Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status, 28481 [E7-9684]

Download as PDF 28481 Federal Register / Vol. 72, No. 97 / Monday, May 21, 2007 / Notices under 18 CFR Part 34 of all future issuances of securities and assumptions of liability by El Segundo. On May 11, 2007, pursuant to delegated authority, the Director, Division of Tariffs and Market Development—West, granted the requests for blanket approval under Part 34 (Director’s Order). The Director’s Order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard concerning the blanket approvals of issuances of securities or assumptions of liability by El Segundo should file a protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing protests is June 11, 2007. Absent a request to be heard in opposition to such blanket approvals by the deadline above, El Segundo is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of El Segundo, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of El Segundo’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E7–9677 Filed 5–18–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator or Foreign Utility Company Status May 11, 2007. Docket Nos. North Wind Cooperative ...................................................................................................................................................................... Besicorp-Empire Power Company, LLC .............................................................................................................................................. Post Oak Wind, LLC ............................................................................................................................................................................ Bullard Energy Center, LLC ................................................................................................................................................................ Diablo Winds, LLC ............................................................................................................................................................................... Panoche Energy Center, LLC ............................................................................................................................................................. Spectra Energy Corporation & Union Gas Limited ............................................................................................................................. AES TEG/TEP Holding B.V ................................................................................................................................................................. Airtricity Holdings Ltd. .......................................................................................................................................................................... Generadora Montecristo S.A., Enel Guatemala S.A ........................................................................................................................... Take notice that during the month of April 2007, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Kimberly D. Bose, Secretary. [FR Doc. E7–9684 Filed 5–18–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Environmental, LLC (Rainer) for a preliminary permit under section 4(f) of the Federal Power Act 1 to study the proposed Tapps Lake Dam Hydroelectric Project No. 12767, to be located at Puget Sound Energy, Inc.’s Lake Tapps Dam on the White River in Sumner, Pierce County, Washington. The application was rejected for failure to include a readable map showing a project boundary enclosing all proposed project facilities.2 On April 19, 2007, Rainier requested rehearing of the Commission’s decision to reject their application. Rainer does not attribute any errors to staff’s rejection of its application, but instead proffers assertedly appropriate pwalker on PROD1PC71 with NOTICES [Project No. 12767–001] Rainier Engineering and Environmental, LLC; Notice Rejecting Filing May 11, 2007. On March 20, 2007, Commission staff rejected the application, filed November 13, 2006, by Rainier Engineering and VerDate Aug<31>2005 15:57 May 18, 2007 Jkt 211001 1 16 U.S.C. 797(f) (2000). 18 CFR 4.81(d) (2006). By letter issued January 18, 2007, Commission staff notified Rainer of the deficiency in its application and gave Rainer 45 days to file an appropriate map to cure the deficiency. Rainier timely filed additional maps on February 28, 2007. However, Commission staff’s March 20, 2007 letter found that the newlysubmitted maps also failed to meet the requirements of section 4.81(d). 2 See PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 EG07–36–000 EG07–37–000 EG07–38–000 EG07–39–000 EG07–40–000 FC07–7–000 FC07–8–000 FC07–9–000 FC07–10–000 FC07–11–000 maps to cure its application’s deficiency and requests reconsideration of its application in light of its new submission. Section 313(a) of the Federal Power Act, 16 U.S.C. 825l, requires an aggrieved party to file its request for rehearing within 30 days after the issuance of the Commission order and to set forth specifically the ground or grounds upon which such request is based. Rainier’s rehearing request raises no specific allegations of error with respect to the staff’s order. Therefore, it must be rejected.3 3 In addition, the pleading as filed is deficient because it failed to include a Statement of Issues, as required by Revision of Rules of Practice and Procedure Regarding Issue Identification, Order No. 663, 70 FR 55,723 (September 23, 2005), FERC Statutes and Regulations ¶ 31,193 (2005) as amended by Order 663–A, effective March 23, 2006, to limit its applicability to rehearing requests. Revision of Rules of Practice and Procedure Regarding Issue Identification, Order No. 663–A, 71 FR 14,640 (March 23, 2006), FERC Statutes and Regulations ¶ 31,211 (2006) (codified at 18 CFR 385.203(a)(7) and 385.713(c)(2) (2006)). E:\FR\FM\21MYN1.SGM 21MYN1

Agencies

[Federal Register Volume 72, Number 97 (Monday, May 21, 2007)]
[Notices]
[Page 28481]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-9684]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator or Foreign 
Utility Company Status

May 11, 2007.

------------------------------------------------------------------------
                                                            Docket Nos.
------------------------------------------------------------------------
North Wind Cooperative..................................     EG07-36-000
Besicorp-Empire Power Company, LLC......................     EG07-37-000
Post Oak Wind, LLC......................................     EG07-38-000
Bullard Energy Center, LLC..............................     EG07-39-000
Diablo Winds, LLC.......................................     EG07-40-000
Panoche Energy Center, LLC..............................      FC07-7-000
Spectra Energy Corporation & Union Gas Limited..........      FC07-8-000
AES TEG/TEP Holding B.V.................................      FC07-9-000
Airtricity Holdings Ltd.................................     FC07-10-000
Generadora Montecristo S.A., Enel Guatemala S.A.........     FC07-11-000
------------------------------------------------------------------------

    Take notice that during the month of April 2007, the status of the 
above-captioned entities as Exempt Wholesale Generators or Foreign 
Utility Companies became effective by operation of the Commission's 
regulations. 18 CFR 366.7(a).

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-9684 Filed 5-18-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.