Download as PDF cprice-sewell on PROD1PC66 with NOTICES Federal Register / Vol. 72, No. 68 / Tuesday, April 10, 2007 / Notices Documents, Selection of Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings,’’ of 10 CFR Part 2. In particular, such requests and petitions must comply with the requirements set forth in 10 CFR 2.309. Untimely requests and petitions may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for failure to file on time is established. In addition, an untimely request or petition should address the factors that the Commission will also consider, in reviewing untimely requests or petitions, set forth in 10 CFR 2.309(c)(1)(i)–(viii). Requests for a hearing and petitions for leave to intervene should be served upon Mr. Donald J. Silverman, Morgan Lewis & Bockius, LLP, 1111 Pennsylvania Avenue, NW., Washington, DC 20004 (tel: 202–739– 5502; fax: 202–739–3001; e-mail: dsilverman@morganlewis.com); the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001 (e-mail address for filings regarding license transfer cases only: OGCLT@NRC.gov); and the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemakings and Adjudications Staff, in accordance with 10 CFR 2.302 and 2.305. The Commission will issue a notice or order granting or denying a hearing request or intervention petition, designating the issues for any hearing that will be held and designating the Presiding Officer. A notice granting a hearing will be published in the Federal Register and served on the parties to the hearing. As an alternative to requests for hearing and petitions to intervene, within 30 days from the date of publication of this notice, persons may submit written comments regarding the license transfer application, as provided for in 10 CFR 2.1305. The Commission will consider and, if appropriate, respond to these comments, but such comments will not otherwise constitute part of the decisional record. Comments should be submitted to the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemakings and Adjudications Staff, and should cite the publication date and page number of this Federal Register notice. For further details with respect to this action, see the application dated January 19, 2007, available for public inspection at the Commission’s Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 VerDate Aug<31>2005 15:22 Apr 09, 2007 Jkt 211001 17943 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System’s (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https:// www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1–800– 397–4209 or 301–415–4737 or by e-mail to pdr@nrc.gov. Meeting) (Contact: Ann Ramey-Smith, 301 415–6877). This meeting will be webcast live at the Web address, https://www.nrc.gov. Dated at Rockville, Maryland this 20th day of March, 2007. For the Nuclear Regulatory Commission. Robert A. Nelson, Chief, Licensing Branch, Licensing and Inspection Directorate, Division of Spent Fuel Storage and Transportation, Office of Nuclear Material Safety and Safeguards. [FR Doc. E7–6742 Filed 4–9–07; 8:45 am] 1:30 p.m. Briefing on Office of Federal and State Materials and Environmental Management Programs (FSME) Programs, Performance, and Plans (Public Meeting). This meeting will be webcast live at the Web address, https://www.nrc.gov. BILLING CODE 7590–01–P There are no meetings scheduled for the Week of May 14, 2007. * * * * * *The schedule for Commission meetings is subject to change on short notice. To verify the status of meetings call (recording)—(301) 415–1292. Contact person for more information: Michelle Schroll, (301) 415–1662. * * * * * The NRC Commission Meeting Schedule can be found on the Internet at: https://www.nrc.gov/about-nrc/policymaking/schedule.html. * * * * * The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings, or need this meeting notice or the transcript or other information from the public meetings in another format (e.g. braille, large print), please notify the NRC’s Disability Program Coordinator, Deborah Chan, at 301–415–7041, TDD: 301–415–2100, or by e-mail at DLC@nrc.gov. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. * * * * * This notice is distributed by mail to several hundred subscribers; if you no longer wish to receive it, or would like to be added to the distribution, please contact the Office of the Secretary, Washington, DC 20555 (301–415–1969). In addition, distribution of this meeting notice over the Internet system is available. If you are interested in receiving this Commission meeting schedule electronically, please send an electronic message to dkw@nrc.gov. NUCLEAR REGULATORY COMMISSION Notice of Sunshine Act Meeting Weeks of April 9, 16, 23, 30, May 7, 14, 2007. PLACE: Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. STATUS: Public and Closed. MATTERS TO BE CONSIDERED: DATE: Week of April 9, 2007 There are no meetings scheduled for the Week of April 9, 2007. Week of April 16, 2007—Tentative Monday, April 16, 2007 1:30 p.m. Discussion of Security Issues (Closed-Ex. 1, 2, & 3). Tuesday, April 17, 2007 9 a.m. Briefing on New Reactor Issues— Environmental Issues (Public Meeting) (Contact: James Lyons, 301 415–3050). This meeting will be webcast live at the Web address, https://www.nrc.gov. 12:55 p.m. Affirmation Session (Public Meeting) (Tentative) a. Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station) Docket No. 50–271–LR, LBP– 06–20, 64 NRC 131, 175–82 (2006) (Tentative). 1 p.m. Briefing on Office of Nuclear Regulatory Research (RES) Programs, Performance, and Plans (Public PO 00000 Frm 00128 Fmt 4703 Sfmt 4703 Week of April 23, 2007—Tentative There are no meetings scheduled for the Week of April 23, 2007. Week of April 30, 2007—Tentative There are no meetings scheduled for the Week of April 30, 2007. Week of May 7, 2007—Tentative Monday, May 7, 2007 Week of May 14, 2007—Tentative E:\FR\FM\10APN1.SGM 10APN1 17944 Federal Register / Vol. 72, No. 68 / Tuesday, April 10, 2007 / Notices Dated: April 5, 2007. Rochelle C. Bavol, Office of the Secretary. [FR Doc. 07–1795 Filed 4–6–07; 11:49 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations cprice-sewell on PROD1PC66 with NOTICES I. Background Pursuant to section 189a. (2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (the Commission or NRC staff) is publishing this regular biweekly notice. The Act requires the Commission publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding the pendency before the Commission of a request for a hearing from any person. This biweekly notice includes all notices of amendments issued, or proposed to be issued from March 16, 2007 to March 29, 2007. The last biweekly notice was published on March 27, 2007 (72 FR 14303). Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing The Commission has made a proposed determination that the following amendment requests involve no significant hazards consideration. Under the Commission’s regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. The basis for this proposed determination for each amendment request is shown below. The Commission is seeking public comments on this proposed determination. Any comments received within 30 days after the date of publication of this notice will be considered in making any final VerDate Aug<31>2005 15:22 Apr 09, 2007 Jkt 211001 determination. Within 60 days after the date of publication of this notice, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene. Normally, the Commission will not issue the amendment until the expiration of 60 days after the date of publication of this notice. The Commission may issue the license amendment before expiration of the 60day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility. Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance. Should the Commission make a final No Significant Hazards Consideration Determination, any hearing will take place after issuance. The Commission expects that the need to take this action will occur very infrequently. Written comments may be submitted by mail to the Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, and should cite the publication date and page number of this Federal Register notice. Written comments may also be delivered to Room 6D22, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Copies of written comments received may be examined at the Commission’s Public Document Room (PDR), located at One White Flint North, Public File Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland. The filing of requests for a hearing and petitions for leave to intervene is discussed below. Within 60 days after the date of publication of this notice, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request PO 00000 Frm 00129 Fmt 4703 Sfmt 4703 for a hearing and a petition for leave to intervene. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commission’s ‘‘Rules of Practice for Domestic Licensing Proceedings’’ in 10 CFR part 2. Interested persons should consult a current copy of 10 CFR 2.309, which is available at the Commission’s PDR, located at One White Flint North, Public File Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the Agencywide Documents Access and Management System’s (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/ reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is filed within 60 days, the Commission or a presiding officer designated by the Commission or by the Chief Administrative Judge of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the Chief Administrative Judge of the Atomic Safety and Licensing Board will issue a notice of a hearing or an appropriate order. As required by 10 CFR 2.309, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements: (1) The name, address, and telephone number of the requestor or petitioner; (2) the nature of the requestor’s/petitioner’s right under the Act to be made a party to the proceeding; (3) the nature and extent of the requestor’s/petitioner’s property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the requestor’s/petitioner’s interest. The petition must also set forth the specific contentions which the petitioner/ requestor seeks to have litigated at the proceeding. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner/requestor shall provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner/requestor intends to rely in proving the contention at the hearing. The petitioner/requestor must also provide references to those specific sources and documents of E:\FR\FM\10APN1.SGM 10APN1

