Clark Canyon Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 24580-24581 [E7-8408]
Download as PDF
24580
Federal Register / Vol. 72, No. 85 / Thursday, May 3, 2007 / Notices
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8411 Filed 5–2–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12429–001]
Clark Canyon Hydro, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
mmaher on DSK3CLS3C1PROD with $$_JOB
April 26, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major License.
b. Project No.: 12429–001.
c. Date filed: August 1, 2006.
d. Applicant: Clark Canyon Hydro,
LLC.
e. Name of Project: Clark Canyon Dam
Hydroelectric Project.
f. Location: On the Beaverhead River,
18 miles southwest of the Town of
Dillon, Beaverhead County, Montana.
The project would occupy 3.5 acres of
federal land administered by the Bureau
of Reclamation.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Brent L. Smith,
Northwest Power Services, Inc., P.O.
Box 535, Rigby, ID 83442, (208) 745–
0834 or Dr. Vincent Lamarra,
Ecosystems Research Institute, Inc., 975
South State Highway, Logan, UT 84321.
VerDate Mar 15 2010
05:02 Aug 19, 2011
Jkt 223001
i. FERC Contact: Dianne Rodman,
(202) 502–6077,
dianne.rodman@ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
Motions to intervene and protests may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The proposed project would utilize
the Bureau of Reclamation’s existing
Clark Canyon dam, and would consist of
the following new facilities: (1) A steel
liner in the existing 9-foot-diameter
concrete outlet conduit; (2) a new outlet
gate structure; (3) a 9-foot-diameter steel
penstock bifurcating into an 8-foot
diameter and a 6-foot diameter steel
penstock directing flow to the turbine
units about 70 feet from the bifurcation;
(4) a powerhouse containing two
generating units with a combined
capacity of 4.75 megawatts; (5) a 300foot-long access road; (6) a switchyard;
(7) a substation; and (8) about 0.3 mile
of transmission line connecting the
project to the local utility’s existing
transmission system. The average
annual generation is estimated to be
16.5 gigawatthours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant named in this
public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) Bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
E:\FEDREG\03MYN1.LOC
03MYN1
Federal Register / Vol. 72, No. 85 / Thursday, May 3, 2007 / Notices
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
o. Procedural schedule: The
application will be processed according
to the following Hydro Licensing
24581
Schedule. Revisions to the schedule will
be made as appropriate.
Date
Issue Scoping Document 1 for comments ..................................................................................................................................
Issue Scoping Document 2 .........................................................................................................................................................
Additional information due ...........................................................................................................................................................
Notice of application is ready for environmental analysis ..........................................................................................................
Notice of the availability of the EA ..............................................................................................................................................
Ready for Commission’s decision on the application .................................................................................................................
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8408 Filed 5–2–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12646–001]
City of Broken Bow, OK; Notice
Soliciting Scoping Comments
mmaher on DSK3CLS3C1PROD with $$_JOB
April 26, 2007.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: P–12646–001.
c. Date filed: July 6, 2006.
d. Applicant: City of Broken Bow.
e. Name of Project: Pine Creek Lake
Dam Hydropower Project.
f. Location: On the Little River in
McCurtain County, Oklahoma. The
project would be located at the United
States Army Corps of Engineers’ (Corps)
Pine Creek Lake Dam and would occupy
several acres of land administered by
the Corps.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Olen Hill, City
Manager, City of Broken Bow,
Oklahoma; 210 North Broadway; Broken
Bow, Oklahoma 74728; (405) 584–2282.
i. FERC Contact: Allyson Conner,
(202) 502–6082 or
allyson.conner@ferc.gov.
j. Deadline for filing scoping
comments: May 24, 2007.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
VerDate Mar 15 2010
05:02 Aug 19, 2011
Jkt 223001
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Scoping comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the
‘‘eFiling’’ link.
k. This application is not ready for
environmental analysis at this time.
l. The proposed Pine Creek Lake Dam
Hydropower project would be located at
the Corps’ Pine Creek Lake Dam and
Reservoir, and would consist of the
following facilities: (1) A diversion
structure connecting to the existing
outlet conduit; (2) a penstock
connecting the diversion structure to the
powerhouse; (3) a 112-foot-wide by 73foot-long powerhouse containing two
turbine-generator units, having a totaled
installed capacity of 6.4 megawatts; (4)
a tailrace returning flows to the Little
River; (5) a one-mile-long, 14.4-kilovolt
transmission line or a 6.5-mile-long,
13.8 kilovolt transmission line
connecting to an existing distribution
line; and (6) appurtenant facilities. The
Applicant estimates that the average
annual generation from the Project
would be 16,200 megawatt-hours and
that the Project would have an installed
generating capacity of 6.4 megawatts
(MW). All generated power would be
sold to a local utility connected to the
grid.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
May 2007.
