Caledonia Energy Partners, L.L.C. Notice of Proposed Changes in FERC Gas Tariff, 27547 [E7-9361]

Download as PDF Federal Register / Vol. 72, No. 94 / Wednesday, May 16, 2007 / Notices by clicking on link number 3290. When you access the information collection, click on ‘‘Download Attachments’’ to view. Written requests for information should be addressed to U.S. Department of Education, 400 Maryland Avenue, SW., Potomac Center, 9th Floor, Washington, DC 20202–4700. Requests may also be electronically mailed to ICDocketMgr@ed.gov or faxed to 202– 245–6623. Please specify the complete title of the information collection when making your request. Comments regarding burden and/or the collection activity requirements should be electronically mailed to ICDocketMgr@ed.gov. Individuals who use a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1– 800–877–8339. [FR Doc. E7–9389 Filed 5–15–07; 8:45 am] Kimberly D. Bose, Secretary. [FR Doc. E7–9355 Filed 5–15–07; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Docket No. OA07–21–000] Federal Energy Regulatory Commission Attala Transmission LLC; Notice of Filing [Docket No. RP07–444–000] cprice-sewell on PROD1PC66 with NOTICES May 9, 2007. Take notice that on April 25, 2007, Attala Transmission LLC filed a letter to inform the Commission that it will not file revisions to its pro forma Open Access Transmission Tariff (OATT) because it has been granted a waiver of the requirement to file a OATT until it receives a request for service from an entity other than Entergy Mississippi, Inc., pursuant to Commission’s Order No. 890. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. VerDate Aug<31>2005 Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time May 30, 2007. 18:24 May 15, 2007 Jkt 211001 Caledonia Energy Partners, L.L.C. Notice of Proposed Changes in FERC Gas Tariff May 9, 2007. Take notice that on May 7, 2007, Caledonia Energy Partners, L.L.C. (Caledonia) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, the following tariff sheets, with an effective date of June 7, 2007: First Revised Sheet No. 19. Original Sheet No. 19A. First Revised Sheet No. 24. First Revised Sheet No. 50. Original Sheet No. 50A. First Revised Sheet No. 70. Caledonia states that the purpose of this filing is to submit substitute tariff sheets that will implement changes to its effective FERC Gas Tariff which Caledonia initially proposed to make to the pro forma tariff that was incorporated into its application for a certificate of public convenience and necessity under section 7 of the Natural Gas Act. Because Caledonia has commenced operations pursuant to Commission authorization, it now has an effective tariff. Consequently, Caledonia believes that any changes should be proposed to that tariff rather than the pro forma tariff. Caledonia PO 00000 Frm 00010 Fmt 4703 Sfmt 4703 27547 proposes June 7, 2007 as the effective date of its proposed tariff sheets. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–9361 Filed 5–15–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP05–15–006] Caledonia Energy Partners, L.L.C.; Notice of Compliance Filing May 9, 2007. Take notice that on May 2, 2007, Caledonia Energy Partners, L.L.C. E:\FR\FM\16MYN1.SGM 16MYN1

Agencies

[Federal Register Volume 72, Number 94 (Wednesday, May 16, 2007)]
[Notices]
[Page 27547]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-9361]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP07-444-000]


Caledonia Energy Partners, L.L.C. Notice of Proposed Changes in 
FERC Gas Tariff

May 9, 2007.
    Take notice that on May 7, 2007, Caledonia Energy Partners, L.L.C. 
(Caledonia) tendered for filing as part of its FERC Gas Tariff, 
Original Volume No. 1, the following tariff sheets, with an effective 
date of June 7, 2007:

First Revised Sheet No. 19.
Original Sheet No. 19A.
First Revised Sheet No. 24.
First Revised Sheet No. 50.
Original Sheet No. 50A.
First Revised Sheet No. 70.

    Caledonia states that the purpose of this filing is to submit 
substitute tariff sheets that will implement changes to its effective 
FERC Gas Tariff which Caledonia initially proposed to make to the pro 
forma tariff that was incorporated into its application for a 
certificate of public convenience and necessity under section 7 of the 
Natural Gas Act. Because Caledonia has commenced operations pursuant to 
Commission authorization, it now has an effective tariff. Consequently, 
Caledonia believes that any changes should be proposed to that tariff 
rather than the pro forma tariff. Caledonia proposes June 7, 2007 as 
the effective date of its proposed tariff sheets.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-9361 Filed 5-15-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.