Federal Register / Vol. 72, No. 68 / Tuesday, April 10, 2007 / Notices
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR Part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i)–(viii).
Requests for a hearing and petitions
for leave to intervene should be served
upon Mr. Donald J. Silverman, Morgan
Lewis & Bockius, LLP, 1111
Pennsylvania Avenue, NW.,
Washington, DC 20004 (tel: 202–739–
5502; fax: 202–739–3001; e-mail:
dsilverman@morganlewis.com); the
General Counsel, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001 (e-mail address for
filings regarding license transfer cases
only: OGCLT@NRC.gov); and the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff, in
accordance with 10 CFR 2.302 and
2.305.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice.
For further details with respect to this
action, see the application dated January
19, 2007, available for public inspection
at the Commission’s Public Document
Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555
VerDate Aug<31>2005
15:22 Apr 09, 2007
Jkt 211001
17943
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the Agencywide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209 or 301–415–4737 or by e-mail
to pdr@nrc.gov.
Meeting) (Contact: Ann Ramey-Smith,
301 415–6877).
This meeting will be webcast live at
the Web address, https://www.nrc.gov.
Dated at Rockville, Maryland this 20th day
of March, 2007.
For the Nuclear Regulatory Commission.
Robert A. Nelson,
Chief, Licensing Branch, Licensing and
Inspection Directorate, Division of Spent Fuel
Storage and Transportation, Office of Nuclear
Material Safety and Safeguards.
[FR Doc. E7–6742 Filed 4–9–07; 8:45 am]
1:30 p.m. Briefing on Office of Federal
and State Materials and
Environmental Management Programs
(FSME) Programs, Performance, and
Plans (Public Meeting).
This meeting will be webcast live at
the Web address, https://www.nrc.gov.
BILLING CODE 7590–01–P
There are no meetings scheduled for
the Week of May 14, 2007.
*
*
*
*
*
*The schedule for Commission
meetings is subject to change on short
notice. To verify the status of meetings
call (recording)—(301) 415–1292.
Contact person for more information:
Michelle Schroll, (301) 415–1662.
*
*
*
*
*
The NRC Commission Meeting
Schedule can be found on the Internet
at: https://www.nrc.gov/about-nrc/policymaking/schedule.html.
*
*
*
*
*
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings, or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.
braille, large print), please notify the
NRC’s Disability Program Coordinator,
Deborah Chan, at 301–415–7041, TDD:
301–415–2100, or by e-mail at
DLC@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
*
*
*
*
*
This notice is distributed by mail to
several hundred subscribers; if you no
longer wish to receive it, or would like
to be added to the distribution, please
contact the Office of the Secretary,
Washington, DC 20555 (301–415–1969).
In addition, distribution of this meeting
notice over the Internet system is
available. If you are interested in
receiving this Commission meeting
schedule electronically, please send an
electronic message to dkw@nrc.gov.
NUCLEAR REGULATORY
COMMISSION
Notice of Sunshine Act Meeting
Weeks of April 9, 16, 23, 30, May
7, 14, 2007.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Public and Closed.
MATTERS TO BE CONSIDERED:
DATE:
Week of April 9, 2007
There are no meetings scheduled for
the Week of April 9, 2007.
Week of April 16, 2007—Tentative
Monday, April 16, 2007
1:30 p.m. Discussion of Security Issues
(Closed-Ex. 1, 2, & 3).
Tuesday, April 17, 2007
9 a.m. Briefing on New Reactor Issues—
Environmental Issues (Public
Meeting) (Contact: James Lyons, 301
415–3050).
This meeting will be webcast live at
the Web address, https://www.nrc.gov.
12:55 p.m. Affirmation Session (Public
Meeting) (Tentative) a. Entergy
Nuclear Vermont Yankee, LLC, and
Entergy Nuclear Operations, Inc.
