Download as PDF Federal Register / Vol. 72, No. 62 / Monday, April 2, 2007 / Notices Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on April 12, 2007. Philis J. Posey, Acting Secretary. [FR Doc. E7–5996 Filed 3–30–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL07–50–000] Californians for Renewable Energy, Inc. (CARE) Complaints v. California Public Utilities Commission, Southern California Edison Company, and Blythe Energy, LLC, Respondents; Notice of Complaints hsrobinson on PROD1PC76 with NOTICES March 27, 2007. Take notice that on March 26, 2007, Californians for Renewable Energy, Inc. (CARE) submitted a complaint against the California Public Utilities Commission for its action on March 15, 2007, authorizing hearings concerning Southern California Edison Company’s (SCE) application to enter into a power purchase agreement with Blythe Energy, LLC (Blythe), in violation of the Federal Power Act pursuant to section 205 of the FPA. CARE alleges that the prices, terms, and conditions of such contract are unjust and unreasonable. CARE further alleges SCE and Blythe failed to file their rates and the rates approved by the California Public Utilities Commission do not serve the ‘‘public interest’’ under the FPA and are in fact unduly preferential and discriminatory against their party customers, and impose an excessive burden on these customers. CARE states that copies of this filing were served upon Respondents and other interested parties. VerDate Aug<31>2005 19:21 Mar 30, 2007 Jkt 211001 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on April 16, 2007. Philis J. Posey, Acting Secretary. [FR Doc. E7–5991 Filed 3–30–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 March 27, 2007. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC06–166–000. Applicants: Legg Mason, Inc. Description: Legg Mason Inc submits its amended and restated application for blanket authorization to acquire utility and/or holding company securities. Filed Date: 03/21/2007. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 15681 Accession Number: 20070327–0097. Comment Date: 5 p.m. Eastern Time on Wednesday, April 04, 2007. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER04–374–005. Applicants: Invenergy TN LLC. Description: Invenergy TN LLC submits its triennial market power analysis update. Filed Date: 03/23/2007. Accession Number: 20070326–0016 Comment Date: 5 p.m. Eastern. Time on Friday, April 13, 2007. Docket Numbers: ER06–311–003. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc and New York Transmission Owners submits joint compliance filing pursuant to FERC’s 2/20/07 Orders et al which established pro forma Small Generation Interconnection Procedures, ER06–311. Filed Date: 03/22/2007. Accession Number: 20070326–0026. Comment Date: 5 p.m. Eastern Time on Thursday, April 12, 2007. Docket Numbers: ER07–336–001. Applicants: San Diego Gas & Electric Company. Description: San Diego Gas & Electric correction to Compliance Filing. Filed Date: 03/22/2007. Accession Number: 20070322–5045. Comment Date: 5 p.m. Eastern Time on Monday, April 2, 2007. Docket Numbers: ER07–639–000. Applicants: AEP Generating Company. Description: American Electric Power Service Corporation submits Unit Power Agreement under which AEP Generating Co proposes to sell all of the capacity and associated energy, & ancillary services from MW Lawrenceburg generating plant etc. Filed Date: 03/16/2007. Accession Number: 20070321–0062. Comment Date: 5 p.m. Eastern Time on Friday, April 06, 2007. Docket Numbers: ER07–646–000. Applicants: Arizona Public Service Company. Description: Arizona Public Service Company submits an executed transmission Interconnection Agreement with Southwest Transmission Cooperative, Inc. Filed Date: 03/23/2007. Accession Number: 20070326–0015. Comment Date: 5 p.m. Eastern Time on Friday, April 13, 2007. Take notice that the Commission received the following foreign utility company status filings: Docket Numbers: FC07–19–000. E:\FR\FM\02APN1.SGM 02APN1 hsrobinson on PROD1PC76 with NOTICES 15682 Federal Register / Vol. 72, No. 62 / Monday, April 2, 2007 / Notices Applicants: Terasen Gas Inc. Description: Terasen Gas Inc. submits a Notice of Self-Certification of Foreign Utility Company Status. Filed Date: 03/26/2007. Accession Number: 20070326–5035. Comment Date: 5 p.m. Eastern Time on Monday, April 16, 2007. Docket Numbers: FC07–20–000. Applicants: Terasen Gas (Vancouver Island) Inc. Description: Terasen Gas (Vancouver Island) Inc. submits a notice of SelfCertification of Foreign Utility Company Status. Filed Date: 03/26/2007. Accession Number: 20070326–5035. Comment Date: 5 p.m. Eastern Time on Monday, April 16, 2007. