Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY, 18884 [E7-7155]
Download as PDF
18884
Federal Register / Vol. 72, No. 72 / Monday, April 16, 2007 / Rules and Regulations
a foreign central bank, when the
exportation of such 5-cent coins and
one-cent coins is for use as circulating
money.
*
*
*
*
*
Dated: April 10, 2007.
Edmund C. Moy,
Director, United States Mint.
[FR Doc. E7–7088 Filed 4–13–07; 8:45 am]
BILLING CODE 4810–02–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–07–030]
Drawbridge Operation Regulations;
Quinnipiac River, New Haven, CT
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
cprice-sewell on PROD1PC66 with RULES
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Ferry Street Bridge,
across the Quinnipiac River, mile 0.7, at
New Haven, Connecticut. This
deviation, allows the bridge owner to
keep one of the two moveable bascule
spans in the closed position from April
16, 2007 through September 27, 2007.
This deviation is necessary to facilitate
scheduled bridge maintenance.
DATES: This deviation is effective from
April 16, 2007 through September 27,
2007.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, One
South Street, New York, New York
10004, between 7 a.m. and 3 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (212)
668–7165. The First Coast Guard
District Bridge Branch Office maintains
the public docket for this temporary
deviation.
FOR FURTHER INFORMATION CONTACT: Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7165.
SUPPLEMENTARY INFORMATION: The Ferry
Street Bridge, across the Quinnipiac
River, mile 0.7, at New Haven,
Connecticut, has a vertical clearance in
the closed position of 25 feet at mean
high water and 31 feet at mean low
water. The existing regulation requires
the bridge to open on demand except for
certain morning, mid-day and evening
hours.
VerDate Aug<31>2005
15:00 Apr 13, 2007
Jkt 211001
Connecticut Department of
Transportation on behalf of the owner of
the bridge, the City of New Haven,
requested a temporary deviation to
facilitate scheduled structural bridge
fender repairs and painting at the
bridge.
In order to perform the structural
repairs, one bascule span will remain in
the closed position and the other span
will remain open.
Under this temporary deviation the
Ferry Street Bridge across the
Quinnipiac River, mile 0.7, at New
Haven, Connecticut, may keep one of
the two movable spans closed from
April 16, 2007 through September 27,
2007.
Should the bridge maintenance
authorized by this temporary deviation
be completed before the end of the
effective period published in this notice,
the Coast Guard will rescind the
remainder of this temporary deviation,
and the bridge shall be returned to its
normal operating schedule. Notice of
the above action shall be provided to the
public in the Local Notice to Mariners
and the Federal Register, where
practicable.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: April 6, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E7–7156 Filed 4–13–07; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD01–07–032]
Drawbridge Operation Regulations;
Reynolds Channel, Lawrence, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Atlantic Beach
Bridge across Reynolds Channel, mile
0.4, at Lawrence, New York. Under this
temporary deviation a one-hour advance
notice will be required for bridge
openings from April 9, 2007 through
April 27, 2007, between 7 a.m. and 3:30
p.m., daily. This deviation is necessary
to facilitate scheduled bridge
maintenance.
PO 00000
Frm 00038
Fmt 4700
Sfmt 4700
This deviation is effective from
April 9, 2007 through April 27, 2007.
DATES:
Materials referred to in this
document are available for inspection or
copying at the First Coast Guard
District, Bridge Branch Office, One
South Street, New York, New York,
10004, between 7 a.m. and 3 p.m.,
Monday through Friday, except Federal
holidays. The telephone number is (212)
668–7165. The First Coast Guard
District Bridge Branch Office maintains
the public docket for this temporary
deviation.
ADDRESSES:
Judy
Leung-Yee, Project Officer, First Coast
Guard District, at (212) 668–7165.
FOR FURTHER INFORMATION CONTACT:
The
Atlantic Beach Bridge across Reynolds
Channel, mile 0.4, at Lawrence, New
York, has a vertical clearance in the
closed position of 25 feet at mean high
water and 30 feet at mean low water.
The existing operating regulations are
listed at 33 CFR 117.799.
The bridge owner, Nassau County
Bridge Authority, requested a temporary
deviation to allow the bridge owner to
require a one-hour advance notice for
bridge openings to facilitate scheduled
mechanical bridge maintenance.
Under this temporary deviation a onehour advance notice shall be required
for bridge openings at the Atlantic
Beach Bridge from April 9, 2007
through April 27, 2007, between 7 a.m.
and 3:30 p.m., daily.
Should the bridge maintenance
authorized by this temporary deviation
be completed before the end of the
effective period published in this notice,
the Coast Guard will rescind the
remainder of this temporary deviation,
and the bridge shall be returned to its
normal operating schedule. Notice of
the above action shall be provided to the
public in the Local Notice to Mariners
and the Federal Register, where
practicable.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
SUPPLEMENTARY INFORMATION:
Dated: April 6, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E7–7155 Filed 4–13–07; 8:45 am]
BILLING CODE 4910–15–P
E:\FR\FM\16APR1.SGM
16APR1
Agencies
[Federal Register Volume 72, Number 72 (Monday, April 16, 2007)]
[Rules and Regulations]
[Page 18884]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-7155]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD01-07-032]
Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Atlantic Beach Bridge across Reynolds Channel, mile 0.4, at Lawrence,
New York. Under this temporary deviation a one-hour advance notice will
be required for bridge openings from April 9, 2007 through April 27,
2007, between 7 a.m. and 3:30 p.m., daily. This deviation is necessary
to facilitate scheduled bridge maintenance.
DATES: This deviation is effective from April 9, 2007 through April 27,
2007.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at the First Coast Guard District, Bridge Branch
Office, One South Street, New York, New York, 10004, between 7 a.m. and
3 p.m., Monday through Friday, except Federal holidays. The telephone
number is (212) 668-7165. The First Coast Guard District Bridge Branch
Office maintains the public docket for this temporary deviation.
FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First
Coast Guard District, at (212) 668-7165.
SUPPLEMENTARY INFORMATION: The Atlantic Beach Bridge across Reynolds
Channel, mile 0.4, at Lawrence, New York, has a vertical clearance in
the closed position of 25 feet at mean high water and 30 feet at mean
low water. The existing operating regulations are listed at 33 CFR
117.799.
The bridge owner, Nassau County Bridge Authority, requested a
temporary deviation to allow the bridge owner to require a one-hour
advance notice for bridge openings to facilitate scheduled mechanical
bridge maintenance.
Under this temporary deviation a one-hour advance notice shall be
required for bridge openings at the Atlantic Beach Bridge from April 9,
2007 through April 27, 2007, between 7 a.m. and 3:30 p.m., daily.
Should the bridge maintenance authorized by this temporary
deviation be completed before the end of the effective period published
in this notice, the Coast Guard will rescind the remainder of this
temporary deviation, and the bridge shall be returned to its normal
operating schedule. Notice of the above action shall be provided to the
public in the Local Notice to Mariners and the Federal Register, where
practicable.
This deviation from the operating regulations is authorized under
33 CFR 117.35.
Dated: April 6, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E7-7155 Filed 4-13-07; 8:45 am]
BILLING CODE 4910-15-P