Williston Basin Interstate Pipeline Company; Notice of Tariff Filing, 24579-24580 [E7-8411]
Download as PDF
mmaher on DSK3CLS3C1PROD with $$_JOB
Federal Register / Vol. 72, No. 85 / Thursday, May 3, 2007 / Notices
also states that by adding compression
on the southern portion of its mainline,
it can accommodate up to an additional
45,000 Mcf/d of natural gas on a
sustainable firm basis for southern
deliveries in order to bring this
additional production to market. MIGC
estimates that it would cost $3,862,400
to construct the proposed Python
compressor station. MIGC would
finance the proposed construction with
available funds and/or short-term
borrowings.
Any questions concerning this
application may be directed to Nancy
Garfield, Senior Commercial
Development Representative, MIGC,
Inc., 1099 18th Street, Suite 1200,
Denver, Colorado, or telephone 303–
252–6186.
This filing is available for review at
the Commission or may be viewed on
the Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
Support at FERC
OnlineSupport@ferc.gov or call toll-free
at (866) 206–3676, or, for TTY, contact
(202) 502–8659. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
intervenors to file electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8412 Filed 5–2–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar 15 2010
05:02 Aug 19, 2011
Jkt 223001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER07–594–000]
Pirin Solutions, LLC; Notice of
Issuance of Order
April 26, 2007.
Pirin Solutions, LLC (Pirin) filed an
application for market-based rate
authority, with an accompanying rate
schedule. The proposed market-based
rate schedule provides for the sale of
energy, capacity and ancillary services
at market-based rates. Pirin also
requested waivers of various
Commission regulations. In particular,
Pirin requested that the Commission
grant blanket approval under 18 CFR
Part 34 of all future issuances of
securities and assumptions of liability
by Pirin.
On April 24, 2007, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under Part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard concerning the blanket approvals
of issuances of securities or assumptions
of liability by Pirin should file a protest
with the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing protests is May 24,
2007.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Pirin is authorized
to issue securities and assume
obligations or liabilities as a guarantor,
indorser, surety, or otherwise in respect
of any security of another person;
provided that such issuance or
assumption is for some lawful object
within the corporate purposes of Pirin,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Pirin’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
24579
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8406 Filed 5–2–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP07–405–000]
Williston Basin Interstate Pipeline
Company; Notice of Tariff Filing
April 26, 2007.
Take notice that on April 23, 2007,
Williston Basin Interstate Pipeline
Company (Williston Basin) tendered for
filing to become a part of its FERC Gas
Tariff, Second Revised Volume No. 1,
Fourteenth Revised Sheet No. 375, to
become effective April 23, 2007:
Williston Basin has revised the abovereferenced tariff sheet found in Section
48 of the General Terms and Conditions
of its FERC Gas Tariff, Second Revised
Volume No. 1 (Tariff), to rename Point
ID No. 04840 (Kinder Morgan-Billy
Creek) to Point ID No. 4840 (SourceGasBilly Creek).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
E:\FEDREG\03MYN1.LOC
03MYN1
24580
Federal Register / Vol. 72, No. 85 / Thursday, May 3, 2007 / Notices
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8411 Filed 5–2–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12429–001]
Clark Canyon Hydro, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
mmaher on DSK3CLS3C1PROD with $$_JOB
April 26, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major License.
b. Project No.: 12429–001.
c. Date filed: August 1, 2006.
d. Applicant: Clark Canyon Hydro,
LLC.
e. Name of Project: Clark Canyon Dam
Hydroelectric Project.
f. Location: On the Beaverhead River,
18 miles southwest of the Town of
Dillon, Beaverhead County, Montana.
The project would occupy 3.5 acres of
federal land administered by the Bureau
of Reclamation.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Brent L. Smith,
Northwest Power Services, Inc., P.O.
Box 535, Rigby, ID 83442, (208) 745–
0834 or Dr. Vincent Lamarra,
Ecosystems Research Institute, Inc., 975
South State Highway, Logan, UT 84321.
VerDate Mar 15 2010
05:02 Aug 19, 2011
Jkt 223001
i. FERC Contact: Dianne Rodman,
(202) 502–6077,
dianne.rodman@ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
Motions to intervene and protests may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The proposed project would utilize
the Bureau of Reclamation’s existing
Clark Canyon dam, and would consist of
the following new facilities: (1) A steel
liner in the existing 9-foot-diameter
concrete outlet conduit; (2) a new outlet
gate structure; (3) a 9-foot-diameter steel
penstock bifurcating into an 8-foot
diameter and a 6-foot diameter steel
penstock directing flow to the turbine
units about 70 feet from the bifurcation;
(4) a powerhouse containing two
generating units with a combined
capacity of 4.75 megawatts; (5) a 300foot-long access road; (6) a switchyard;
(7) a substation; and (8) about 0.3 mile
of transmission line connecting the
project to the local utility’s existing
transmission system. The average
annual generation is estimated to be
16.5 gigawatthours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant named in this
public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) Bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
E:\FEDREG\03MYN1.LOC
03MYN1
Agencies
[Federal Register Volume 72, Number 85 (Thursday, May 3, 2007)]
[Notices]
[Pages 24579-24580]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-8411]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP07-405-000]
Williston Basin Interstate Pipeline Company; Notice of Tariff
Filing
April 26, 2007.
Take notice that on April 23, 2007, Williston Basin Interstate
Pipeline Company (Williston Basin) tendered for filing to become a part
of its FERC Gas Tariff, Second Revised Volume No. 1, Fourteenth Revised
Sheet No. 375, to become effective April 23, 2007:
Williston Basin has revised the above-referenced tariff sheet found
in Section 48 of the General Terms and Conditions of its FERC Gas
Tariff, Second Revised Volume No. 1 (Tariff), to rename Point ID No.
04840 (Kinder Morgan-Billy Creek) to Point ID No. 4840 (SourceGas-Billy
Creek).
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed in accordance with the provisions of
Section 154.210 of the Commission's regulations (18 CFR 154.210).
Anyone filing an intervention or protest must serve a copy of that
document on the Applicant. Anyone filing an intervention or protest on
or before the intervention or protest date need not serve motions to
intervene or
[[Page 24580]]
protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-8411 Filed 5-2-07; 8:45 am]