Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
r. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
VerDate Nov<24>2008
14:51 Apr 20, 2010
Jkt 220001
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8520 Filed 5–3–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12769–000]
Ice House Partners, Inc.; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
April 27, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
from Licensing.
b. Project No.: 12769–000.
c. Date filed: January 22, 2007.
d. Applicant: Ice House Partners, Inc.
e. Name of Project: Ice House Power
Project.
f. Location: On the Nashua River, in
the Town of Ayer, Middlesex County,
Massachusetts. The project would use
Federal land.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. sections 2705 and 2708.
h. Applicant Contact: Liisa Dowd, Ice
House Partners, Inc., 323 West Main
Street, Ayer, MA 01432, (978) 772–3303.
i. FERC Contact: Tom Dean, (202)
502–6041.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Motions to intervene and protests may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
25299
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the
‘‘eFiling’’ link.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. Description of Project: The Ice
House Power Project would consist of
the following existing facilities: (1) The
300-foot-long, 10-foot-high Ice House
Dam consisting of a 210-foot-long
spillway topped with flashboards; (2) a
137-acre reservoir with a normal full
pond elevation of 215 feet National
Geodetic Vertical Datum; (3) a 50-footwide, 600-foot-long power canal; (4) a
restored powerhouse containing two
generating units with a total installed
capacity of 270 kilowatts; and (5)
appurtenant facilities. The project
would have an average annual
generation of 2,500 megawatt-hours.
m. A copy of the filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must: (1) Bear in all capital
letters the title ‘‘PROTEST’’ or ‘‘MOTION
TO INTERVENE;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4)
E:\FR\FM\04MYN1.SGM
04MYN1
25300
Federal Register / Vol. 72, No. 86 / Friday, May 4, 2007 / Notices
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application.
o. Procedural schedule: The
application will be processed according
to the following revised hydro licensing
schedule.
Notice of application is ready for
environmental analysis September 2007.
Notice of the availability of the EA
February 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8521 Filed 5–3–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI07–8–000]
Slatersville Hydro, LLC; Notice of
Declaration of Intention and Soliciting
Comments, Protests, and/or Motions
To Intervene
cprice-sewell on DSK89S0YB1PROD with NOTICES
April 30, 2007.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No.: DI07–8–000.
c. Date Filed: April 20, 2007.
d. Applicant: Slatersville Hydro, LLC.
e. Name of Project: Slatersville Hydro
Project.
f. Location: The proposed Slatersville
Hydro Project will be located on the
Branch River, tributary to the
Blackstone River, near North Smithfield,
in Providence County, Rhode Island.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Michael P.
DeFrancesco, P.E., LLC, 87 Hallville
Road, Exeter, RI 02822; telephone: (401)
742–1968; fax: (401) 742–5014; e-mail:
mpdpe@aol.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or e-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: May 31, 2007.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
VerDate Nov<24>2008
14:51 Apr 20, 2010
Jkt 220001
20426. Comments, protests, and/or
interventions may be filed electronically
via the Internet in lieu of paper. Any
questions, please contact the Secretary’s
Office. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing link.
Please include the docket number
(DI07–8–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed run-of-river Slatersville Hydro
Project will include: (1) An 18-foot-high,
100-foot-long stone-and-concrete dam;
(2) a powerhouse containing a turbinegenerator rated at 400 kW; (3) a 45-acre
reservoir; and (4) appurtenant facilities.
The project will be connected to an
interstate grid, but will not occupy any
tribal or Federal lands
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link, select ‘‘Docket#’’ and
follow the instructions. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact
(202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Philis J. Posey,
Deputy Secretary.
[FR Doc. E7–8536 Filed 5–3–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the Record
Communications; Public Notice
April 30, 2007.
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 72, Number 86 (Friday, May 4, 2007)]
[Notices]
[Pages 25299-25300]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-8521]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12769-000]
Ice House Partners, Inc.; Notice of Application Accepted for
Filing and Soliciting Motions To Intervene and Protests
April 27, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption from Licensing.
b. Project No.: 12769-000.
c. Date filed: January 22, 2007.
d. Applicant: Ice House Partners, Inc.
e. Name of Project: Ice House Power Project.
f. Location: On the Nashua River, in the Town of Ayer, Middlesex
County, Massachusetts. The project would use Federal land.
g. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. sections 2705 and 2708.
h. Applicant Contact: Liisa Dowd, Ice House Partners, Inc., 323
West Main Street, Ayer, MA 01432, (978) 772-3303.
i. FERC Contact: Tom Dean, (202) 502-6041.
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Motions to intervene and protests may be filed electronically via
the Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (https://www.ferc.gov) under the
``eFiling'' link.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. Description of Project: The Ice House Power Project would
consist of the following existing facilities: (1) The 300-foot-long,
10-foot-high Ice House Dam consisting of a 210-foot-long spillway
topped with flashboards; (2) a 137-acre reservoir with a normal full
pond elevation of 215 feet National Geodetic Vertical Datum; (3) a 50-
foot-wide, 600-foot-long power canal; (4) a restored powerhouse
containing two generating units with a total installed capacity of 270
kilowatts; and (5) appurtenant facilities. The project would have an
average annual generation of 2,500 megawatt-hours.
m. A copy of the filing is available for review at the Commission
in the Public Reference Room or may be viewed on the Commission's Web
site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676,
or for TTY, (202) 502-8659. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must: (1) Bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4)
[[Page 25300]]
otherwise comply with the requirements of 18 CFR 385.2001 through
385.2005. Agencies may obtain copies of the application directly from
the applicant. A copy of any protest or motion to intervene must be
served upon each representative of the applicant specified in the
particular application.
o. Procedural schedule: The application will be processed according
to the following revised hydro licensing schedule.
Notice of application is ready for environmental analysis September
2007.
Notice of the availability of the EA February 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-8521 Filed 5-3-07; 8:45 am]