Transcontinental Gas Pipe Line Corporation; Notice of Authorization and Waiver, 17546 [E7-6572]

Download as PDF 17546 Federal Register / Vol. 72, No. 67 / Monday, April 9, 2007 / Notices appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Philis J. Posey, Acting Secretary. [FR Doc. E7–6571 Filed 4–6–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP07–376–000] Transcontinental Gas Pipe Line Corporation; Notice of Authorization and Waiver sroberts on PROD1PC70 with NOTICES April 3, 2007. Take notice that on March 30, 2007, Transcontinental Gas Pipe Line Corporation (Transco) seeks authorization from the Commission to use the posting and bid evaluation procedures in Section 43 of the General Terms & Conditions of its FERC Gas Tariff (GT&C) to sell certain excess top gas inventory. In conjunction with such sale, Transco requests that the VerDate Aug<31>2005 18:21 Apr 06, 2007 Jkt 211001 Commission grant waiver of Section 43.5 of the GT&C in order for Transco to recognize the appropriate accounting from the sale in its gas inventory account. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time April 11, 2007. Philis J. Posey, Acting Secretary. [FR Doc. E7–6572 Filed 4–6–07; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP96–359–033] Transcontinental Gas Pipe Line Corporation; Notice of Negotiated Rate April 3, 2007. Take notice that on March 29, 2007, Transcontinental Gas Pipe Line Corporation (Transco) tendered for filing three executed service agreements between Transco and City of Monroe, North Carolina, Hess Corporation, and Greenville Utilities Commission and an executed amendment to service agreement between Transco and Progress Ventures, Inc. all of which pertain to negotiated rate agreements for firm transportation service under Transco’s Momentum Expansion Project. The effective date of the agreements is April 1, 2007. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC E:\FR\FM\09APN1.SGM 09APN1

Agencies

[Federal Register Volume 72, Number 67 (Monday, April 9, 2007)]
[Notices]
[Page 17546]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-6572]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP07-376-000]


Transcontinental Gas Pipe Line Corporation; Notice of 
Authorization and Waiver

April 3, 2007.
    Take notice that on March 30, 2007, Transcontinental Gas Pipe Line 
Corporation (Transco) seeks authorization from the Commission to use 
the posting and bid evaluation procedures in Section 43 of the General 
Terms & Conditions of its FERC Gas Tariff (GT&C) to sell certain excess 
top gas inventory. In conjunction with such sale, Transco requests that 
the Commission grant waiver of Section 43.5 of the GT&C in order for 
Transco to recognize the appropriate accounting from the sale in its 
gas inventory account.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the date as indicated 
below. Anyone filing an intervention or protest must serve a copy of 
that document on the Applicant. Anyone filing an intervention or 
protest on or before the intervention or protest date need not serve 
motions to intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time April 11, 2007.

Philis J. Posey,
Acting Secretary.
[FR Doc. E7-6572 Filed 4-6-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.