Environmental Impacts Statements; Notice of Availability, 19928-19929 [E7-7543]

Download as PDF sroberts on PROD1PC70 with NOTICES 19928 Federal Register / Vol. 72, No. 76 / Friday, April 20, 2007 / Notices from Production Fields in eastern Texas to Markets in the Gulf Coast, Midwestern, Northeastern and Southeastern United States. Summary: EPA does not object to the proposed action, but suggests updating the air quality impact analysis. Rating LO. EIS No. 20070052, ERP No. D–NPS– D61059–PA, Valley Forge National Historical Park, General Management Plan, Implementation, King of Prussia, PA. Summary: EPA expressed environmental concerns about potential adverse impacts of the proposed actions to water quality and wetlands. The Final EIS should detail how the two proposed bridges, removal of dams, potential for mobilization of contaminants in sediments behind the dam, increased stormwater flow and changing forested habitat to meadow will impact already impaired waters and wildlife habitat. Rating EC2. EIS No. 20070056, ERP No. D–FHW– G40193–LA, I–49 South Project, from Raceland to the Westbank Expressway Route U.S. 90, Funding, Coast Guard Bridge Permit, U.S. Army COE Section 10 and 404 Permits, Jefferson, Lafourche, and St. Charles Parishes, LA. Summary: EPA does not object to the proposed action, but requests clarification on some air quality issues. Rating LO. EIS No. 20070070, ERP No. DA–AFS– K65283–CA, Empire Vegetation Management Project, Supplemental Information to Clarify Cumulative Effects Analysis, Mount Hough Ranger District, Plumas National Forest, Plumas County, CA. Summary: EPA does not object to the proposed action, but requests clarification of monitoring and adaptive management issues. Rating LO. EIS No. 20060236, ERP No. DS–AFS– L65383–ID, Hidden Cedar Project, Updated Information, Manage Vegetation Conditions and the Transportation System, Idaho Panhandle National Forests, St. Joe Ranger District, Benewah, Latah and Shoshone Counties, ID. Summary: EPA expressed environmental concerns about the potential adverse of water quality impacts due to the proposed increase in road miles which would occur in watersheds that are already impaired from existing high road densities, as well as past mining and grazing activities. Rating EC2. VerDate Aug<31>2005 18:52 Apr 19, 2007 Jkt 211001 Final EISs EIS No. 20070024, ERP No. F–AFS– D65033–PA, West Branch of Tionesta Project, Multiple Resource Management, Implementation Bradford Ranger District, Allegheny National Forest, Warren County, PA. Summary: EPA does not object to the proposed project. EIS No. 20070074, ERP No. F–SFW– K65493–CA, East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan, Implementation, Incidental Take Permit, Cities of Brentwood, Clayton, Oakley and Pittsburg, Contra Costa County, CA. Summary: EPA’s previous concerns have been addressed; therefore, EPA does not object to the proposed action. EIS No. 20070076, ERP No. F–AFS– F65064–WI, Boulder Project, Timber Harvesting, Vegetation and Road Management, U.S. Army COE Section 404 Permit, Chequamegon-Nicolet National Forest, Lakewood-Laona Ranger District, Oconto and Langlade Counties, WI. Summary: While the final EIS addressed EPA’s request for additional analysis of cumulative impacts, EPA continues to have environmental concerns about the lack of specific habitat information. EIS No. 20070081, ERP No. F–JUS– G81013–TX, Laredo Detention Facility, Proposed Contractor-Owned/ Contractor-Operated Detention Facility, Implementation, Webb County, TX. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20070082, ERP No. F–GSA– D81037–VA, Federal Bureau of Investigation (FBI) Central Records Complex, Alternative 4—Sempeles Site, Winchester, Frederick County, VA. Summary: EPA does not object to the proposed action. EIS No. 20070090, ERP No. F–AFS– J65462–00, Dakota Prairie Grasslands Noxious Weed Management Project, Implementation, Billings, Slope, Golden Valley, Sioux, Grant, McHenry, Ransom and Richland Counties, ND and Corson, Perkins, and Ziebach Counties, SD. Summary: No formal comment letter was sent to the preparing agency. Dated: April 17, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–7547 Filed 4–19–07; 8:45 am] BILLING CODE 6560–50–P PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6686–1] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements filed 04/09/2007 through 04/13/2007 pursuant to 40 CFR 1506.9. EIS No. 20070144, Final EIS, AFS, CA, Brown Project, Proposal to Improve Forest Health by Reducing Overcrowded Forest Stand Conditions, Trinity River Management Unit, Shasta-Trinity National Forest, Weaverville Ranger District, Trinity County, CA, Wait Period Ends: 05/21/2007, Contact: Joyce Andersen 530–623–2121. EIS No. 20070145, Draft Supplement, AFS, UT, Ogden Ranger District Travel Plan Revision, To Present Additional Analysis for Six Alternatives, Wasatch-Cache National Forest, Ogden Ranger District, Box Elder, Cache, Morgan, Weber and Rich Counties, UT, Comment Period Ends: 06/04/2007, Contact: Rick Vallejos 801–625–5112. EIS No. 20070146, Final EIS, COE, CA, ADOPTION—Folsom Dam Safety and Flood Damage Reduction Project, Addressing Hydrologic, Seismic, Static, and Flood Management Issues, Sacramento, El Dorado and Placer Counties, CA, Wait Period Ends: 05/ 21/2007, Contact: Jane Rinck 916– 557–6715. EIS No. 20070147, Draft EIS, AFS, MT, Trapper Bunk House Land Stewardship Project, Reduce Risk from Stand-Replacing and Uncontrollable Fires, Improve Resiliency and Provide Forest Products, Fuel Reduction Research and Watershed Improvement, Bitterroot National Forest, Darby Ranger District, Ravalli County, MT, Comment Period Ends: 06/04/2007, Contact: Chuck Oliver 406–821–3913. EIS No. 20070148, Final EIS, FHW, NC, US 64 Corridor Project, Transportation Improvements in the Vicinity of the City of Asheboro and Improved Access to the NC Zoological Park, Funding and COE Section 404 Permit, Transportation Improvement Program (TIP) Project No. R–2536, Randolph County, NC, Wait Period Ends: 05/21/2007, Contact: John F. Sullivan 919–856–4346. EIS No. 20070149, Draft EIS, FRC, 00, Southeast Expansion Project, E:\FR\FM\20APN1.SGM 20APN1 Federal Register / Vol. 72, No. 76 / Friday, April 20, 2007 / Notices sroberts on PROD1PC70 with NOTICES Construction and Operation of 