Environmental Impacts Statements; Notice of Availability, 26814-26815 [E7-9136]
Download as PDF
26814
Federal Register / Vol. 72, No. 91 / Friday, May 11, 2007 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6686–8]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2007 (72 FR 17156).
Draft EISs
EIS No. 20070033, ERP No. D–FTA–
C54010–00, Access to the Region’s
Core Project, To Increase TransHudson Commuter Rail Capacity,
Improve System Safety and Reliability
between Secaucus Junction Station in
NJ and midtown Manhattan, Funding,
Hudson County, NJ and New York
County, NY.
Summary: EPA expressed
environmental concerns about impacts
to wetlands and air quality. EPA
recommends that FTA provides more
information on cumulative impacts as
well as a wetlands mitigation plan.
Rating EC2.
EIS No. 20070078, ERP No. D–NPS–
C61011–NY, Sagamore Hill National
Historic Site, General Management
Plan, Implementation, Oyster Bay,
Nassau County, NY.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20070097, ERP No. D–NOA–
A91075–00, Programmatic—Marine
Mammal Health and Stranding
Response Program (MMHSRP), Dayto-Day Operation on Stranding,
Response, Rehabilitation, Release, and
Disentanglement Activities.
Summary: EPA does not object to the
proposed project.
However, EPA did request that NMFS
clarify questions pertaining to water
quality, contaminants, and human
health. Rating LO.
ycherry on PROD1PC64 with NOTICES
Final EISs
EIS No. 20070057, ERP No. F–FHW–
E40763–NC, Winston-Salem Northern
Beltway, ( Eastern Section) U.S. 52
south to I–40 Business and I–40
Business south to U.S. 311,
Improvements to the Surface
Transportation Network, TIP Project
VerDate Aug<31>2005
21:09 May 10, 2007
Jkt 211001
Nos. U2579 and U–2579A, Forsyth
County, NC ( This EIS #20070057 and
EIS #20070058 are combined in a
single document.)
Summary: EPA continues to have
environmental concerns about impacts
to streams, terrestrial forest habitat, and
impacts to migratory birds. EPA
recommends that the Record of Decision
disclose planned mitigation for these
impacts.
EIS No. 20070106, ERP No. F–FRC–
H03002–00, Rockies Express Western
Phase Project, Construction and
Operation for the Natural Gas Pipeline
Facilities: Rockies Express (CP06–
354–000), TransColorado (CP06–401–
000) and Overthrust (CP06–423–000),
CO, WY, NE, KS, MO and NM.
Summary: EPA does not object to the
proposed project, but recommends
additional consideration be given to
potential invasive species transfer via
hydrostatic testing.
Dated: May 8, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–9138 Filed 5–10–07; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6686–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information, (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed through pursuant to
40 CFR 1506.9
EIS No. 20070176, Draft EIS, AFS, CO,
Spruce Creek Project, Proposed
Timber Harvest, Temporary Road
Construction, Thinning of SubMerchantable Trees, Enhancement of
Asper and Whitebark Pine, Cascade
Ranger District, Boise National Forest,
Valley County, ID, Comment Period
Ends: 6/25/2007, Contact: Keith
Dimmett, 208–382–7400.
EIS No. 20070177, Draft EIS, AFS, OR,
Spears Vegetation Management
Project, Proposal to Use Commercial
Timber Harvest, Precommercial
Thinning, Prescribed Fire, Grapple
Piling and Hand Piling in the Mark
Creek Watershed and Veaqie Creek
Subwatershed, Lookout Mountain
Ranger District, Ochoco National
Forest, Crook and Wheeler Counties,
OR, Comment Period Ends: 6/25/
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
2007, Contact: Katherine Farrell, 541–
416–6500.
EIS No. 20070178, Final EIS, AFS, 00,
Kootenai National Forest Invasive
Plant Management, Proposes to
Manage Noxious Weed and Invasive
Plant Species, Lincoln Sanders,
Flathead Counties, MT and Bonner
and Boundary Counties, ID, Wait
Period Ends: 6/11/2007, Contact: John
Gubel, 406–283–7774.
EIS No. 20070179, Final Supplement,
AFS, WA, School Fire Salvage
Recovery Project, To Clarify
Definitions of Live and Dead Trees,
Implementation, Pomeroy Ranger
District, Umatilla National Forest,
Columbia and Garfield Counties, WA,
Wait Period Ends: 6/11/2007, Contact:
Dean R. Millett, 509–843–1891.
