Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status, 28481 [E7-9684]
Download as PDF
28481
Federal Register / Vol. 72, No. 97 / Monday, May 21, 2007 / Notices
under 18 CFR Part 34 of all future
issuances of securities and assumptions
of liability by El Segundo.
On May 11, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by El Segundo should file a
protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is June 11,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, El Segundo is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of El
Segundo, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of El Segundo’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–9677 Filed 5–18–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator or Foreign Utility
Company Status
May 11, 2007.
Docket Nos.
North Wind Cooperative ......................................................................................................................................................................
Besicorp-Empire Power Company, LLC ..............................................................................................................................................
Post Oak Wind, LLC ............................................................................................................................................................................
Bullard Energy Center, LLC ................................................................................................................................................................
Diablo Winds, LLC ...............................................................................................................................................................................
Panoche Energy Center, LLC .............................................................................................................................................................
Spectra Energy Corporation & Union Gas Limited .............................................................................................................................
AES TEG/TEP Holding B.V .................................................................................................................................................................
Airtricity Holdings Ltd. ..........................................................................................................................................................................
Generadora Montecristo S.A., Enel Guatemala S.A ...........................................................................................................................
Take notice that during the month of
April 2007, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a).
Kimberly D. Bose,
Secretary.
[FR Doc. E7–9684 Filed 5–18–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Environmental, LLC (Rainer) for a
preliminary permit under section 4(f) of
the Federal Power Act 1 to study the
proposed Tapps Lake Dam
Hydroelectric Project No. 12767, to be
located at Puget Sound Energy, Inc.’s
Lake Tapps Dam on the White River in
Sumner, Pierce County, Washington.
The application was rejected for failure
to include a readable map showing a
project boundary enclosing all proposed
project facilities.2 On April 19, 2007,
Rainier requested rehearing of the
Commission’s decision to reject their
application.
Rainer does not attribute any errors to
staff’s rejection of its application, but
instead proffers assertedly appropriate
pwalker on PROD1PC71 with NOTICES
[Project No. 12767–001]
Rainier Engineering and
Environmental, LLC; Notice Rejecting
Filing
May 11, 2007.
On March 20, 2007, Commission staff
rejected the application, filed November
13, 2006, by Rainier Engineering and
VerDate Aug<31>2005
15:57 May 18, 2007
Jkt 211001
1 16
U.S.C. 797(f) (2000).
18 CFR 4.81(d) (2006). By letter issued
January 18, 2007, Commission staff notified Rainer
of the deficiency in its application and gave Rainer
45 days to file an appropriate map to cure the
deficiency. Rainier timely filed additional maps on
February 28, 2007. However, Commission staff’s
March 20, 2007 letter found that the newlysubmitted maps also failed to meet the
requirements of section 4.81(d).
2 See
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
EG07–36–000
EG07–37–000
EG07–38–000
EG07–39–000
EG07–40–000
FC07–7–000
FC07–8–000
FC07–9–000
FC07–10–000
FC07–11–000
maps to cure its application’s deficiency
and requests reconsideration of its
application in light of its new
submission.
Section 313(a) of the Federal Power
Act, 16 U.S.C. 825l, requires an
aggrieved party to file its request for
rehearing within 30 days after the
issuance of the Commission order and
to set forth specifically the ground or
grounds upon which such request is
based. Rainier’s rehearing request raises
no specific allegations of error with
respect to the staff’s order. Therefore, it
must be rejected.3
3 In addition, the pleading as filed is deficient
because it failed to include a Statement of Issues,
as required by Revision of Rules of Practice and
Procedure Regarding Issue Identification, Order No.
663, 70 FR 55,723 (September 23, 2005), FERC
Statutes and Regulations ¶ 31,193 (2005) as
amended by Order 663–A, effective March 23, 2006,
to limit its applicability to rehearing requests.
Revision of Rules of Practice and Procedure
Regarding Issue Identification, Order No. 663–A, 71
FR 14,640 (March 23, 2006), FERC Statutes and
Regulations ¶ 31,211 (2006) (codified at 18 CFR
385.203(a)(7) and 385.713(c)(2) (2006)).
E:\FR\FM\21MYN1.SGM
21MYN1
Agencies
[Federal Register Volume 72, Number 97 (Monday, May 21, 2007)]
[Notices]
[Page 28481]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-9684]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator or Foreign
Utility Company Status
May 11, 2007.
------------------------------------------------------------------------
Docket Nos.
------------------------------------------------------------------------
North Wind Cooperative.................................. EG07-36-000
Besicorp-Empire Power Company, LLC...................... EG07-37-000
Post Oak Wind, LLC...................................... EG07-38-000
Bullard Energy Center, LLC.............................. EG07-39-000
Diablo Winds, LLC....................................... EG07-40-000
Panoche Energy Center, LLC.............................. FC07-7-000
Spectra Energy Corporation & Union Gas Limited.......... FC07-8-000
AES TEG/TEP Holding B.V................................. FC07-9-000
Airtricity Holdings Ltd................................. FC07-10-000
Generadora Montecristo S.A., Enel Guatemala S.A......... FC07-11-000
------------------------------------------------------------------------
Take notice that during the month of April 2007, the status of the
above-captioned entities as Exempt Wholesale Generators or Foreign
Utility Companies became effective by operation of the Commission's
regulations. 18 CFR 366.7(a).
Kimberly D. Bose,
Secretary.
[FR Doc. E7-9684 Filed 5-18-07; 8:45 am]
BILLING CODE 6717-01-P