Bost5 Hydroelectric LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests and Comments, 29159-29160 [E7-9998]
Download as PDF
Federal Register / Vol. 72, No. 100 / Thursday, May 24, 2007 / Notices
comment date for the particular
application.
t. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE
OF INTENT’’, or ‘‘COMPETING
APPLICATION’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
u. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
v. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–9997 Filed 5–23–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–12758–000]
Bost5 Hydroelectric LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene,
Protests and Comments
rmajette on PROD1PC67 with NOTICES
May 17, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12758–000.
c. Date Filed: December 12, 2006.
d. Applicant: Bost5 Hydroelectric
LLC.
VerDate Aug<31>2005
15:52 May 23, 2007
Jkt 211001
e. Name of Project: Red River Lock &
Dam No. 5 Hydroelectric Project.
f. Location: The proposed project
would utilize the existing U.S. Army
Corps of Engineers Red River Lock &
Dam #5 and would be located on the
Red River in Bossier Parish, Louisiana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Robert
Larson, Bost5 Hydroelectric LLC, c/o
Gray, Plant, Mooty, Mooty, & Bennett,
80 South 8th Street, Suite 500,
Minneapolis, MN 55402, (612) 632–
3355.
i. FERC Contact: Patricia W. Gillis at
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
k. All documents (original and eight
copies) should be filed with: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. Please include
the project number (P–12758–000) on
any comments, protests, or motions
filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
l. Description of Project: The proposed
project would use the existing U.S.
Army Corps of Engineers’ Red River
Lock and Dam No. 5 and consist of: (1)
Five proposed penstocks; (2) a proposed
powerhouse containing five generating
units with a total installed capacity of
19.8-megawatts; (3) a proposed 300-footlong, 14.7-kilovolt transmission line;
and (4) appurtenant facilities. The
proposed project would have an
estimated annual generation of
approximately 121-gigawatt-hours. The
applicant plans to sell the generated
energy to a local utility.
m. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
29159
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
p. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
q. Notice of Intent—a notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
r. Proposed Scope of Studies under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
E:\FR\FM\24MYN1.SGM
24MYN1
rmajette on PROD1PC67 with NOTICES
29160
Federal Register / Vol. 72, No. 100 / Thursday, May 24, 2007 / Notices
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
s. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
t. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE
OF INTENT’’, or ‘‘COMPETING
APPLICATION’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
u. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
v. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at
https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–9998 Filed 5–23–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
15:52 May 23, 2007
Jkt 211001
Notice.
DEPARTMENT OF ENERGY
ACTION:
Federal Energy Regulatory
Commission
SUMMARY: In compliance with the
Paperwork Reduction Act (PRA) (44
U.S.C. 3501 et seq.), this document
announces that an Information
Collection Request (ICR) has been
forwarded to the Office of Management
and Budget (OMB) for review and
approval. This is a request to renew an
existing approved collection. The ICR,
which is abstracted below, describes the
nature of the information collection and
its estimated burden and cost.
DATES: Additional comments must be
submitted on or before June 25, 2007.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
OAR–2006–0947, to (1) EPA online
using www.regulations.gov (our
preferred method), by e-mail to a-andr-docket@epamail.epa.gov, or by mail
to: EPA Docket Center, Environmental
Protection Agency, Air and Radiation
Docket and Information Center,
Environmental Protection Agency,
Mailcode: 6102T, 1200 Pennsylvania
Ave., NW., Washington, DC 20460, and
(2) OMB by mail to: Office of
Information and Regulatory Affairs,
Office of Management and Budget
(OMB), Attention: Desk Officer for EPA,
725 17th Street, NW., Washington, DC
20503.
FOR FURTHER INFORMATION CONTACT:
Kenon Smith,, Clean Air Markets
Division, Office of Air and Radiation,
(6204J), Environmental Protection
Agency, 1200 Pennsylvania Ave., NW.,
Washington, DC 20460; telephone
number: 202–343–9164; fax number:
202–343–2361; e-mail address:
smith.kenon@epa.gov.
SUPPLEMENTARY INFORMATION: EPA has
submitted the following ICR to OMB for
review and approval according to the
procedures prescribed in 5 CFR 1320.12.
On December 6, 2006 (71 FR 70756),
EPA sought comments on this ICR
pursuant to 5 CFR 1320.8(d). EPA
received no comments during the
comment period. Any additional
comments on this ICR should be
submitted to EPA and OMB within 30
days of this notice.