EIS No. 20070180, Final EIS, NOA, 00,
Programmatic—Steller Sea Lion and
Northern Fur Seal Research, Proposal
to Disburse Funds and Issue Permit
for Research, AK, WA, OR and CA,
Wait Period Ends: 6/11/2007, Contact:
P. Michael Payne, 301–713–2289.
EIS No. 20070181, Draft EIS, FHW, VT,
Middlebury Spur Project,
Improvements to the Freight
Transportation System in the Town of
Middlebury in Addison County to the
Town of Pittsford in Rutland County,
VT, Comment Period Ends: 6/29/
2007, Contact: Kenneth Sikora, Jr.,
802–828–4423.
EIS No. 20070182, Final EIS, COE, MD,
Masonville Dredged Material
Containment Facility, New
Information, New Source of Dike
Building Material from the Seagirt
Dredging Project within the Patapsco
River, Funding, Baltimore, MD, Wait
Period Ends: 6/11/2007, Contact: Jon
Romeo, 410–962–6079.
Amended Notices
EIS No. 20070080, Draft EIS, NIG, CA,
Graton Rancheria Casino and Hotel
Project, Transfer of Land into Trust,
Implementation, Federated Indians of
Graton Rancheria (Tribe), Sonoma
County, CA, Comment Period Ends: 6/
4/2007, Contact: Brad Mehaffy, 202–
632–7003. Revision of FR Notice
Published 3/9/2007: Extending
Comment Period from 5/14/2007 to 6/
4/2007.
EIS No. 20070103, Draft EIS, FHW, NY,
Kosciuszko Bridge Project, Propose
Rehabilitation or Replacement a 1.1
mile Segment Brooklyn-Queens
Expressway (¥278) from Morgan
Avenue in Brooklyn and the Long
Island Expressway (1495) in Queens,
Kings and Queens Counties, NY,
Comment Period Ends: 6/15/2007,
Contact: Robert Arnold, 518–431–
4127. Revision of FR Notice Published
E:\FR\FM\11MYN1.SGM
11MYN1
Federal Register / Vol. 72, No. 91 / Friday, May 11, 2007 / Notices
3/23/2007: Extending Comment
Period from 5/25/2007 to 6/15/2007.
Dated: May 8, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E7–9136 Filed 5–10–07; 8:45 am]
contact Vanessa Bowie at 202–564–5186
or bowie.vanessa@epa.gov. To request
accommodation of disability, please
contact Vanessa Bowie, preferably at
least 10 days prior to the meeting, to
give EPA as much time as possible to
process your request.
ENVIRONMENTAL PROTECTION
AGENCY
Dated: May 7, 2007.
Joseph Dillon,
Director, Office of Enterprise Technology and
Innovation.
[FR Doc. E7–9120 Filed 5–10–07; 8:45 am]
[FRL–8313–6]
BILLING CODE 6560–50–P
Notice of Open Meeting, Environmental
Financial Advisory Board (EFAB),
Workshop on Environmental
Management Systems
ENVIRONMENTAL PROTECTION
AGENCY
BILLING CODE 6560–50–P
Environmental Protection
Agency (EPA).
ACTION: Notice.
ycherry on PROD1PC64 with NOTICES
AGENCY:
SUMMARY: The United States
Environmental Protection Agency’s
Environmental Financial Advisory
Board will hold an open meeting of its
Environmental Management Systems
Project Workgroup.
EFAB is chartered with providing
analysis and advice to the EPA
Administrator and EPA program offices
on issues relating to environmental
finance. The purpose of this meeting is
for the EFAB to gather information and
ideas with respect to how professionals
in the areas of commercial banking/
debt, insurance, and equity investment
view and/or use a corporation’s
environmental information such as
Environmental Management Systems
(EMSs) in their work. The day will
structured to address this issue via a
series of panel discussions involving
public and private experts in these
areas.
The meeting is open to the public
with limited seating available on a first
come first served basis. Due to building
security requirements, all members of
the public who wish to attend the
meeting must register in advance no
later than Wednesday, June 6, 2007.
DATES: June 12, 2007 from 8:30 a.m.–5
p.m.
