terminate Certain Uses of Pesticide Registrations Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: In accordance with section 6(f)(1) of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), as amended, EPA is issuing a notice of receipt of a request by the registrant to voluntarily terminate certain uses of its chloroneb products. The request would terminate chloroneb’s use on all seed treatment. The request would not terminate the last chloroneb product registered in the United States. EPA intends to grant this request at the close of the comment period for this announcement unless the Agency receives substantive comments within the comment period that would merit its further review of the request, or unless the registrant withdraws its request within this period. Upon acceptance of this request, any sale, distribution, or use of products listed in this notice will be permitted only if such sale, distribution, or use is consistent with the terms as described in the final order. DATES: Comments must be received on or before June 25, 2007. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPP–2004–0369, by one of the following methods: •Federal rulemaking Portal: https:// www.regulations.gov. Follow the on-line instructions for submitting comments. jlentini on PROD1PC65 with NOTICES SUMMARY: VerDate Aug<31>2005 17:34 May 24, 2007 Jkt 211001 • Mail: Office of Pesticide Programs (OPP) Regulatory Public Docket (7502P), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001. • Delivery: OPP Regulatory Public Docket (7502P), Environmental Protection Agency, Rm. S–4400, One Potomac Yard (South Bldg.), 2777 S. Crystal Dr., Arlington, VA. Deliveries are only accepted during the Docket’s normal hours of operation (8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays). Special arrangements should be made for deliveries of boxed information. The Docket telephone number is (703) 305– 5805. Instructions: Direct your comments to docket ID number EPA–HQ–OPP–2004– 0369. EPA’s policy is that all comments received will be included in the docket without change and may be made available on-line at https:// www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through regulations.gov or email. The Federal regulations.gov website is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an e-mail comment directly to EPA without going through regulations.gov, your email address will be automatically captured and included as part of the comment that is placed in the docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD-ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. Docket: All documents in the docket are listed in the docket index available in regulations.gov. To access the electronic docket, go to https:// www.regulations.gov, select ‘‘Advanced Search,’’ then ‘‘Docket Search.’’ Insert the docket ID number where indicated and select the ‘‘Submit’’ button. Follow the instructions on the regulations.gov web site to view the docket index or access available documents. Although PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 29315 listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either in the electronic docket at https:// www.regulations.gov, or, if only available in hard copy, at the OPP Regulatory Public Docket in Rm. S– 4400, One Potomac Yard (South Bldg.), 2777 S. Crystal Dr., Arlington, VA. The hours of operation of this Docket Facility are from 8:30 a.m. to 4 p.m., Monday through Friday, excluding legal holidays. The Docket Facility telephone number is (703) 305–5805. FOR FURTHER INFORMATION CONTACT: Wilhelmena Livingston, Special Review and Reregistration Division (7508P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460–0001; telephone number: (703) 308–8025; fax number: (703) 308– 8005; e-mail address: livingston.wilhelmena@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this Action Apply to Me? This action is directed to the public in general, and may be of interest to a wide range of stakeholders including environmental, human health, and agricultural advocates; the chemical industry; pesticide users; and members of the public interested in the sale, distribution, or use of pesticides. Since others also may be interested, the Agency has not attempted to describe all the specific entities that may be affected by this action. If you have any questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT. B. What Should I Consider as I Prepare My Comments for EPA? 1. Submitting CBI. Do not submit this information to EPA through regulations.gov or e-mail. Clearly mark the part or all of the information that you claim to be CBI. For CBI information in a disk or CD ROM that you mail to EPA, mark the outside of the disk or CD ROM as CBI and then identify electronically within the disk or CD ROM the specific information that is claimed as CBI. In addition to one complete version of the comment that includes information claimed as CBI, a copy of the comment that does not contain the information claimed as CBI E:\FR\FM\25MYN1.SGM 25MYN1

Agencies

[Federal Register Volume 72, Number 101 (Friday, May 25, 2007)]
[Notices]
[Pages 29314-29315]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-10131]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6687-2]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 05/14/2007 through 05/18/2007
Pursuant to 40 CFR 1506.9.

