Download as PDF 29158 Federal Register / Vol. 72, No. 100 / Thursday, May 24, 2007 / Notices A copy of the application may be obtained by agencies directly from the applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. v. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E7–9996 Filed 5–23–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12757–000] Bost4 Hydroelectric LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests and Comments rmajette on PROD1PC67 with NOTICES May 17, 2007. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12757–000. c. Date Filed: December 12, 2006. d. Applicant: Bost4 Hydroelectric LLC. e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would utilize the existing U.S. Army Corps of Engineers’ Red River Lock & Dam #4 and would be located on the Red River in Red River Parish, Louisiana. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Robert Larson, Bost4 Hydroelectric LLC, c/o Gray, Plant, Mooty, Mooty, & Bennett, 80 South 8th Street, Suite 500, Minneapolis, MN 55402, (612) 632– 3355. i. FERC Contact: Patricia W. Gillis at (202) 502–8735. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. k. All documents (original and eight copies) should be filed with the VerDate Aug<31>2005 15:52 May 23, 2007 Jkt 211001 Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P–12757–000) on any comments, protests, or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. l. Description of Project: The proposed project would use the existing U.S. Army Corps of Engineers’ Red River Lock and Dam No. 4 and consist of: (1) Five proposed penstocks; (2) a proposed powerhouse containing five generating units with a total installed capacity of 27-megawatts; (3) a proposed 500-footlong, 14.7-kilovolt transmission line; and (4) appurtenant facilities. The proposed project would have an estimated annual generation of approximately 166-gigawatt-hours. The applicant plans to sell the generated energy to a local utility. m. Location of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. p. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. q. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. r. Proposed Scope of Studies under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. s. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified E:\FR\FM\24MYN1.SGM 24MYN1 Federal Register / Vol. 72, No. 100 / Thursday, May 24, 2007 / Notices comment date for the particular application. t. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT’’, or ‘‘COMPETING APPLICATION’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. u. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. v. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E7–9997 Filed 5–23–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P–12758–000] Bost5 Hydroelectric LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests and Comments rmajette on PROD1PC67 with NOTICES May 17, 2007. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12758–000. c. Date Filed: December 12, 2006. d. Applicant: Bost5 Hydroelectric LLC. VerDate Aug<31>2005 15:52 May 23, 2007 Jkt 211001 e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would utilize the existing U.S. Army Corps of Engineers Red River Lock & Dam #5 and would be located on the Red River in Bossier Parish, Louisiana. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Robert Larson, Bost5 Hydroelectric LLC, c/o Gray, Plant, Mooty, Mooty, & Bennett, 80 South 8th Street, Suite 500, Minneapolis, MN 55402, (612) 632– 3355. i. FERC Contact: Patricia W. Gillis at (202) 502–8735. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. k. All documents (original and eight copies) should be filed with: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P–12758–000) on any comments, protests, or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. l. Description of Project: The proposed project would use the existing U.S. Army Corps of Engineers’ Red River Lock and Dam No. 5 and consist of: (1) Five proposed penstocks; (2) a proposed powerhouse containing five generating units with a total installed capacity of 19.8-megawatts; (3) a proposed 300-footlong, 14.7-kilovolt transmission line; and (4) appurtenant facilities. The proposed project would have an estimated annual generation of approximately 121-gigawatt-hours. The applicant plans to sell the generated energy to a local utility. m. Location of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 29159 Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. p. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. q. Notice of Intent—a notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. r. Proposed Scope of Studies under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, E:\FR\FM\24MYN1.SGM 24MYN1

Agencies

[Federal Register Volume 72, Number 100 (Thursday, May 24, 2007)]
[Notices]
[Pages 29158-29159]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-9997]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12757-000]


Bost4 Hydroelectric LLC; Notice of Application Accepted for 
Filing and Soliciting Motions To Intervene, Protests and Comments

May 17, 2007.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: 12757-000.
    c. Date Filed: December 12, 2006.
    d. Applicant: Bost4 Hydroelectric LLC.
    e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric 
Project.
    f. Location: The proposed project would utilize the existing U.S. 
Army Corps of Engineers' Red River Lock & Dam 4 and would be 
located on the Red River in Red River Parish, Louisiana.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Robert Larson, Bost4 Hydroelectric LLC, 
c/o Gray, Plant, Mooty, Mooty, & Bennett, 80 South 8th Street, Suite 
500, Minneapolis, MN 55402, (612) 632-3355.
    i. FERC Contact: Patricia W. Gillis at (202) 502-8735.
    j. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    k. All documents (original and eight copies) should be filed with 
the Secretary, Federal Energy Regulatory Commission, 888 First Street, 
NE., Washington, DC 20426. Please include the project number (P-12757-
000) on any comments, protests, or motions filed.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency. A copy 
of any motion to intervene must also be served upon each representative 
of the Applicant specified in the particular application.
    l. Description of Project: The proposed project would use the 
existing U.S. Army Corps of Engineers' Red River Lock and Dam No. 4 and 
consist of: (1) Five proposed penstocks; (2) a proposed powerhouse 
containing five generating units with a total installed capacity of 27-
megawatts; (3) a proposed 500-foot-long, 14.7-kilovolt transmission 
line; and (4) appurtenant facilities. The proposed project would have 
an estimated annual generation of approximately 166-gigawatt-hours. The 
applicant plans to sell the generated energy to a local utility.
    m. Location of Application: A copy of the application is available 
for inspection and reproduction at the Commission in the Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item h 
above.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Competing Preliminary Permit--Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the particular application (see 18 CFR 4.36). 
Submission of a timely notice of intent allows an interested person to 
file the competing preliminary permit application no later than 30 days 
after the specified comment date for the particular application. A 
competing preliminary permit application must conform with 18 CFR 
4.30(b) and 4.36.
    p. Competing Development Application--Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    q. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    r. Proposed Scope of Studies under Permit--A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    s. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified

[[Page 29159]]

comment date for the particular application.
    t. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', 
``MOTION TO INTERVENE'', ``NOTICE OF INTENT'', or ``COMPETING 
APPLICATION'', as applicable, and the Project Number of the particular 
application to which the filing refers. Any of the above-named 
documents must be filed by providing the original and the number of 
copies provided by the Commission's regulations to: The Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. A copy of any motion to intervene must also be 
served upon each representative of the Applicant specified in the 
particular application.
    u. Agency Comments--Federal, State, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    v. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.