Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY, 18884 [E7-7155]

Download as PDF 18884 Federal Register / Vol. 72, No. 72 / Monday, April 16, 2007 / Rules and Regulations a foreign central bank, when the exportation of such 5-cent coins and one-cent coins is for use as circulating money. * * * * * Dated: April 10, 2007. Edmund C. Moy, Director, United States Mint. [FR Doc. E7–7088 Filed 4–13–07; 8:45 am] BILLING CODE 4810–02–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [CGD01–07–030] Drawbridge Operation Regulations; Quinnipiac River, New Haven, CT Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: cprice-sewell on PROD1PC66 with RULES ACTION: SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Ferry Street Bridge, across the Quinnipiac River, mile 0.7, at New Haven, Connecticut. This deviation, allows the bridge owner to keep one of the two moveable bascule spans in the closed position from April 16, 2007 through September 27, 2007. This deviation is necessary to facilitate scheduled bridge maintenance. DATES: This deviation is effective from April 16, 2007 through September 27, 2007. ADDRESSES: Materials referred to in this document are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, One South Street, New York, New York 10004, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. The telephone number is (212) 668–7165. The First Coast Guard District Bridge Branch Office maintains the public docket for this temporary deviation. FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First Coast Guard District, at (212) 668–7165. SUPPLEMENTARY INFORMATION: The Ferry Street Bridge, across the Quinnipiac River, mile 0.7, at New Haven, Connecticut, has a vertical clearance in the closed position of 25 feet at mean high water and 31 feet at mean low water. The existing regulation requires the bridge to open on demand except for certain morning, mid-day and evening hours. VerDate Aug<31>2005 15:00 Apr 13, 2007 Jkt 211001 Connecticut Department of Transportation on behalf of the owner of the bridge, the City of New Haven, requested a temporary deviation to facilitate scheduled structural bridge fender repairs and painting at the bridge. In order to perform the structural repairs, one bascule span will remain in the closed position and the other span will remain open. Under this temporary deviation the Ferry Street Bridge across the Quinnipiac River, mile 0.7, at New Haven, Connecticut, may keep one of the two movable spans closed from April 16, 2007 through September 27, 2007. Should the bridge maintenance authorized by this temporary deviation be completed before the end of the effective period published in this notice, the Coast Guard will rescind the remainder of this temporary deviation, and the bridge shall be returned to its normal operating schedule. Notice of the above action shall be provided to the public in the Local Notice to Mariners and the Federal Register, where practicable. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: April 6, 2007. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. E7–7156 Filed 4–13–07; 8:45 am] BILLING CODE 4910–15–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [CGD01–07–032] Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Atlantic Beach Bridge across Reynolds Channel, mile 0.4, at Lawrence, New York. Under this temporary deviation a one-hour advance notice will be required for bridge openings from April 9, 2007 through April 27, 2007, between 7 a.m. and 3:30 p.m., daily. This deviation is necessary to facilitate scheduled bridge maintenance. PO 00000 Frm 00038 Fmt 4700 Sfmt 4700 This deviation is effective from April 9, 2007 through April 27, 2007. DATES: Materials referred to in this document are available for inspection or copying at the First Coast Guard District, Bridge Branch Office, One South Street, New York, New York, 10004, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. The telephone number is (212) 668–7165. The First Coast Guard District Bridge Branch Office maintains the public docket for this temporary deviation. ADDRESSES: Judy Leung-Yee, Project Officer, First Coast Guard District, at (212) 668–7165. FOR FURTHER INFORMATION CONTACT: The Atlantic Beach Bridge across Reynolds Channel, mile 0.4, at Lawrence, New York, has a vertical clearance in the closed position of 25 feet at mean high water and 30 feet at mean low water. The existing operating regulations are listed at 33 CFR 117.799. The bridge owner, Nassau County Bridge Authority, requested a temporary deviation to allow the bridge owner to require a one-hour advance notice for bridge openings to facilitate scheduled mechanical bridge maintenance. Under this temporary deviation a onehour advance notice shall be required for bridge openings at the Atlantic Beach Bridge from April 9, 2007 through April 27, 2007, between 7 a.m. and 3:30 p.m., daily. Should the bridge maintenance authorized by this temporary deviation be completed before the end of the effective period published in this notice, the Coast Guard will rescind the remainder of this temporary deviation, and the bridge shall be returned to its normal operating schedule. Notice of the above action shall be provided to the public in the Local Notice to Mariners and the Federal Register, where practicable. This deviation from the operating regulations is authorized under 33 CFR 117.35. SUPPLEMENTARY INFORMATION: Dated: April 6, 2007. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. E7–7155 Filed 4–13–07; 8:45 am] BILLING CODE 4910–15–P E:\FR\FM\16APR1.SGM 16APR1

Agencies

[Federal Register Volume 72, Number 72 (Monday, April 16, 2007)]
[Rules and Regulations]
[Page 18884]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-7155]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[CGD01-07-032]


Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
Atlantic Beach Bridge across Reynolds Channel, mile 0.4, at Lawrence, 
New York. Under this temporary deviation a one-hour advance notice will 
be required for bridge openings from April 9, 2007 through April 27, 
2007, between 7 a.m. and 3:30 p.m., daily. This deviation is necessary 
to facilitate scheduled bridge maintenance.

DATES: This deviation is effective from April 9, 2007 through April 27, 
2007.

ADDRESSES: Materials referred to in this document are available for 
inspection or copying at the First Coast Guard District, Bridge Branch 
Office, One South Street, New York, New York, 10004, between 7 a.m. and 
3 p.m., Monday through Friday, except Federal holidays. The telephone 
number is (212) 668-7165. The First Coast Guard District Bridge Branch 
Office maintains the public docket for this temporary deviation.

FOR FURTHER INFORMATION CONTACT: Judy Leung-Yee, Project Officer, First 
Coast Guard District, at (212) 668-7165.

SUPPLEMENTARY INFORMATION: The Atlantic Beach Bridge across Reynolds 
Channel, mile 0.4, at Lawrence, New York, has a vertical clearance in 
the closed position of 25 feet at mean high water and 30 feet at mean 
low water. The existing operating regulations are listed at 33 CFR 
117.799.
    The bridge owner, Nassau County Bridge Authority, requested a 
temporary deviation to allow the bridge owner to require a one-hour 
advance notice for bridge openings to facilitate scheduled mechanical 
bridge maintenance.
    Under this temporary deviation a one-hour advance notice shall be 
required for bridge openings at the Atlantic Beach Bridge from April 9, 
2007 through April 27, 2007, between 7 a.m. and 3:30 p.m., daily.
    Should the bridge maintenance authorized by this temporary 
deviation be completed before the end of the effective period published 
in this notice, the Coast Guard will rescind the remainder of this 
temporary deviation, and the bridge shall be returned to its normal 
operating schedule. Notice of the above action shall be provided to the 
public in the Local Notice to Mariners and the Federal Register, where 
practicable.
    This deviation from the operating regulations is authorized under 
33 CFR 117.35.

    Dated: April 6, 2007.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E7-7155 Filed 4-13-07; 8:45 am]
BILLING CODE 4910-15-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.