EIS No. 20070194, Final EIS, AFS, ID, Payette National Forest Travel 
Management Plan, Designate a System of Roads, Trails and Areas Open to 
Motorized and Non-Motorized Use, Implementation, Adam, Washington, 
Idaho, Valley Counties, ID, Wait Period Ends: 06/25/2007, Contact:
    Bill Gamble 208-253-0100.
EIS No. 20070195, Final EIS, AFS, AK, Traitors Cove Timber Sale 
Project, Timber Harvest and Road Construction, Implementation, 
Revillagigedo Island, Ketchikan-Misty Fiords Ranger District, Tongass 
National Forest, AK, Wait Period Ends: 06/25/2007, Contact: Rob Reeck 
907-228-4114.
EIS No. 20070196, Draft EIS, AFS, AK, Angoon Hydroeletric Project, 
Construction and Operation, Special-Use-Authorization, Thayer Creek, 
Admiralty Island National Monument, Tongass National Forest, AK, 
Comment Period Ends: 07/09/2007, Contact: Kathy Rodriquez 907-790-7472.
EIS No. 20070197, Revised Draft EIS, AFS, CA, Phoenix Project, Proposes 
to Use a Combination of Contract and Forest Service Crew to Treat Poor 
Forest Health and High Fire Hazard Conditions, Develop a Network 
Defensible Fuel Profile Zones (DFPZs), Sierraville Ranger District, 
Tahoe National Forest, Sierra and Nevada Counties, CA, Comment Period 
Ends: 07/09/2007, Contact: Jeff Leach 530-994-3401 Ext 6680.
EIS No. 20070198, Final EIS, HUD, WA, Westpark Redevelopment Master 
Plan, Redevelop of 82-acre Site to create a Mixed-Use, Mixed-Income 
Pedestrian Oriented Urban Community, Funding and U.S. Army COE Section 
10 Permit, City of Bremerton, Kitsap County, WA, Wait Period Ends: 06/
25/2007, Contact: Andrea Spencer 360-473-5283.
EIS No. 20070199, Final EIS, FHW, NC, Wilmington Bypass Transportation 
Improvements, U.S. 17 to U.S. 421, Funding, COE Section 10 and 404 
Permits and U.S. Coast Guard Bridge Permit Issuance, Brunswick and New 
Hanover Counties, NC, Wait Period Ends: 06/25/2007 Contact: John F. 
Sullivan 919-856-4346-Ext 122.
EIS No. 20070200, Draft EIS, AFS, WI, Fishel Vegetation and 
Transportation Management Project, To Implement Land Management 
Activities, Eagle River-Florence Ranger District, Chequamegor-Nicolet 
National Forest, Forest and Vilas Counties, WI, Comment Period Ends: 
07/09/2007, Contact: Lois Pfeffer 559-359-7023.
EIS No. 20070201, Final EIS, FHW, 00, U.S. 59--Amelia Earhart Memorial 
Bridge over the Missouri River, Construction from Atchison, Kansas to 
U.S. 59/State Route 45 Intersection, U.S. Coast Guard Section 9 Permit 
and U.S. Army COE Section 10 and 404 Permits, Atchison, KS and Buchanan 
County, MO, Wait Period Ends: 06/25/2007, Contact: John Knowles 785-
271-2448 Ext 211.
EIS No. 20070202, Final EIS, AFS, ID, South Fork Salmon River Subbasin 
Noxious and Invasive Weed Management Program, Implementation, Krassel 
and McCall Ranger Districts, Payette National Forest and Cascade Ranger 
District, Valley and Idaho Counties, ID, Wait Period Ends: 06/25/2007, 
Contact: Dan Anderson 208-634-0435.
EIS No. 20070203, Final EIS, AFS, CO, Robin Redbreast Unpatented Lode 
Claim Mining Plan of Operations, Implementation, U.S. Army COE Section 
404 Permit, Located above the Middle Fork of the Cimarron River within 
the Uncompahgre Wilderness, Ouray Ranger District, Grand Mesa, 
Uncompahgre and Gunnison National Forests, Hinsdale County, CO, Wait 
Period Ends: 06/25/2007, Contact: Jeff Burch 970-874-6649.
EIS No. 20070204, Final EIS, FRC, CA, Oroville Facilities Project, 
Issuing an New Federal License to Continue Hydroelectric Power (FERC 
No. 2100), Feather River, Sierra Nevada, Butte County, CA, Wait Period 
Ends: 06/25/2007, Contact: James Fargo 202-502-6095.

Amended Notices

EIS No. 20070158, Final EIS, FAA, AK, Juneau International Airport, 
Proposed Development Activities to Enhance Operations Safety, 
Facilitate Aircraft Alignment, U.S. Army COE Section 404 Permit, City 
and Borough of Juneau, AK, Wait Period Ends: 06/11/2007, Contact: Patti 
Sullivan 907-271-5454.
Revision to FR Notice Published 04/27/2007: Correction to Wait Period 
from 05/29/2007 to 06/11/2007.


[[Page 29315]]


EIS No. 20070168, Draft EIS, FTA, CA, Alameda-Contra Transit (AC 
Transit) East Bay Bus Rapid Transit Project, Improve Transit Serve in 
cities of Berkeley, Oakland and San Leandro, San Francisco Bay Area, 
Alameda County, CA, Comment Period Ends: 07/03/2007, Contact: Lucinda 
Eagle 415-744-3133.
Revision of FR Notice Published 05/04/2007: Extending Comment Period 
from 6/18/2007 to 07/03/2007.

    Dated: 05/22/2007.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA Compliance Division, Office 
of Federal Activities.
[FR Doc. E7-10131 Filed 5-24-07; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.