Avista Energy, Inc.; Notice of
Compliance Filing
Brazos Electric Power Cooperative,
Inc.; Notice Granting Motion To
Suspend Compliance Obligations
sroberts on PROD1PC70 with NOTICES
April 13, 2007.
Take notice that on March 30, 2007,
Avista Energy, Inc. submitted a
compliance filing pursuant to the
Commission’s March 14, 2007 request to
explain and justify the price of one
transaction in excess of the
Commission’s WECC price soft-cap of
$400.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on April 30, 2007.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–7567 Filed 4–19–07; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:57 Apr 19, 2007
Jkt 211001
April 13, 2007.
On March 15, 2007, the Commission
issued an Order Directing
Interconnection and Transmission
Services and Approving Settlement
Agreement in Brazos Electric Power
Cooperative, Inc., 118 FERC ¶ 61,199
(2007) (March 15 Order).
On March 30, 2007, Brazos Electric
Power Cooperative, Inc. filed a motion
requesting suspension of the obligations
the Commission imposed in the March
15 Order, pending final Commission
action in this proceeding.
Upon consideration, the obligations
the Commission imposed in the March
15 Order are suspended pending further
Commission action in this proceeding.
Kimberly D. Bose,
Secretary.
[FR Doc. E7–7576 Filed 4–19–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
CenterPoint Energy Gas Transmission
Company; Notice of Negotiated Rate
Filing
April 13, 2007.
Fmt 4703
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Secretary.
[FR Doc. E7–7575 Filed 4–19–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Take notice that on March 30, 2007,
CenterPoint Energy Gas Transmission
Company (CEGT) tendered for filing and
approval a negotiated rate agreement
between CEGT and Coral Energy
Resources, LP. CEGT has entered into an
agreement to provide parking service to
this shipper under Rate Schedule PHS
to be effective April 1, 2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
Frm 00039
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Kimberly D. Bose,
[Docket No. RP96–200–172]
PO 00000
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of Section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. RP07–398–000]
Cheyenne Plains Gas Pipeline
Company, LLC; Notice of Tariff Filing
April 13, 2007.
Take notice that on April 12, 2007,
Cheyenne Plains Gas Pipeline Company,
L.L.C. (Cheyenne Plains) tendered for
filing as part of its FERC Gas Tariff,
Original Volume No. 1, Sixth Revised
Sheet No. 1 to become effective May 13,
2007.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
E:\FR\FM\20APN1.SGM
20APN1
Agencies
[Federal Register Volume 72, Number 76 (Friday, April 20, 2007)]
[Notices]
[Page 19914]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-7576]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. TX07-1-000]
Brazos Electric Power Cooperative, Inc.; Notice Granting Motion
To Suspend Compliance Obligations
April 13, 2007.
On March 15, 2007, the Commission issued an Order Directing
Interconnection and Transmission Services and Approving Settlement
Agreement in Brazos Electric Power Cooperative, Inc., 118 FERC ] 61,199
(2007) (March 15 Order).
On March 30, 2007, Brazos Electric Power Cooperative, Inc. filed a
motion requesting suspension of the obligations the Commission imposed
in the March 15 Order, pending final Commission action in this
proceeding.
Upon consideration, the obligations the Commission imposed in the
March 15 Order are suspended pending further Commission action in this
proceeding.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-7576 Filed 4-19-07; 8:45 am]