Gulfstream Natural Gas System, L.L.C.; Notice of Availability of the Environmental Assessment for the Proposed Gulfstream Phase III Pipeline Project, 16778 [E7-6313]
Download as PDF
16778
Federal Register / Vol. 72, No. 65 / Thursday, April 5, 2007 / Notices
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7–6332 Filed 4–4–07; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP00–6–014]
Gulfstream Natural Gas System, L.L.C.;
Notice of Availability of the
Environmental Assessment for the
Proposed Gulfstream Phase III Pipeline
Project
jlentini on PROD1PC65 with NOTICES
March 30, 2007.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) on the
natural gas pipeline facilities proposed
by Gulfstream Natural Gas System,
L.L.C. (Gulfstream) in the abovereferenced docket.
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The staff
concludes that approval of the proposed
project, with appropriate mitigating
measures, would not constitute a major
VerDate Aug<31>2005
17:37 Apr 04, 2007
Jkt 211001
federal action significantly affecting the
quality of the human environment.
The EA assesses the potential
environmental effects of the
construction and operation of
approximately 34.30 miles of 30-inchdiameter pipeline and associated
aboveground facilities in Martin County
and Palm Beach County, Florida. The
pipeline would commence at
Gulfstream’s existing Station 712 in
Martin County and would terminate at
a newly constructed Station 705 that
would connect to the proposed Florida
Power & Light Company (FPL) West
County Energy Center (WCEC) in Palm
Beach County. Gulfstream has executed
firm service agreement with FPL to
deliver 345,000 decatherms per day
(Dth/d) of natural gas to the WCEC for
a primary term of 23 years.
Approximately 7.15 miles of the
proposed pipeline route follows the
Line 700 route previously certificated by
the Commission in February 2001 under
Docket No. CP00–006.
The EA has been placed in the public
files of the FERC. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426,
(202) 502–8371.
Copies of the EA have been mailed to
federal; state; and local agencies; public
interest groups; individuals who have
requested the EA; libraries; newspapers;
and parties to this proceeding.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below. Please
carefully follow these instructions to
ensure that your comments are received
in time and properly recorded:
• Send an original and two copies of
your comments to: Secretary, Federal
Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC
20426;
• Label one copy of the comments for
the attention of the Gas Branch 3;
• Reference Docket No. CP00–6–014;
and
• Mail your comments so that they
will be received in Washington, DC on
or before April 30, 2007.
The Commission strongly encourages
electronic filing of any comments or
interventions or protests to this
proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
on the Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link
and the link to the User’s Guide. Before
you can file comments you will need to
create a free account which can be
created by clicking on ‘‘Sign-up.’’
Comments will be considered by the
Commission but will not serve to make
the commenter a party to the
proceeding. Any person seeking to
become a party to the proceeding must
file a motion to intervene pursuant to
Rule 214 of the Commission’s Rules of
Practice and Procedures (18 CFR
385.214).1 Only intervenors have the
right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202)502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Philis J. Posey.
Acting Secretary.
[FR Doc. E7–6313 Filed 4–4–07; 8:45 am]
BILLING CODE 6717–01–P
1 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
E:\FR\FM\05APN1.SGM
05APN1
Agencies
[Federal Register Volume 72, Number 65 (Thursday, April 5, 2007)]
[Notices]
[Page 16778]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-6313]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP00-6-014]
Gulfstream Natural Gas System, L.L.C.; Notice of Availability of
the Environmental Assessment for the Proposed Gulfstream Phase III
Pipeline Project
March 30, 2007.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) on the
natural gas pipeline facilities proposed by Gulfstream Natural Gas
System, L.L.C. (Gulfstream) in the above-referenced docket.
The EA was prepared to satisfy the requirements of the National
Environmental Policy Act. The staff concludes that approval of the
proposed project, with appropriate mitigating measures, would not
constitute a major federal action significantly affecting the quality
of the human environment.
The EA assesses the potential environmental effects of the
construction and operation of approximately 34.30 miles of 30-inch-
diameter pipeline and associated aboveground facilities in Martin
County and Palm Beach County, Florida. The pipeline would commence at
Gulfstream's existing Station 712 in Martin County and would terminate
at a newly constructed Station 705 that would connect to the proposed
Florida Power & Light Company (FPL) West County Energy Center (WCEC) in
Palm Beach County. Gulfstream has executed firm service agreement with
FPL to deliver 345,000 decatherms per day (Dth/d) of natural gas to the
WCEC for a primary term of 23 years. Approximately 7.15 miles of the
proposed pipeline route follows the Line 700 route previously
certificated by the Commission in February 2001 under Docket No. CP00-
006.
The EA has been placed in the public files of the FERC. A limited
number of copies of the EA are available for distribution and public
inspection at: Federal Energy Regulatory Commission, Public Reference
Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502-
8371.
Copies of the EA have been mailed to federal; state; and local
agencies; public interest groups; individuals who have requested the
EA; libraries; newspapers; and parties to this proceeding.
Any person wishing to comment on the EA may do so. To ensure
consideration prior to a Commission decision on the proposal, it is
important that we receive your comments before the date specified
below. Please carefully follow these instructions to ensure that your
comments are received in time and properly recorded:
Send an original and two copies of your comments to:
Secretary, Federal Energy Regulatory Commission, 888 First St., NE.,
Room 1A, Washington, DC 20426;
Label one copy of the comments for the attention of the
Gas Branch 3;
Reference Docket No. CP00-6-014; and
Mail your comments so that they will be received in
Washington, DC on or before April 30, 2007.
The Commission strongly encourages electronic filing of any
comments or interventions or protests to this proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at https://www.ferc.gov under the ``e-Filing'' link and the link to the
User's Guide. Before you can file comments you will need to create a
free account which can be created by clicking on ``Sign-up.''
Comments will be considered by the Commission but will not serve to
make the commenter a party to the proceeding. Any person seeking to
become a party to the proceeding must file a motion to intervene
pursuant to Rule 214 of the Commission's Rules of Practice and
Procedures (18 CFR 385.214).\1\ Only intervenors have the right to seek
rehearing of the Commission's decision.
---------------------------------------------------------------------------
\1\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your comments considered.
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on ``General Search'' and enter the
docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202)502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Philis J. Posey.
Acting Secretary.
[FR Doc. E7-6313 Filed 4-4-07; 8:45 am]
BILLING CODE 6717-01-P