110.8 miles for Natural Gas Pipeline and Associated Ancillary Facilities, TX and LA , Comment Period Ends: 06/ 04/2007 Contact: Andy Black 1–866– 208–3372. EIS No. 20070150, Draft EIS, FRC, WI, Gurardian Expansion and Extension Project, Construction and Operation Natural Gas Pipeline Facilities, Jefferson, Dodge, Fond du Lac, Calument, Brown, Walworth, Outagamie Counties, WI, Comment Period Ends: 06/04/2007, Contact: Andy Black 1–866–208–3372. EIS No. 20070151, Draft EIS, BLM, NV, White Pine Energy Station Project, Construction and Operation, Coalfired Electric Power Generating Plant, White Pine County, NV, Comment Period Ends: 06/19/2007, Contact: Doris Metcalf 775–289–1852. EIS No. 20070152, Draft EIS, GSA, OH, Cincinnati National Institute for Occupational Safety and Health (NIOSH) Laboratories Consolidation, Site Selection, Hamilton and Clermont Counties, OH, Comment Period Ends: 06/04/2007, Contact: Phil Youngberg 404–433–83–93. EIS No. 20070153, Draft EIS, BLM, NM, Socorro Resource Management Plan Revision, Implementation, Socorro and Catron Counties, NM, Comment Period Ends: 07/19/2007, Contact: Brian Bellew 505–838–1273. EIS No. 20070154, Draft EIS, NOA, 00, Amendment 27 to the Reef Fish Fishery Management Plan and Amendment 14 to the Shrimp Fishery Management Plan, To Address Stock Rebuilding and Overfishing of Red Snapper, Gulf of Mexico, Comment Period Ends: 06/04/2007, Contact: Roy E. Crabtree 727–824–5701. EIS No. 20070155, Draft EIS, COE, GA, Fort Benning U.S. Army Reserve Center, Base Realignment and Closure (BRAC) 2005 and Transformation Actions, Chattahoochee and Muscogee Counties, GA, Comment Period Ends: 06/04/2007, Contact: John Brent 706–545–2180. EIS No. 20070156, Final EIS, NOA, CA, Channel Islands National Marine Sanctuary (CINMS) Project, Establishment of No-Take and Limited-Take Marine Zones, Protection of Sanctuary Biodiversity, CA, Wait Period Ends: 05/21/2007, Contact: Chris Mobley 805–966–7107. Amended Notices EIS No. 20070063, Draft Supplement, USN, 00, Introduction of F/A 18 E/F (Super Hornet) Aircraft, Updated Information, Construction and Operation of an Outlying Landing Field, Naval Air Station (NAS) VerDate Aug<31>2005 18:52 Apr 19, 2007 Jkt 211001 Oceana, VA; Marine Corps Air Station (MCAS) Cherry Point, NC, Wait Period Ends: 05/19/2007, Contact: Francine Blend 757–322–4332. Revision to FR Notice Published 02/ 23/2007: Extending Comment Period from 04/24/2007 to 05/19/2007. EIS No. 20070115, Draft EIS, FAA, FL, Fort Lauderdale-Hollywood International Airport, Proposed Development and Extension of Runway 9R/27L and other Associated Airport Projects, Funding, U.S. Army COE Section 404 Permit and NPDES Permit, Fort Lauderdale, Broward County, FL, Wait Period Ends: 05/21/ 2007, Contact: Virginia Lane 407– 812–6331 Ext. 129. Revision to FR Notice Published 03/ 30/2007: Extending Comment Period from 05/14/2007 to 05/21/ 2007. Dated: April 17, 2007. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E7–7543 Filed 4–19–07; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2007–0333; FRL–8126–3] Pesticide Program Dialogue Committee; Notice of Public Meetings Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: Pursuant to the Federal Advisory Committee Act, EPA gives notice of a public meeting of the Pesticide Program Dialogue Committee (PPDC) on May 9 and 10, 2007. In addition, the PPDC Worker Safety Work Group will meet prior to the PPDC meeting on May 8, 2007. The agenda is being developed and will include reports from the following PPDC Work Groups: Spray Drift/NPDES; PRIA Process Improvements; Registration Review Implementation; AZM Transition Issues; Performance Measures; and Worker Safety. Program updates will also be included for Registration and Reregistration/ Tolerance Reassessment. DATES: The PPDC meeting will be held on Wednesday, May 9, 2007, from 9 a.m. to 5 p.m., and Thursday, May 10, from 8:30 a.m. to 12:30 p.m. The PPDC Worker Risk Work Group will meet on Tuesday, May 8, 2007, from 9 a.m. to 4:30 p.m. To request accommodation of a disability, please contact the person PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 19929 listed under FOR FURTHER INFORMATON preferably at least 10 days prior to the meeting, to give EPA as much time as possible to process your request. ADDRESSES: The meeting will be held at EPA’s Conference Center, Lobby Level, One Potomac Yard (South Building), 2777 S. Crystal Drive, Arlington, VA. This location is approximately a half mile from the Crystal City Metro Station. CONTACT, FOR FURTHER INFORMATION CONTACT: Margie Fehrenbach, Office of Pesticide Programs (7501P), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., Washington, DC 20460– 0001; telephone number: (703) 308– 4775; fax number: (703) 308–4776; email address:fehrenbach.margie@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this Action Apply to Me? This action is directed to the public in general, and may be of particular interest to persons who work in agricultural settings or persons who are concerned about implementation of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); the Federal Food, Drug, and Cosmetic Act (FFDCA); and the amendments to both of these major pesticide laws by the Food Quality Protection Act (FQPA) of 1996. Potentially affected entities may include, but are not limited to: Agricultural workers and farmers; pesticide industry and trade associations; environmental, consumer, and farmworker groups; pesticide users and growers; pest consultants; State, local and Tribal governments; academia; public health organizations; food processors; and the public. If you have questions regarding the applicability of this action to a particular entity, consult the person listed under FOR FURTHER INFORMATION CONTACT. B. How Can I Get Copies of this Document and Other Related Information? 1. Docket. EPA has established a docket for this action under docket identification (ID) number EPA–HQ– OPP–0333. Although a part of the official docket, the public docket does not include Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Publicly available docket materials are available either in the electronic docket at https://www.regulations.gov, or, if only available in hard copy, at the Office of Pesticide Programs (OPP) Regulatory E:\FR\FM\20APN1.SGM 20APN1