August 2007.
December 2007.
January 2008.
July 2008.
October 2008.
number excluding the last three digits in
the docket number field to address the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is available for
inspection and reproduction at the
address in Item H above.
n. You may also register online at
https://www.ferc.gov.esubscribenow.htm
to be notified via e-mail of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
o. Scoping Process
The Commission staff intends to
prepare a single Environmental
Assessment (EA) for the Pine Creek Lake
Dam Hydroelectric Project in
accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information, on the Scoping Document
(SD) issued on April 20, 2007.
Copies of the SD outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list and the
applicant’s service list. Copies of the SD
may be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call 1–866–208–3676 or for
TTY, (202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–8409 Filed 5–2–07; 8:45 am]
BILLING CODE 6717–01–P
E:\FEDREG\03MYN1.LOC
03MYN1
Agencies
[Federal Register Volume 72, Number 85 (Thursday, May 3, 2007)]
[Notices]
[Pages 24580-24581]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-8408]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12429-001]
Clark Canyon Hydro, LLC; Notice of Application Accepted for
Filing and Soliciting Motions To Intervene and Protests
April 26, 2007.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major License.
b. Project No.: 12429-001.
c. Date filed: August 1, 2006.
d. Applicant: Clark Canyon Hydro, LLC.
e. Name of Project: Clark Canyon Dam Hydroelectric Project.
f. Location: On the Beaverhead River, 18 miles southwest of the
Town of Dillon, Beaverhead County, Montana. The project would occupy
3.5 acres of federal land administered by the Bureau of Reclamation.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Brent L. Smith, Northwest Power Services,
Inc., P.O. Box 535, Rigby, ID 83442, (208) 745-0834 or Dr. Vincent
Lamarra, Ecosystems Research Institute, Inc., 975 South State Highway,
Logan, UT 84321.
i. FERC Contact: Dianne Rodman, (202) 502-6077,
dianne.rodman@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedures require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
Motions to intervene and protests may be filed electronically via
the Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (https://www.ferc.gov) under the ``e-
Filing'' link.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. The proposed project would utilize the Bureau of Reclamation's
existing Clark Canyon dam, and would consist of the following new
facilities: (1) A steel liner in the existing 9-foot-diameter concrete
outlet conduit; (2) a new outlet gate structure; (3) a 9-foot-diameter
steel penstock bifurcating into an 8-foot diameter and a 6-foot
diameter steel penstock directing flow to the turbine units about 70
feet from the bifurcation; (4) a powerhouse containing two generating
units with a combined capacity of 4.75 megawatts; (5) a 300-foot-long
access road; (6) a switchyard; (7) a substation; and (8) about 0.3 mile
of transmission line connecting the project to the local utility's
existing transmission system. The average annual generation is
estimated to be 16.5 gigawatthours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before the specified deadline date
for the particular application, a competing development application, or
a notice of intent to file such an application. Submission of a timely
notice of intent allows an interested person to file the competing
development application no later than 120 days after the specified
deadline date for the particular application. Applications for
preliminary permits will not be accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit, if such an application may
be filed, either a preliminary permit application or a development
application (specify which type of application). A notice of intent
must be served on the applicant named in this public notice.
Anyone may submit a protest or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210, 385.211, and 385.214. In determining the appropriate action to
take, the Commission will consider all protests filed, but only those
who file a motion to intervene in accordance with the Commission's
Rules may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular application.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) Bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR
[[Page 24581]]
385.2001 through 385.2005. Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application.
o. Procedural schedule: The application will be processed according
to the following Hydro Licensing Schedule. Revisions to the schedule
will be made as appropriate.
------------------------------------------------------------------------
Date
------------------------------------------------------------------------
Issue Scoping Document 1 for comments. May 2007.
Issue Scoping Document 2.............. August 2007.
Additional information due............ December 2007.
Notice of application is ready for January 2008.
environmental analysis.
Notice of the availability of the EA.. July 2008.
Ready for Commission's decision on the October 2008.
application.
------------------------------------------------------------------------
Kimberly D. Bose,
Secretary.
[FR Doc. E7-8408 Filed 5-2-07; 8:45 am]
BILLING CODE 6717-01-P