Pine Needle LNG Company, LLC; Notice of Proposed Changes in FERC Gas Tariff, 17889 [E7-6680]

Download as PDF Federal Register / Vol. 72, No. 68 / Tuesday, April 10, 2007 / Notices There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 17889 Federal Energy Regulatory Commission Philis J. Posey, Acting Secretary. [FR Doc. E7–6680 Filed 4–9–07; 8:45 am] [Docket No. RP07–378–000] BILLING CODE 6717–01–P Pine Needle LNG Company, LLC; Notice of Proposed Changes in FERC Gas Tariff DEPARTMENT OF ENERGY 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission Philis J. Posey, Acting Secretary. [FR Doc. E7–6690 Filed 4–9–07; 8:45 am] [Docket No. RP07–388–000] BILLING CODE 6717–01–P Texas Gas Transmission, LLC; Notice of Tariff Filing and Non-Conforming Service Agreements DEPARTMENT OF ENERGY April 4, 2007. Federal Energy Regulatory Commission (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Philis J. Posey, Acting Secretary. [FR Doc. E7–6688 Filed 4–9–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY cprice-sewell on PROD1PC66 with NOTICES April 4, 2007. Take notice that on March 30, 2007 Pine Needle LNG Company, LLC (Pine Needle) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, Thirteenth Revised Sheet No. 4 to become effective May 1, 2007. Pine Needle states that it is serving copies of the instant filing to its affected customers, interested state commissions and other interested parties. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. VerDate Aug<31>2005 15:22 Apr 09, 2007 Jkt 211001 Take notice that on April 2, 2007, Texas Gas Transmission, LLC, (Texas Gas) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following tariff sheets, to become effective April 1, 2007: Second Revised Sheet No. 52 Original Sheet No. 52A Ninth Revised Sheet No. 56 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 [Docket No. RP07–381–000] Trailblazer Pipeline Company; Notice of Proposed Changes in FERC Gas Tariff April 4, 2007. Take notice that on March 30, 2007, Trailblazer Pipeline Company (Trailblazer) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, Fifth Revised Sheet No. 8, to become effective May 1, 2007. Trailblazer states that copies of this filing are being mailed to its customers and interested state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and E:\FR\FM\10APN1.SGM 10APN1

Agencies

[Federal Register Volume 72, Number 68 (Tuesday, April 10, 2007)]
[Notices]
[Page 17889]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-6680]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP07-378-000]


Pine Needle LNG Company, LLC; Notice of Proposed Changes in FERC 
Gas Tariff

April 4, 2007.
    Take notice that on March 30, 2007 Pine Needle LNG Company, LLC 
(Pine Needle) tendered for filing as part of its FERC Gas Tariff, 
Original Volume No. 1, Thirteenth Revised Sheet No. 4 to become 
effective May 1, 2007.
    Pine Needle states that it is serving copies of the instant filing 
to its affected customers, interested state commissions and other 
interested parties.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Philis J. Posey,
Acting Secretary.
[FR Doc. E7-6680 Filed 4-9-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.