EPA has established a public docket
for this ICR under Docket ID No. EPA–
HQ–OAR–2006–0947, which is
available for online viewing at
www.regulations.gov, or in person
viewing at the Air and Radiation Docket
in the EPA Docket Center (EPA/DC),
EPA West, Room 3334, 1301
Constitution Ave., NW., Washington,
DC. The EPA/DC Public Reading Room
is open from 8 a.m. to 4:30 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
Notice of Filing Deadline Extension for
the FERC Form 714 ‘‘Annual Electric
Balancing Authority Area and Planning
Area Report’’ and Availability of
Electronic Submission Software
May 18, 2007.
Take notice that the filing deadline for
the FERC Form 714, reporting 2006
data, is extended to July 16, 2007, for all
respondents. The extension is granted to
allow the respondents additional time to
prepare their initial electronic filing of
the form. Electronic filing of Form 714
became mandatory on April 19, 2007,
through Commission Order No. 695
(https://www.ferc.gov/whats-new/commmeet/2007/041907/E-14.pdf).
Software, necessary for the
submission of the form, is available for
download free from the Commission’s
Web site at https://www.ferc.gov/docsfiling/eforms/form-714/elec-submsoft.asp. A Personal Identification
Number (PIN) is necessary to download
the respondent’s initial database and to
use as an electronic signature in
submitting Form 714 filings to the
Commission. PINs will be e-mailed to
each 2005 Form 714 contact person of
record. Those who do not receive their
PIN by close of business on May 23,
2007, should e-mail the legal name of
the respondent and a contact person’s
name and E-mail address to
form714@ferc.gov.
More information on the Form 714
filing requirements can be found on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/
eforms.asp#714 and questions about the
form can be e-mailed to
form714@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–9985 Filed 5–23–07; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2006–0947, FRL 8317–4]
Agency Information Collection
Activities: Submission to OMB for
Review and Approval; Comment
Request; NOX Budget Trading Program
to Reduce the Regional Transport of
Ozone, EPA ICR Number 1857.04, OMB
Control Number 2060–0445
Environmental Protection
Agency (EPA).
AGENCY:
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
E:\FR\FM\24MYN1.SGM
24MYN1
Agencies
[Federal Register Volume 72, Number 100 (Thursday, May 24, 2007)]
[Notices]
[Pages 29159-29160]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-9998]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-12758-000]
Bost5 Hydroelectric LLC; Notice of Application Accepted for
Filing and Soliciting Motions To Intervene, Protests and Comments
May 17, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12758-000.
c. Date Filed: December 12, 2006.
d. Applicant: Bost5 Hydroelectric LLC.
e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric
Project.
f. Location: The proposed project would utilize the existing U.S.
Army Corps of Engineers Red River Lock & Dam 5 and would be
located on the Red River in Bossier Parish, Louisiana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Robert Larson, Bost5 Hydroelectric LLC,
c/o Gray, Plant, Mooty, Mooty, & Bennett, 80 South 8th Street, Suite
500, Minneapolis, MN 55402, (612) 632-3355.
i. FERC Contact: Patricia W. Gillis at (202) 502-8735.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
k. All documents (original and eight copies) should be filed with:
The Secretary, Federal Energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426. Please include the project number (P-12758-
000) on any comments, protests, or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
l. Description of Project: The proposed project would use the
existing U.S. Army Corps of Engineers' Red River Lock and Dam No. 5 and
consist of: (1) Five proposed penstocks; (2) a proposed powerhouse
containing five generating units with a total installed capacity of
19.8-megawatts; (3) a proposed 300-foot-long, 14.7-kilovolt
transmission line; and (4) appurtenant facilities. The proposed project
would have an estimated annual generation of approximately 121-
gigawatt-hours. The applicant plans to sell the generated energy to a
local utility.
m. Location of Application: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
p. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
q. Notice of Intent--a notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
r. Proposed Scope of Studies under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis,
[[Page 29160]]
preparation of preliminary engineering plans, and a study of
environmental impacts. Based on the results of these studies, the
Applicant would decide whether to proceed with the preparation of a
development application to construct and operate the project.
s. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
t. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTEST'',
``MOTION TO INTERVENE'', ``NOTICE OF INTENT'', or ``COMPETING
APPLICATION'', as applicable, and the Project Number of the particular
application to which the filing refers. Any of the above-named
documents must be filed by providing the original and the number of
copies provided by the Commission's regulations to: The Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
u. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
v. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-9998 Filed 5-23-07; 8:45 am]
BILLING CODE 6717-01-P