(Vermont Yankee Nuclear Power
Station) Docket No. 50–271–LR, LBP–
06–20, 64 NRC 131, 175–82 (2006)
(Tentative).
1 p.m. Briefing on Office of Nuclear
Regulatory Research (RES) Programs,
Performance, and Plans (Public
PO 00000
Frm 00128
Fmt 4703
Sfmt 4703
Week of April 23, 2007—Tentative
There are no meetings scheduled for
the Week of April 23, 2007.
Week of April 30, 2007—Tentative
There are no meetings scheduled for
the Week of April 30, 2007.
Week of May 7, 2007—Tentative
Monday, May 7, 2007
Week of May 14, 2007—Tentative
E:\FR\FM\10APN1.SGM
10APN1
17944
Federal Register / Vol. 72, No. 68 / Tuesday, April 10, 2007 / Notices
Dated: April 5, 2007.
Rochelle C. Bavol,
Office of the Secretary.
[FR Doc. 07–1795 Filed 4–6–07; 11:49 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Biweekly Notice; Applications and
Amendments to Facility Operating
Licenses Involving No Significant
Hazards Considerations
cprice-sewell on PROD1PC66 with NOTICES
I. Background
Pursuant to section 189a. (2) of the
Atomic Energy Act of 1954, as amended
(the Act), the U.S. Nuclear Regulatory
Commission (the Commission or NRC
staff) is publishing this regular biweekly
notice. The Act requires the
Commission publish notice of any
amendments issued, or proposed to be
issued, and grants the Commission the
authority to issue and make
immediately effective any amendment
to an operating license upon a
determination by the Commission that
such amendment involves no significant
hazards consideration, notwithstanding
the pendency before the Commission of
a request for a hearing from any person.
This biweekly notice includes all
notices of amendments issued, or
proposed to be issued from March 16,
2007 to March 29, 2007. The last
biweekly notice was published on
March 27, 2007 (72 FR 14303).
Notice of Consideration of Issuance of
Amendments to Facility Operating
Licenses, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for a Hearing
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
10 CFR 50.92, this means that operation
of the facility in accordance with the
proposed amendment would not (1)
involve a significant increase in the
probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
VerDate Aug<31>2005
15:22 Apr 09, 2007
Jkt 211001
determination. Within 60 days after the
date of publication of this notice, the
licensee may file a request for a hearing
with respect to issuance of the
amendment to the subject facility
operating license and any person whose
interest may be affected by this
proceeding and who wishes to
participate as a party in the proceeding
must file a written request for a hearing
and a petition for leave to intervene.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rulemaking,
Directives and Editing Branch, Division
of Administrative Services, Office of
Administration, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, and should cite the publication
date and page number of this Federal
Register notice. Written comments may
also be delivered to Room 6D22, Two
White Flint North, 11545 Rockville
Pike, Rockville, Maryland, from 7:30
a.m. to 4:15 p.m. Federal workdays.
Copies of written comments received
may be examined at the Commission’s
Public Document Room (PDR), located
at One White Flint North, Public File
Area O1F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. The filing of
requests for a hearing and petitions for
leave to intervene is discussed below.
Within 60 days after the date of
publication of this notice, the licensee
may file a request for a hearing with
respect to issuance of the amendment to
the subject facility operating license and
any person whose interest may be
affected by this proceeding and who
wishes to participate as a party in the
proceeding must file a written request
PO 00000
Frm 00129
Fmt 4703
Sfmt 4703
for a hearing and a petition for leave to
intervene. Requests for a hearing and a
petition for leave to intervene shall be
filed in accordance with the
Commission’s ‘‘Rules of Practice for
Domestic Licensing Proceedings’’ in 10
CFR part 2. Interested persons should
consult a current copy of 10 CFR 2.309,
which is available at the Commission’s
PDR, located at One White Flint North,
Public File Area 01F21, 11555 Rockville
Pike (first floor), Rockville, Maryland.
