Garkane Energy Cooperative, Inc.; Notice of Authorization for Continued Project Operation, 26351 [E7-8840]

Download as PDF Federal Register / Vol. 72, No. 89 / Wednesday, May 9, 2007 / Notices 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time, May 9, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–8843 Filed 5–8–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2219] Garkane Energy Cooperative, Inc.; Notice of Authorization for Continued Project Operation sroberts on PROD1PC70 with NOTICES May 2, 2007. On April 29, 2005, Garkane Energy Cooperative, Inc, licensee for the Boulder Creek Hydroelectric Project, filed an application for a new or subsequent license pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Boulder Creek Project is located on VerDate Aug<31>2005 18:12 May 08, 2007 Jkt 211001 the Boulder Creek in Garfield County, Utah. The license for Project No. 2219 was issued for a period ending April 30, 2007. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2219 is issued to Garkane Energy Cooperative, Inc., for a period effective May 1, 2007 through April 30, 2008, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before April 30, 2008, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Garkane Energy Cooperative, Inc., is authorized to continue operation of the Boulder Creek Project until such time as the Commission acts on its application for a subsequent license. Kimberly D. Bose, Secretary. [FR Doc. E7–8840 Filed 5–8–07; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 26351 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP07–416–000] Panhandle Eastern Pipe Line Company, LP; Notice of Tariff Filing May 2, 2007. Take notice that on April 30, 2007, Panhandle Eastern Pipe Line Company, LP (Panhandle) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, Third Revised Sheet No. 3B, to become effective June 1, 2007. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call E:\FR\FM\09MYN1.SGM 09MYN1

Agencies

[Federal Register Volume 72, Number 89 (Wednesday, May 9, 2007)]
[Notices]
[Page 26351]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-8840]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2219]


Garkane Energy Cooperative, Inc.; Notice of Authorization for 
Continued Project Operation

May 2, 2007.
    On April 29, 2005, Garkane Energy Cooperative, Inc, licensee for 
the Boulder Creek Hydroelectric Project, filed an application for a new 
or subsequent license pursuant to the Federal Power Act (FPA) and the 
Commission's regulations thereunder. The Boulder Creek Project is 
located on the Boulder Creek in Garfield County, Utah.
    The license for Project No. 2219 was issued for a period ending 
April 30, 2007. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2219 is issued to 
Garkane Energy Cooperative, Inc., for a period effective May 1, 2007 
through April 30, 2008, or until the issuance of a new license for the 
project or other disposition under the FPA, whichever comes first. If 
issuance of a new license (or other disposition) does not take place on 
or before April 30, 2008, notice is hereby given that, pursuant to 18 
CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise. If the project is 
not subject to section 15 of the FPA, notice is hereby given that 
Garkane Energy Cooperative, Inc., is authorized to continue operation 
of the Boulder Creek Project until such time as the Commission acts on 
its application for a subsequent license.

Kimberly D. Bose,
Secretary.
[FR Doc. E7-8840 Filed 5-8-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.