Agencies

[Federal Register Volume 72, Number 68 (Tuesday, April 10, 2007)]
[Notices]
[Pages 17943-17944]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 07-1795]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Notice of Sunshine Act Meeting

Date: Weeks of April 9, 16, 23, 30, May 7, 14, 2007.

Place: Commissioners' Conference Room, 11555 Rockville Pike, Rockville, 
Maryland.

Status: Public and Closed.

Matters to be Considered: 

Week of April 9, 2007

    There are no meetings scheduled for the Week of April 9, 2007.

Week of April 16, 2007--Tentative

Monday, April 16, 2007

1:30 p.m. Discussion of Security Issues (Closed-Ex. 1, 2, & 3).

Tuesday, April 17, 2007

9 a.m. Briefing on New Reactor Issues--Environmental Issues (Public 
Meeting) (Contact: James Lyons, 301 415-3050).

    This meeting will be webcast live at the Web address, https://
www.nrc.gov.

12:55 p.m. Affirmation Session (Public Meeting) (Tentative) a. Entergy 
Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. 
(Vermont Yankee Nuclear Power Station) Docket No. 50-271-LR, LBP-06-20, 
64 NRC 131, 175-82 (2006) (Tentative).
1 p.m. Briefing on Office of Nuclear Regulatory Research (RES) 
Programs, Performance, and Plans (Public Meeting) (Contact: Ann Ramey-
Smith, 301 415-6877).

    This meeting will be webcast live at the Web address, https://
www.nrc.gov.

Week of April 23, 2007--Tentative

    There are no meetings scheduled for the Week of April 23, 2007.

Week of April 30, 2007--Tentative

    There are no meetings scheduled for the Week of April 30, 2007.

Week of May 7, 2007--Tentative

Monday, May 7, 2007

1:30 p.m. Briefing on Office of Federal and State Materials and 
Environmental Management Programs (FSME) Programs, Performance, and 
Plans (Public Meeting).

    This meeting will be webcast live at the Web address, https://
www.nrc.gov.

Week of May 14, 2007--Tentative

    There are no meetings scheduled for the Week of May 14, 2007.
* * * * *
    *The schedule for Commission meetings is subject to change on short 
notice. To verify the status of meetings call (recording)--(301) 415-
1292. Contact person for more information: Michelle Schroll, (301) 415-
1662.
* * * * *
    The NRC Commission Meeting Schedule can be found on the Internet 
at: https://www.nrc.gov/about-nrc/policy-making/schedule.html.
* * * * *
    The NRC provides reasonable accommodation to individuals with 
disabilities where appropriate. If you need a reasonable accommodation 
to participate in these public meetings, or need this meeting notice or 
the transcript or other information from the public meetings in another 
format (e.g. braille, large print), please notify the NRC's Disability 
Program Coordinator, Deborah Chan, at 301-415-7041, TDD: 301-415-2100, 
or by e-mail at DLC@nrc.gov. Determinations on requests for reasonable 
accommodation will be made on a case-by-case basis.
* * * * *
    This notice is distributed by mail to several hundred subscribers; 
if you no longer wish to receive it, or would like to be added to the 
distribution, please contact the Office of the Secretary, Washington, 
DC 20555 (301-415-1969). In addition, distribution of this meeting 
notice over the Internet system is available. If you are interested in 
receiving this Commission meeting schedule electronically, please send 
an electronic message to dkw@nrc.gov.


[[Page 17944]]


    Dated: April 5, 2007.
Rochelle C. Bavol,
Office of the Secretary.
[FR Doc. 07-1795 Filed 4-6-07; 11:49 am]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.