ADDRESSES: U.S. Environmental
Protection Agency, Potomac Yard
Conference Center, One Potomac Yard,
2777 S. Crystal Drive, Arlington, VA
22202–3553.
FOR FURTHER INFORMATION CONTACT: To
register for the workshop or to obtain
further information, contact Vanessa
Bowie, Director, Environmental Finance
Staff, U.S. EPA, at 202–564–5186 or
bowie.vanessa@epa.gov.
For information on access or services
for individuals with disabilities, please
VerDate Aug<31>2005
21:09 May 10, 2007
Jkt 211001
[FRL–8313–9]
Science Advisory Board Staff Office;
Notification of a Public Teleconference
of the Science Advisory Board;
Environmental Economics Advisory
Committee
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: The EPA’s Science Advisory
Board (SAB) Staff Office is announcing
a public teleconference of the SAB
Environmental Economics Advisory
Committee (EEAC) to discuss its draft
advisory report to EPA regarding issues
in valuing mortality risk reduction.
DATES: The teleconference will be held
from 1 p.m.–4 p.m. Eastern time on June
4, 2007.
FOR FURTHER INFORMATION CONTACT: Any
member of the public wishing further
information regarding the public
teleconference and call-in number may
contact Dr. Holly Stallworth, Designated
Federal Officer (DFO), U.S. EPA Science
Advisory Board Staff Office by
telephone/voice mail at (202) 343–9867,
or via e-mail at
stallworth.holly@epa.gov. The SAB
mailing address is: U.S. EPA, Science
Advisory Board (1400F), 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460. General
information about the SAB, as well as
any updates concerning the public
teleconference announced in this notice,
may be found in the SAB Web Site at:
https://www.epa.gov/sab. The technical
contact for EPA’s work on valuing
mortality risk reduction is Dr. Chris
Dockins who may be reached at (202)
566–2286 or dockins.chris@epa.gov.
SUPPLEMENTARY INFORMATION: Pursuant
to the Federal Advisory Committee Act,
Public Law 92–463, notice is hereby
given that the SAB Environmental
Economics Advisory Committee will
hold a public teleconference to discuss
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
26815
appropriate methods for valuing
mortality risks. The SAB EEAC will be
augmented by economists from the
chartered Science Advisory Board as
well as the Advisory Council on Clean
Air Compliance Analysis. The SAB was
established by 42 U.S.C. 4365 to provide
independent scientific and technical
advice to the Administrator on the
technical basis for Agency positions and
regulations. The SAB is a Federal
Advisory Committee chartered under
the Federal Advisory Committee Act
(FACA), as amended, 5 U.S.C., App. The
SAB will comply with the provisions of
FACA and all appropriate SAB Staff
Office procedural policies.
Background
The SAB EEAC has been asked to
review two papers related to EPA’s
issues in valuing mortality risk
reduction. The first paper entitled
‘‘Report of the EPA Work Group on VSL
Meta-Analyses’’ addresses the
application of meta analysis techniques
to the derivation of estimates for
mortality risk reduction. A second
paper, entitled ‘‘Willingness to Pay for
Environmental Health Risk Reductions
when there are Varying Degrees of Life
Expectancy: A White Paper’’ discusses
appropriate and available methods for
valuing mortality risk reductions when
affected populations have varying life
expectancies. https://yosemite.epa.gov/
EE/epa/eerm.nsf/vwRepNumLookup/
EE–0495?OpenDocument. These papers
are posted at: https://yosemite.epa.gov/
EE/epa/eerm.nsf/vwRepNumLookup/
EE–0494?OpenDocument and https://
yosemite.epa.gov/EE/epa/eerm.nsf/
vwRepNumLookup/EE–
0495?OpenDocument. The SAB EEAC
met on September 14–15, 2006 (71 FR
48546), and a teleconference was held
on October 30, 2006 (71 FR 59779–
59780). During the June 4, 2007
teleconference, the SAB EEAC members
will discuss their draft advisory
responding to EPA’s charge questions
on the two papers cited above.
Availability of Teleconference
Materials: Materials in support of the
teleconference, including the SAB
EEAC’s draft response to the Agency’s
charge, will be placed on the SAB Web
Site at https://www.epa.gov/sab/panels/
eeac_adv_val_mortal_rick_reduc.htm
prior to the teleconference.
