Environmental Impact Statements and Regulations; Availability of EPA Comments, 26814 [E7-9138]
Download as PDF
26814
Federal Register / Vol. 72, No. 91 / Friday, May 11, 2007 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6686–8]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2007 (72 FR 17156).
Draft EISs
EIS No. 20070033, ERP No. D–FTA–
C54010–00, Access to the Region’s
Core Project, To Increase TransHudson Commuter Rail Capacity,
Improve System Safety and Reliability
between Secaucus Junction Station in
NJ and midtown Manhattan, Funding,
Hudson County, NJ and New York
County, NY.
Summary: EPA expressed
environmental concerns about impacts
to wetlands and air quality. EPA
recommends that FTA provides more
information on cumulative impacts as
well as a wetlands mitigation plan.
Rating EC2.
EIS No. 20070078, ERP No. D–NPS–
C61011–NY, Sagamore Hill National
Historic Site, General Management
Plan, Implementation, Oyster Bay,
Nassau County, NY.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20070097, ERP No. D–NOA–
A91075–00, Programmatic—Marine
Mammal Health and Stranding
Response Program (MMHSRP), Dayto-Day Operation on Stranding,
Response, Rehabilitation, Release, and
Disentanglement Activities.
Summary: EPA does not object to the
proposed project.
However, EPA did request that NMFS
clarify questions pertaining to water
quality, contaminants, and human
health. Rating LO.
ycherry on PROD1PC64 with NOTICES
Final EISs
EIS No. 20070057, ERP No. F–FHW–
E40763–NC, Winston-Salem Northern
Beltway, ( Eastern Section) U.S. 52
south to I–40 Business and I–40
Business south to U.S. 311,
Improvements to the Surface
Transportation Network, TIP Project
VerDate Aug<31>2005
21:09 May 10, 2007
Jkt 211001
Nos. U2579 and U–2579A, Forsyth
County, NC ( This EIS #20070057 and
EIS #20070058 are combined in a
single document.)
Summary: EPA continues to have
environmental concerns about impacts
to streams, terrestrial forest habitat, and
impacts to migratory birds. EPA
recommends that the Record of Decision
disclose planned mitigation for these
impacts.
EIS No. 20070106, ERP No. F–FRC–
H03002–00, Rockies Express Western
Phase Project, Construction and
Operation for the Natural Gas Pipeline
Facilities: Rockies Express (CP06–
354–000), TransColorado (CP06–401–
000) and Overthrust (CP06–423–000),
CO, WY, NE, KS, MO and NM.
Summary: EPA does not object to the
proposed project, but recommends
additional consideration be given to
potential invasive species transfer via
hydrostatic testing.
Dated: May 8, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–9138 Filed 5–10–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6686–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information, (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed through pursuant to
40 CFR 1506.9
EIS No. 20070176, Draft EIS, AFS, CO,
Spruce Creek Project, Proposed
Timber Harvest, Temporary Road
Construction, Thinning of SubMerchantable Trees, Enhancement of
Asper and Whitebark Pine, Cascade
Ranger District, Boise National Forest,
Valley County, ID, Comment Period
Ends: 6/25/2007, Contact: Keith
Dimmett, 208–382–7400.
EIS No. 20070177, Draft EIS, AFS, OR,
Spears Vegetation Management
Project, Proposal to Use Commercial
Timber Harvest, Precommercial
Thinning, Prescribed Fire, Grapple
Piling and Hand Piling in the Mark
Creek Watershed and Veaqie Creek
Subwatershed, Lookout Mountain
Ranger District, Ochoco National
Forest, Crook and Wheeler Counties,
OR, Comment Period Ends: 6/25/
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
2007, Contact: Katherine Farrell, 541–
416–6500.
EIS No. 20070178, Final EIS, AFS, 00,
Kootenai National Forest Invasive
Plant Management, Proposes to
Manage Noxious Weed and Invasive
Plant Species, Lincoln Sanders,
Flathead Counties, MT and Bonner
and Boundary Counties, ID, Wait
Period Ends: 6/11/2007, Contact: John
Gubel, 406–283–7774.
EIS No. 20070179, Final Supplement,
AFS, WA, School Fire Salvage
Recovery Project, To Clarify
Definitions of Live and Dead Trees,
Implementation, Pomeroy Ranger
District, Umatilla National Forest,
Columbia and Garfield Counties, WA,
Wait Period Ends: 6/11/2007, Contact:
Dean R. Millett, 509–843–1891.
