Download as PDF mmaher on DSK3CLS3C1PROD with $$_JOB Federal Register / Vol. 72, No. 85 / Thursday, May 3, 2007 / Notices also states that by adding compression on the southern portion of its mainline, it can accommodate up to an additional 45,000 Mcf/d of natural gas on a sustainable firm basis for southern deliveries in order to bring this additional production to market. MIGC estimates that it would cost $3,862,400 to construct the proposed Python compressor station. MIGC would finance the proposed construction with available funds and/or short-term borrowings. Any questions concerning this application may be directed to Nancy Garfield, Senior Commercial Development Representative, MIGC, Inc., 1099 18th Street, Suite 1200, Denver, Colorado, or telephone 303– 252–6186. This filing is available for review at the Commission or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number filed to access the document. For assistance, please contact FERC Online Support at FERC OnlineSupport@ferc.gov or call toll-free at (866) 206–3676, or, for TTY, contact (202) 502–8659. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages intervenors to file electronically. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Kimberly D. Bose, Secretary. [FR Doc. E7–8412 Filed 5–2–07; 8:45 am] BILLING CODE 6717–01–P VerDate Mar 15 2010 05:02 Aug 19, 2011 Jkt 223001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER07–594–000] Pirin Solutions, LLC; Notice of Issuance of Order April 26, 2007. Pirin Solutions, LLC (Pirin) filed an application for market-based rate authority, with an accompanying rate schedule. The proposed market-based rate schedule provides for the sale of energy, capacity and ancillary services at market-based rates. Pirin also requested waivers of various Commission regulations. In particular, Pirin requested that the Commission grant blanket approval under 18 CFR Part 34 of all future issuances of securities and assumptions of liability by Pirin. On April 24, 2007, pursuant to delegated authority, the Director, Division of Tariffs and Market Development—West, granted the requests for blanket approval under Part 34 (Director’s Order). The Director’s Order also stated that the Commission would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard concerning the blanket approvals of issuances of securities or assumptions of liability by Pirin should file a protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). Notice is hereby given that the deadline for filing protests is May 24, 2007. Absent a request to be heard in opposition to such blanket approvals by the deadline above, Pirin is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of Pirin, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of Pirin’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 24579 Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https:// www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E7–8406 Filed 5–2–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP07–405–000] Williston Basin Interstate Pipeline Company; Notice of Tariff Filing April 26, 2007. Take notice that on April 23, 2007, Williston Basin Interstate Pipeline Company (Williston Basin) tendered for filing to become a part of its FERC Gas Tariff, Second Revised Volume No. 1, Fourteenth Revised Sheet No. 375, to become effective April 23, 2007: Williston Basin has revised the abovereferenced tariff sheet found in Section 48 of the General Terms and Conditions of its FERC Gas Tariff, Second Revised Volume No. 1 (Tariff), to rename Point ID No. 04840 (Kinder Morgan-Billy Creek) to Point ID No. 4840 (SourceGasBilly Creek). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or E:\FEDREG\03MYN1.LOC 03MYN1 24580 Federal Register / Vol. 72, No. 85 / Thursday, May 3, 2007 / Notices protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E7–8411 Filed 5–2–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429–001] Clark Canyon Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests mmaher on DSK3CLS3C1PROD with $$_JOB April 26, 2007. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major License. b. Project No.: 12429–001. c. Date filed: August 1, 2006. d. Applicant: Clark Canyon Hydro, LLC. e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: On the Beaverhead River, 18 miles southwest of the Town of Dillon, Beaverhead County, Montana. The project would occupy 3.5 acres of federal land administered by the Bureau of Reclamation. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Brent L. Smith, Northwest Power Services, Inc., P.O. Box 535, Rigby, ID 83442, (208) 745– 0834 or Dr. Vincent Lamarra, Ecosystems Research Institute, Inc., 975 South State Highway, Logan, UT 84321. VerDate Mar 15 2010 05:02 Aug 19, 2011 Jkt 223001 i. FERC Contact: Dianne Rodman, (202) 502–6077, dianne.rodman@ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Motions to intervene and protests may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov) under the ‘‘eFiling’’ link. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. The proposed project would utilize the Bureau of Reclamation’s existing Clark Canyon dam, and would consist of the following new facilities: (1) A steel liner in the existing 9-foot-diameter concrete outlet conduit; (2) a new outlet gate structure; (3) a 9-foot-diameter steel penstock bifurcating into an 8-foot diameter and a 6-foot diameter steel penstock directing flow to the turbine units about 70 feet from the bifurcation; (4) a powerhouse containing two generating units with a combined capacity of 4.75 megawatts; (5) a 300foot-long access road; (6) a switchyard; (7) a substation; and (8) about 0.3 mile of transmission line connecting the project to the local utility’s existing transmission system. The average annual generation is estimated to be 16.5 gigawatthours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant named in this public notice. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions. All filings must (1) Bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ or ‘‘COMPETING APPLICATION;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR E:\FEDREG\03MYN1.LOC 03MYN1

Agencies

[Federal Register Volume 72, Number 85 (Thursday, May 3, 2007)]
[Notices]
[Pages 24579-24580]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-8411]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP07-405-000]


Williston Basin Interstate Pipeline Company; Notice of Tariff 
Filing

April 26, 2007.
    Take notice that on April 23, 2007, Williston Basin Interstate 
Pipeline Company (Williston Basin) tendered for filing to become a part 
of its FERC Gas Tariff, Second Revised Volume No. 1, Fourteenth Revised 
Sheet No. 375, to become effective April 23, 2007:
    Williston Basin has revised the above-referenced tariff sheet found 
in Section 48 of the General Terms and Conditions of its FERC Gas 
Tariff, Second Revised Volume No. 1 (Tariff), to rename Point ID No. 
04840 (Kinder Morgan-Billy Creek) to Point ID No. 4840 (SourceGas-Billy 
Creek).
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or

[[Page 24580]]

protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Kimberly D. Bose,