Panhandle Eastern Pipe Line Company, LP; Notice of Tariff Filing, 26351-26352 [E7-8848]
Download as PDF
Federal Register / Vol. 72, No. 89 / Wednesday, May 9, 2007 / Notices
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time,
May 9, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8843 Filed 5–8–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2219]
Garkane Energy Cooperative, Inc.;
Notice of Authorization for Continued
Project Operation
sroberts on PROD1PC70 with NOTICES
May 2, 2007.
On April 29, 2005, Garkane Energy
Cooperative, Inc, licensee for the
Boulder Creek Hydroelectric Project,
filed an application for a new or
subsequent license pursuant to the
Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Boulder Creek Project is located on
VerDate Aug<31>2005
18:12 May 08, 2007
Jkt 211001
the Boulder Creek in Garfield County,
Utah.
The license for Project No. 2219 was
issued for a period ending April 30,
2007. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2219
is issued to Garkane Energy
Cooperative, Inc., for a period effective
May 1, 2007 through April 30, 2008, or
until the issuance of a new license for
the project or other disposition under
the FPA, whichever comes first. If
issuance of a new license (or other
disposition) does not take place on or
before April 30, 2008, notice is hereby
given that, pursuant to 18 CFR 16.18(c),
an annual license under section 15(a)(1)
of the FPA is renewed automatically
without further order or notice by the
Commission, unless the Commission
orders otherwise. If the project is not
subject to section 15 of the FPA, notice
is hereby given that Garkane Energy
Cooperative, Inc., is authorized to
continue operation of the Boulder Creek
Project until such time as the
Commission acts on its application for
a subsequent license.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8840 Filed 5–8–07; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
26351
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP07–416–000]
Panhandle Eastern Pipe Line
Company, LP; Notice of Tariff Filing
May 2, 2007.
Take notice that on April 30, 2007,
Panhandle Eastern Pipe Line Company,
LP (Panhandle) tendered for filing as
part of its FERC Gas Tariff, Third
Revised Volume No. 1, Third Revised
Sheet No. 3B, to become effective June
1, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\09MYN1.SGM
09MYN1
26352
Federal Register / Vol. 72, No. 89 / Wednesday, May 9, 2007 / Notices
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8848 Filed 5–8–07; 8:45 am]
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8850 Filed 5–8–07; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
[Docket No. RP07–418–000]
Federal Energy Regulatory
Commission
Sea Robin Pipeline Company, LLC;
Notice of Tariff Filing
[Docket No. RP07–420–000]
May 2, 2007.
sroberts on PROD1PC70 with NOTICES
Federal Energy Regulatory
Commission
Stingray Pipeline Company, L.L.C.;
Notice of Proposed Changes in FERC
Gas Tariff
Take notice that on April 30, 2007,
Sea Robin Pipeline Company, LLC (Sea
Robin) tendered for filing as part of its
FERC Gas Tariff, Second Revised
Volume No. 1, Second Revised Sheet
No. 4, to become effective June 1, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
VerDate Aug<31>2005
18:12 May 08, 2007
Jkt 211001
May 2, 2007.
Take notice that on April 30, 2007,
Stingray Pipeline Company, L.L.C.
(Stingray) tendered for filing as part of
Stingray’s FERC Gas Tariff, Third
Revised Volume No. 1, the following
tariff sheets, with an effective date of
May 1, 2007:
Third Revised Sheet No. 140A
Second Revised Sheet No. 302A
Second Revised Sheet No. 302B
First Revised Sheet No. 302C
Second Revised Sheet No. 305B
First Revised Sheet No. 305C
Original Sheet No. 305D
First Revised Sheet No. 318
First Revised Sheet No. 319
First Revised Sheet No. 320
Second Revised Sheet No. 321
First Revised Sheet No. 322
Frm 00020
Fmt 4703
Sfmt 4703
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8838 Filed 5–8–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP07–417–000]
Trunkline Gas Company, LLC; Notice
of Proposed Changes In FERC Gas
Tariff
May 2, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
PO 00000
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Take notice that on April 30, 2007,
Trunkline Gas Company, LLC
(Trunkline) tendered for filing as part of
its FERC Gas Tariff, Third Revised
Volume No. 1, the following tariff
sheets, to become effective June 1, 2007:
Second Revised Sheet No. 6
First Revised Sheet No. 7
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
E:\FR\FM\09MYN1.SGM
09MYN1
Agencies
[Federal Register Volume 72, Number 89 (Wednesday, May 9, 2007)]
[Notices]
[Pages 26351-26352]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-8848]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP07-416-000]
Panhandle Eastern Pipe Line Company, LP; Notice of Tariff Filing
May 2, 2007.
Take notice that on April 30, 2007, Panhandle Eastern Pipe Line
Company, LP (Panhandle) tendered for filing as part of its FERC Gas
Tariff, Third Revised Volume No. 1, Third Revised Sheet No. 3B, to
become effective June 1, 2007.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
[[Page 26352]]
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-8848 Filed 5-8-07; 8:45 am]
BILLING CODE 6717-01-P