Download as PDF cprice-sewell on DSK89S0YB1PROD with NOTICES Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. p. Proposed Scope of Studies Under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. q. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. r. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘PROTEST’’, and ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. s. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for VerDate Nov<24>2008 14:51 Apr 20, 2010 Jkt 220001 filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E7–8520 Filed 5–3–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12769–000] Ice House Partners, Inc.; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests April 27, 2007. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Exemption from Licensing. b. Project No.: 12769–000. c. Date filed: January 22, 2007. d. Applicant: Ice House Partners, Inc. e. Name of Project: Ice House Power Project. f. Location: On the Nashua River, in the Town of Ayer, Middlesex County, Massachusetts. The project would use Federal land. g. Filed Pursuant to: Public Utility Regulatory Policies Act of 1978, 16 U.S.C. sections 2705 and 2708. h. Applicant Contact: Liisa Dowd, Ice House Partners, Inc., 323 West Main Street, Ayer, MA 01432, (978) 772–3303. i. FERC Contact: Tom Dean, (202) 502–6041. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Motions to intervene and protests may be filed electronically via the Internet in lieu of paper. The Commission strongly PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 25299 encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov) under the ‘‘eFiling’’ link. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. Description of Project: The Ice House Power Project would consist of the following existing facilities: (1) The 300-foot-long, 10-foot-high Ice House Dam consisting of a 210-foot-long spillway topped with flashboards; (2) a 137-acre reservoir with a normal full pond elevation of 215 feet National Geodetic Vertical Datum; (3) a 50-footwide, 600-foot-long power canal; (4) a restored powerhouse containing two generating units with a total installed capacity of 270 kilowatts; and (5) appurtenant facilities. The project would have an average annual generation of 2,500 megawatt-hours. m. A copy of the filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. All filings must: (1) Bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) E:\FR\FM\04MYN1.SGM 04MYN1 25300 Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. o. Procedural schedule: The application will be processed according to the following revised hydro licensing schedule. Notice of application is ready for environmental analysis September 2007. Notice of the availability of the EA February 2008. Kimberly D. Bose, Secretary. [FR Doc. E7–8521 Filed 5–3–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI07–8–000] Slatersville Hydro, LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene cprice-sewell on DSK89S0YB1PROD with NOTICES April 30, 2007. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No.: DI07–8–000. c. Date Filed: April 20, 2007. d. Applicant: Slatersville Hydro, LLC. e. Name of Project: Slatersville Hydro Project. f. Location: The proposed Slatersville Hydro Project will be located on the Branch River, tributary to the Blackstone River, near North Smithfield, in Providence County, Rhode Island. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Michael P. DeFrancesco, P.E., LLC, 87 Hallville Road, Exeter, RI 02822; telephone: (401) 742–1968; fax: (401) 742–5014; e-mail: mpdpe@aol.com. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or e-mail address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and/or motions: May 31, 2007. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC VerDate Nov<24>2008 14:51 Apr 20, 2010 Jkt 220001 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. Any questions, please contact the Secretary’s Office. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-Filing link. Please include the docket number (DI07–8–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed run-of-river Slatersville Hydro Project will include: (1) An 18-foot-high, 100-foot-long stone-and-concrete dam; (2) a powerhouse containing a turbinegenerator rated at 400 kW; (3) a 45-acre reservoir; and (4) appurtenant facilities. The project will be connected to an interstate grid, but will not occupy any tribal or Federal lands When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link, select ‘‘Docket#’’ and follow the instructions. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Philis J. Posey, Deputy Secretary. [FR Doc. E7–8536 Filed 5–3–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98–1–000] Records Governing Off-the Record Communications; Public Notice April 30, 2007. This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt of prohibited and exempt off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who make or receive a prohibited or exempt off-the-record communication relevant to the merits of a contested proceeding, to deliver to the Secretary of the Commission, a copy of the communication, if written, or a summary of the substance of any oral communication. Prohibited communications are included in a public, non-decisional file associated with, but not a part of, the decisional record of the proceeding. Unless the Commission determines that the prohibited communication and any responses thereto should become a part of the decisional record, the prohibited off-the-record communication will not E:\FR\FM\04MYN1.SGM 04MYN1

Agencies

[Federal Register Volume 72, Number 86 (Friday, May 4, 2007)]
[Notices]
[Pages 25299-25300]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-8521]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12769-000]


Ice House Partners, Inc.; Notice of Application Accepted for 
Filing and Soliciting Motions To Intervene and Protests

April 27, 2007.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Exemption from Licensing.
    b. Project No.: 12769-000.
    c. Date filed: January 22, 2007.
    d. Applicant: Ice House Partners, Inc.
    e. Name of Project: Ice House Power Project.
    f. Location: On the Nashua River, in the Town of Ayer, Middlesex 
County, Massachusetts. The project would use Federal land.
    g. Filed Pursuant to: Public Utility Regulatory Policies Act of 
1978, 16 U.S.C. sections 2705 and 2708.
    h. Applicant Contact: Liisa Dowd, Ice House Partners, Inc., 323 
West Main Street, Ayer, MA 01432, (978) 772-3303.
    i. FERC Contact: Tom Dean, (202) 502-6041.
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Motions to intervene and protests may be filed electronically via 
the Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (https://www.ferc.gov) under the 
``eFiling'' link.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. Description of Project: The Ice House Power Project would 
consist of the following existing facilities: (1) The 300-foot-long, 
10-foot-high Ice House Dam consisting of a 210-foot-long spillway 
topped with flashboards; (2) a 137-acre reservoir with a normal full 
pond elevation of 215 feet National Geodetic Vertical Datum; (3) a 50-
foot-wide, 600-foot-long power canal; (4) a restored powerhouse 
containing two generating units with a total installed capacity of 270 
kilowatts; and (5) appurtenant facilities. The project would have an 
average annual generation of 2,500 megawatt-hours.
    m. A copy of the filing is available for review at the Commission 
in the Public Reference Room or may be viewed on the Commission's Web 
site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, 
or for TTY, (202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Anyone may submit a protest or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any protests 
or motions to intervene must be received on or before the specified 
deadline date for the particular application.
    All filings must: (1) Bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4)

[[Page 25300]]

otherwise comply with the requirements of 18 CFR 385.2001 through 
385.2005. Agencies may obtain copies of the application directly from 
the applicant. A copy of any protest or motion to intervene must be 
served upon each representative of the applicant specified in the 
particular application.
    o. Procedural schedule: The application will be processed according 
to the following revised hydro licensing schedule.
    Notice of application is ready for environmental analysis September 
2007.
    Notice of the availability of the EA February 2008.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-8521 Filed 5-3-07; 8:45 am]
BILLING CODE 6717-01-P