Procedures for Providing Public Input:
Interested members of the public may
submit relevant written or oral
information for the SAB to consider
during the advisory process.
Oral Statements: In general,
individuals or groups requesting an oral
presentation at a public teleconference
will be limited to five minutes per
E:\FR\FM\11MYN1.SGM
11MYN1
Agencies
[Federal Register Volume 72, Number 91 (Friday, May 11, 2007)]
[Notices]
[Pages 26814-26815]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-9136]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6686-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information, (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed through
pursuant to 40 CFR 1506.9
EIS No. 20070176, Draft EIS, AFS, CO, Spruce Creek Project, Proposed
Timber Harvest, Temporary Road Construction, Thinning of Sub-
Merchantable Trees, Enhancement of Asper and Whitebark Pine, Cascade
Ranger District, Boise National Forest, Valley County, ID, Comment
Period Ends: 6/25/2007, Contact: Keith Dimmett, 208-382-7400.
EIS No. 20070177, Draft EIS, AFS, OR, Spears Vegetation Management
Project, Proposal to Use Commercial Timber Harvest, Precommercial
Thinning, Prescribed Fire, Grapple Piling and Hand Piling in the Mark
Creek Watershed and Veaqie Creek Subwatershed, Lookout Mountain Ranger
District, Ochoco National Forest, Crook and Wheeler Counties, OR,
Comment Period Ends: 6/25/2007, Contact: Katherine Farrell, 541-416-
6500.
EIS No. 20070178, Final EIS, AFS, 00, Kootenai National Forest Invasive
Plant Management, Proposes to Manage Noxious Weed and Invasive Plant
Species, Lincoln Sanders, Flathead Counties, MT and Bonner and Boundary
Counties, ID, Wait Period Ends: 6/11/2007, Contact: John Gubel, 406-
283-7774.
EIS No. 20070179, Final Supplement, AFS, WA, School Fire Salvage
Recovery Project, To Clarify Definitions of Live and Dead Trees,
Implementation, Pomeroy Ranger District, Umatilla National Forest,
Columbia and Garfield Counties, WA, Wait Period Ends: 6/11/2007,
Contact: Dean R. Millett, 509-843-1891.
EIS No. 20070180, Final EIS, NOA, 00, Programmatic--Steller Sea Lion
and Northern Fur Seal Research, Proposal to Disburse Funds and Issue
Permit for Research, AK, WA, OR and CA, Wait Period Ends: 6/11/2007,
Contact: P. Michael Payne, 301-713-2289.
EIS No. 20070181, Draft EIS, FHW, VT, Middlebury Spur Project,
Improvements to the Freight Transportation System in the Town of
Middlebury in Addison County to the Town of Pittsford in Rutland
County, VT, Comment Period Ends: 6/29/2007, Contact: Kenneth Sikora,
Jr., 802-828-4423.
EIS No. 20070182, Final EIS, COE, MD, Masonville Dredged Material
Containment Facility, New Information, New Source of Dike Building
Material from the Seagirt Dredging Project within the Patapsco River,
Funding, Baltimore, MD, Wait Period Ends: 6/11/2007, Contact: Jon
Romeo, 410-962-6079.
Amended Notices
EIS No. 20070080, Draft EIS, NIG, CA, Graton Rancheria Casino and Hotel
Project, Transfer of Land into Trust, Implementation, Federated Indians
of Graton Rancheria (Tribe), Sonoma County, CA, Comment Period Ends: 6/
4/2007, Contact: Brad Mehaffy, 202-632-7003. Revision of FR Notice
Published 3/9/2007: Extending Comment Period from 5/14/2007 to 6/4/
2007.
EIS No. 20070103, Draft EIS, FHW, NY, Kosciuszko Bridge Project,
Propose Rehabilitation or Replacement a 1.1 mile Segment Brooklyn-
Queens Expressway (-278) from Morgan Avenue in Brooklyn and the Long
Island Expressway (1495) in Queens, Kings and Queens Counties, NY,
Comment Period Ends: 6/15/2007, Contact: Robert Arnold, 518-431-4127.
Revision of FR Notice Published
[[Page 26815]]
3/23/2007: Extending Comment Period from 5/25/2007 to 6/15/2007.
Dated: May 8, 2007.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E7-9136 Filed 5-10-07; 8:45 am]
BILLING CODE 6560-50-P