Publicly available records will be
accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a
request for a hearing or petition for
leave to intervene is filed within 60
days, the Commission or a presiding
officer designated by the Commission or
by the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address, and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also set forth the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner/requestor
intends to rely in proving the contention
at the hearing. The petitioner/requestor
must also provide references to those
specific sources and documents of
E:\FR\FM\10APN1.SGM
10APN1
Agencies
[Federal Register Volume 72, Number 68 (Tuesday, April 10, 2007)]
[Notices]
[Pages 17943-17944]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 07-1795]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Notice of Sunshine Act Meeting
Date: Weeks of April 9, 16, 23, 30, May 7, 14, 2007.
Place: Commissioners' Conference Room, 11555 Rockville Pike, Rockville,
Maryland.
Status: Public and Closed.
Matters to be Considered:
Week of April 9, 2007
There are no meetings scheduled for the Week of April 9, 2007.
Week of April 16, 2007--Tentative
Monday, April 16, 2007
1:30 p.m. Discussion of Security Issues (Closed-Ex. 1, 2, & 3).
Tuesday, April 17, 2007
9 a.m. Briefing on New Reactor Issues--Environmental Issues (Public
Meeting) (Contact: James Lyons, 301 415-3050).
This meeting will be webcast live at the Web address, https://
www.nrc.gov.
12:55 p.m. Affirmation Session (Public Meeting) (Tentative) a. Entergy
Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.
(Vermont Yankee Nuclear Power Station) Docket No. 50-271-LR, LBP-06-20,
64 NRC 131, 175-82 (2006) (Tentative).
1 p.m. Briefing on Office of Nuclear Regulatory Research (RES)
Programs, Performance, and Plans (Public Meeting) (Contact: Ann Ramey-
Smith, 301 415-6877).
This meeting will be webcast live at the Web address, https://
www.nrc.gov.
Week of April 23, 2007--Tentative
There are no meetings scheduled for the Week of April 23, 2007.
Week of April 30, 2007--Tentative
There are no meetings scheduled for the Week of April 30, 2007.
Week of May 7, 2007--Tentative
Monday, May 7, 2007
1:30 p.m. Briefing on Office of Federal and State Materials and
Environmental Management Programs (FSME) Programs, Performance, and
Plans (Public Meeting).
This meeting will be webcast live at the Web address, https://
www.nrc.gov.
Week of May 14, 2007--Tentative
There are no meetings scheduled for the Week of May 14, 2007.
* * * * *
*The schedule for Commission meetings is subject to change on short
notice. To verify the status of meetings call (recording)--(301) 415-
1292. Contact person for more information: Michelle Schroll, (301) 415-
1662.
* * * * *
The NRC Commission Meeting Schedule can be found on the Internet
at: https://www.nrc.gov/about-nrc/policy-making/schedule.html.
* * * * *
The NRC provides reasonable accommodation to individuals with
disabilities where appropriate. If you need a reasonable accommodation
to participate in these public meetings, or need this meeting notice or
the transcript or other information from the public meetings in another
format (e.g. braille, large print), please notify the NRC's Disability
Program Coordinator, Deborah Chan, at 301-415-7041, TDD: 301-415-2100,
or by e-mail at DLC@nrc.gov. Determinations on requests for reasonable
accommodation will be made on a case-by-case basis.
* * * * *
This notice is distributed by mail to several hundred subscribers;
if you no longer wish to receive it, or would like to be added to the
distribution, please contact the Office of the Secretary, Washington,
DC 20555 (301-415-1969). In addition, distribution of this meeting
notice over the Internet system is available. If you are interested in
receiving this Commission meeting schedule electronically, please send
an electronic message to dkw@nrc.gov.
[[Page 17944]]
Dated: April 5, 2007.
Rochelle C. Bavol,
Office of the Secretary.
[FR Doc. 07-1795 Filed 4-6-07; 11:49 am]