Brazos Electric Power Cooperative, Inc.; Notice Granting Motion To Suspend Compliance Obligations, 19914 [E7-7576]

Download as PDF 19914 Federal Register / Vol. 72, No. 76 / Friday, April 20, 2007 / Notices DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. EL06–44–005] [Docket No. TX07–1–000] Avista Energy, Inc.; Notice of Compliance Filing Brazos Electric Power Cooperative, Inc.; Notice Granting Motion To Suspend Compliance Obligations sroberts on PROD1PC70 with NOTICES April 13, 2007. Take notice that on March 30, 2007, Avista Energy, Inc. submitted a compliance filing pursuant to the Commission’s March 14, 2007 request to explain and justify the price of one transaction in excess of the Commission’s WECC price soft-cap of $400. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on April 30, 2007. Kimberly D. Bose, Secretary. [FR Doc. E7–7567 Filed 4–19–07; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 18:57 Apr 19, 2007 Jkt 211001 April 13, 2007. On March 15, 2007, the Commission issued an Order Directing Interconnection and Transmission Services and Approving Settlement Agreement in Brazos Electric Power Cooperative, Inc., 118 FERC ¶ 61,199 (2007) (March 15 Order). On March 30, 2007, Brazos Electric Power Cooperative, Inc. filed a motion requesting suspension of the obligations the Commission imposed in the March 15 Order, pending final Commission action in this proceeding. Upon consideration, the obligations the Commission imposed in the March 15 Order are suspended pending further Commission action in this proceeding. Kimberly D. Bose, Secretary. [FR Doc. E7–7576 Filed 4–19–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission CenterPoint Energy Gas Transmission Company; Notice of Negotiated Rate Filing April 13, 2007. Fmt 4703 This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Secretary. [FR Doc. E7–7575 Filed 4–19–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Take notice that on March 30, 2007, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval a negotiated rate agreement between CEGT and Coral Energy Resources, LP. CEGT has entered into an agreement to provide parking service to this shipper under Rate Schedule PHS to be effective April 1, 2007. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as Frm 00039 The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Kimberly D. Bose, [Docket No. RP96–200–172] PO 00000 appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. Sfmt 4703 Federal Energy Regulatory Commission [Docket No. RP07–398–000] Cheyenne Plains Gas Pipeline Company, LLC; Notice of Tariff Filing April 13, 2007. Take notice that on April 12, 2007, Cheyenne Plains Gas Pipeline Company, L.L.C. (Cheyenne Plains) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, Sixth Revised Sheet No. 1 to become effective May 13, 2007. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of E:\FR\FM\20APN1.SGM 20APN1

Agencies

[Federal Register Volume 72, Number 76 (Friday, April 20, 2007)]
[Notices]
[Page 19914]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-7576]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. TX07-1-000]


Brazos Electric Power Cooperative, Inc.; Notice Granting Motion 
To Suspend Compliance Obligations

April 13, 2007.
    On March 15, 2007, the Commission issued an Order Directing 
Interconnection and Transmission Services and Approving Settlement 
Agreement in Brazos Electric Power Cooperative, Inc., 118 FERC ] 61,199 
(2007) (March 15 Order).
    On March 30, 2007, Brazos Electric Power Cooperative, Inc. filed a 
motion requesting suspension of the obligations the Commission imposed 
in the March 15 Order, pending final Commission action in this 
proceeding.
    Upon consideration, the obligations the Commission imposed in the 
March 15 Order are suspended pending further Commission action in this 
proceeding.

Kimberly D. Bose,
Secretary.
 [FR Doc. E7-7576 Filed 4-19-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.