Agencies

[Federal Register Volume 72, Number 76 (Friday, April 20, 2007)]
[Notices]
[Pages 19928-19929]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-7543]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6686-1]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements filed 04/09/2007 
through 04/13/2007 pursuant to 40 CFR 1506.9.

EIS No. 20070144, Final EIS, AFS, CA, Brown Project, Proposal to 
Improve Forest Health by Reducing Overcrowded Forest Stand Conditions, 
Trinity River Management Unit, Shasta-Trinity National Forest, 
Weaverville Ranger District, Trinity County, CA, Wait Period Ends: 05/
21/2007, Contact: Joyce Andersen 530-623-2121.
EIS No. 20070145, Draft Supplement, AFS, UT, Ogden Ranger District 
Travel Plan Revision, To Present Additional Analysis for Six 
Alternatives, Wasatch-Cache National Forest, Ogden Ranger District, Box 
Elder, Cache, Morgan, Weber and Rich Counties, UT, Comment Period Ends: 
06/04/2007, Contact: Rick Vallejos 801-625-5112.
EIS No. 20070146, Final EIS, COE, CA, ADOPTION--Folsom Dam Safety and 
Flood Damage Reduction Project, Addressing Hydrologic, Seismic, Static, 
and Flood Management Issues, Sacramento, El Dorado and Placer Counties, 
CA, Wait Period Ends: 05/21/2007, Contact: Jane Rinck 916-557-6715.
EIS No. 20070147, Draft EIS, AFS, MT, Trapper Bunk House Land 
Stewardship Project, Reduce Risk from Stand-Replacing and 
Uncontrollable Fires, Improve Resiliency and Provide Forest Products, 
Fuel Reduction Research and Watershed Improvement, Bitterroot National 
Forest, Darby Ranger District, Ravalli County, MT, Comment Period Ends: 
06/04/2007, Contact: Chuck Oliver 406-821-3913.
EIS No. 20070148, Final EIS, FHW, NC, US 64 Corridor Project, 
Transportation Improvements in the Vicinity of the City of Asheboro and 
Improved Access to the NC Zoological Park, Funding and COE Section 404 
Permit, Transportation Improvement Program (TIP) Project No. R-2536, 
Randolph County, NC, Wait Period Ends: 05/21/2007, Contact: John F. 
Sullivan 919-856-4346.
EIS No. 20070149, Draft EIS, FRC, 00, Southeast Expansion Project,