EIS No. 20070180, Final EIS, NOA, 00,
Programmatic—Steller Sea Lion and
Northern Fur Seal Research, Proposal
to Disburse Funds and Issue Permit
for Research, AK, WA, OR and CA,
Wait Period Ends: 6/11/2007, Contact:
P. Michael Payne, 301–713–2289.
EIS No. 20070181, Draft EIS, FHW, VT,
Middlebury Spur Project,
Improvements to the Freight
Transportation System in the Town of
Middlebury in Addison County to the
Town of Pittsford in Rutland County,
VT, Comment Period Ends: 6/29/
2007, Contact: Kenneth Sikora, Jr.,
802–828–4423.
EIS No. 20070182, Final EIS, COE, MD,
Masonville Dredged Material
Containment Facility, New
Information, New Source of Dike
Building Material from the Seagirt
Dredging Project within the Patapsco
River, Funding, Baltimore, MD, Wait
Period Ends: 6/11/2007, Contact: Jon
Romeo, 410–962–6079.
Amended Notices
EIS No. 20070080, Draft EIS, NIG, CA,
Graton Rancheria Casino and Hotel
Project, Transfer of Land into Trust,
Implementation, Federated Indians of
Graton Rancheria (Tribe), Sonoma
County, CA, Comment Period Ends: 6/
4/2007, Contact: Brad Mehaffy, 202–
632–7003. Revision of FR Notice
Published 3/9/2007: Extending
Comment Period from 5/14/2007 to 6/
4/2007.
EIS No. 20070103, Draft EIS, FHW, NY,
Kosciuszko Bridge Project, Propose
Rehabilitation or Replacement a 1.1
mile Segment Brooklyn-Queens
Expressway (¥278) from Morgan
Avenue in Brooklyn and the Long
Island Expressway (1495) in Queens,
Kings and Queens Counties, NY,
Comment Period Ends: 6/15/2007,
Contact: Robert Arnold, 518–431–
4127. Revision of FR Notice Published
E:\FR\FM\11MYN1.SGM
11MYN1
Agencies
[Federal Register Volume 72, Number 91 (Friday, May 11, 2007)]
[Notices]
[Page 26814]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-9138]
[[Page 26814]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6686-8]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 6, 2007 (72 FR
17156).
Draft EISs
EIS No. 20070033, ERP No. D-FTA-C54010-00, Access to the Region's Core
Project, To Increase Trans-Hudson Commuter Rail Capacity, Improve
System Safety and Reliability between Secaucus Junction Station in NJ
and midtown Manhattan, Funding, Hudson County, NJ and New York County,
NY.
Summary: EPA expressed environmental concerns about impacts to
wetlands and air quality. EPA recommends that FTA provides more
information on cumulative impacts as well as a wetlands mitigation
plan. Rating EC2.
EIS No. 20070078, ERP No. D-NPS-C61011-NY, Sagamore Hill National
Historic Site, General Management Plan, Implementation, Oyster Bay,
Nassau County, NY.
Summary: EPA does not object to the proposed action. Rating LO.
EIS No. 20070097, ERP No. D-NOA-A91075-00, Programmatic--Marine Mammal
Health and Stranding Response Program (MMHSRP), Day-to-Day Operation on
Stranding, Response, Rehabilitation, Release, and Disentanglement
Activities.
Summary: EPA does not object to the proposed project.
However, EPA did request that NMFS clarify questions pertaining to
water quality, contaminants, and human health. Rating LO.
Final EISs
EIS No. 20070057, ERP No. F-FHW-E40763-NC, Winston-Salem Northern
Beltway, ( Eastern Section) U.S. 52 south to I-40 Business and I-40
Business south to U.S. 311, Improvements to the Surface Transportation
Network, TIP Project Nos. U2579 and U-2579A, Forsyth County, NC ( This
EIS 20070057 and EIS 20070058 are combined in a
single document.)
Summary: EPA continues to have environmental concerns about impacts
to streams, terrestrial forest habitat, and impacts to migratory birds.
EPA recommends that the Record of Decision disclose planned mitigation
for these impacts.
EIS No. 20070106, ERP No. F-FRC-H03002-00, Rockies Express Western
Phase Project, Construction and Operation for the Natural Gas Pipeline
Facilities: Rockies Express (CP06-354-000), TransColorado (CP06-401-
000) and Overthrust (CP06-423-000), CO, WY, NE, KS, MO and NM.
Summary: EPA does not object to the proposed project, but
recommends additional consideration be given to potential invasive
species transfer via hydrostatic testing.
Dated: May 8, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-9138 Filed 5-10-07; 8:45 am]
BILLING CODE 6560-50-P