[[Page 19929]]

Construction and Operation of 110.8 miles for Natural Gas Pipeline and 
Associated Ancillary Facilities, TX and LA , Comment Period Ends: 06/
04/2007 Contact: Andy Black 1-866-208-3372.
EIS No. 20070150, Draft EIS, FRC, WI, Gurardian Expansion and Extension 
Project, Construction and Operation Natural Gas Pipeline Facilities, 
Jefferson, Dodge, Fond du Lac, Calument, Brown, Walworth, Outagamie 
Counties, WI, Comment Period Ends: 06/04/2007, Contact: Andy Black 1-
866-208-3372.
EIS No. 20070151, Draft EIS, BLM, NV, White Pine Energy Station 
Project, Construction and Operation, Coal-fired Electric Power 
Generating Plant, White Pine County, NV, Comment Period Ends: 06/19/
2007, Contact: Doris Metcalf 775-289-1852.
EIS No. 20070152, Draft EIS, GSA, OH, Cincinnati National Institute for 
Occupational Safety and Health (NIOSH) Laboratories Consolidation, Site 
Selection, Hamilton and Clermont Counties, OH, Comment Period Ends: 06/
04/2007, Contact: Phil Youngberg 404-433-83-93.
EIS No. 20070153, Draft EIS, BLM, NM, Socorro Resource Management Plan 
Revision, Implementation, Socorro and Catron Counties, NM, Comment 
Period Ends: 07/19/2007, Contact: Brian Bellew 505-838-1273.
EIS No. 20070154, Draft EIS, NOA, 00, Amendment 27 to the Reef Fish 
Fishery Management Plan and Amendment 14 to the Shrimp Fishery 
Management Plan, To Address Stock Rebuilding and Overfishing of Red 
Snapper, Gulf of Mexico, Comment Period Ends: 06/04/2007, Contact: Roy 
E. Crabtree 727-824-5701.
EIS No. 20070155, Draft EIS, COE, GA, Fort Benning U.S. Army Reserve 
Center, Base Realignment and Closure (BRAC) 2005 and Transformation 
Actions, Chattahoochee and Muscogee Counties, GA, Comment Period Ends: 
06/04/2007, Contact: John Brent 706-545-2180.
EIS No. 20070156, Final EIS, NOA, CA, Channel Islands National Marine 
Sanctuary (CINMS) Project, Establishment of No-Take and Limited-Take 
Marine Zones, Protection of Sanctuary Biodiversity, CA, Wait Period 
Ends: 05/21/2007, Contact: Chris Mobley 805-966-7107.

Amended Notices

EIS No. 20070063, Draft Supplement, USN, 00, Introduction of F/A 18 E/F 
(Super Hornet) Aircraft, Updated Information, Construction and 
Operation of an Outlying Landing Field, Naval Air Station (NAS) Oceana, 
VA; Marine Corps Air Station (MCAS) Cherry Point, NC, Wait Period Ends: 
05/19/2007, Contact: Francine Blend 757-322-4332. Revision to FR Notice 
Published 02/23/2007: Extending Comment Period from 04/24/2007 to 05/
19/2007.
EIS No. 20070115, Draft EIS, FAA, FL, Fort Lauderdale-Hollywood 
International Airport, Proposed Development and Extension of Runway 9R/
27L and other Associated Airport Projects, Funding, U.S. Army COE 
Section 404 Permit and NPDES Permit, Fort Lauderdale, Broward County, 
FL, Wait Period Ends: 05/21/2007, Contact: Virginia Lane 407-812-6331 
Ext. 129.

    Revision to FR Notice Published 03/30/2007: Extending Comment
    Period from 05/14/2007 to 05/21/2007.

    Dated: April 17, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E7-7543 Filed 4-19-07; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.