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR07–10–000. Applicants: North American Electric Reliability Corporation. Description: North American Electric Reliability Corporation submits for FERC’s approval proposed violation risk factors for requirements in Version 1 reliability standards included in its reliability standards approved by Order 693. Filed Date: 03/23/2007. Accession Number: 20070327–0162. Comment Date: 5 p.m. Eastern Time on Monday, April 23, 2007. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the VerDate Aug<31>2005 18:39 Mar 30, 2007 Jkt 211001 eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. significantly affecting the quality of the human environment. A copy of the EA is attached to a Commission order titled ‘‘Order Amending License,’’ issued March 22, 2007 and is available for review at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Philis J. Posey, Acting Secretary. [FR Doc. E7–5997 Filed 3–30–07; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Philis J. Posey, Acting Secretary. [FR Doc. E7–6006 Filed 3–30–07; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Project No. 6641–067] Federal Energy Regulatory Commission American Municipal Power—Ohio, Inc., City of Marion, Kentucky and Smithland Hydroelectric Partners; Notice of Availability of Environmental Assessment [Project No. 10228–038] March 27, 2007. DEPARTMENT OF ENERGY American Municipal Power—Ohio, Inc., Cannelton Hydroelectric Project, L.P.; Notice of Availability of Environmental Assessment March 27, 2007. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission or FERC) regulations contained in the Code of Federal Regulations (CFR) (18 CFR part 380 [FERC Order No. 486, 52 FR 47897]), the Office of Energy Projects staff (staff) reviewed a proposal to amend the design authorized by the license for the Cannelton Hydroelectric Project, to be located at the U.S. Corps of Engineers’ Cannelton Locks and Dam on the Ohio River in Hancock County, Kentucky, and prepared an environmental assessment (EA) for the proposed amendment of the project license. In this EA, staff analyzes the potential environmental effects of replacing the authorized 140 small generator units with three conventional turbine and generator units and concludes that the amendment would not constitute a major federal action PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission or FERC) regulations contained in the Code of Federal Regulations (CFR) (18 CFR Part 380 [FERC Order No. 486, 52 FR 47897]), the Office of Energy Projects staff (staff) reviewed a proposal to amend the design authorized by the license for the Smithland Hydroelectric Project, to be located the U.S. Army Corps of Engineers’ Smithland Locks and Dam on the Ohio River in Livingston County, Kentucky, and prepared an environmental assessment (EA) for the proposed amendment of the project license. In this EA, staff analyzes the potential environmental effects of replacing the authorized 170 small generator units with three conventional turbine and generator units and concludes that the amendment would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is attached to a Commission order titled ‘‘Order Amending License’’, issued March 22, 2007 and is available for review at the Commission in the Public Reference E:\FR\FM\02APN1.SGM 02APN1

Agencies

[Federal Register Volume 72, Number 62 (Monday, April 2, 2007)]
[Notices]
[Pages 15681-15682]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E7-6006]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

March 27, 2007.
    Take notice that the Commission received the following electric 
corporate filings:
    Docket Numbers: EC06-166-000.
    Applicants: Legg Mason, Inc.
    Description: Legg Mason Inc submits its amended and restated 
application for blanket authorization to acquire utility and/or holding 
company securities. 
    Filed Date: 03/21/2007.
    Accession Number: 20070327-0097.
    Comment Date: 5 p.m. Eastern Time on Wednesday, April 04, 2007.
    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER04-374-005.
    Applicants: Invenergy TN LLC.
    Description: Invenergy TN LLC submits its triennial market power 
analysis update. 
    Filed Date: 03/23/2007.
    Accession Number: 20070326-0016
    Comment Date: 5 p.m. Eastern. Time on Friday, April 13, 2007.

    Docket Numbers: ER06-311-003.
    Applicants: New York Independent System Operator, Inc.
    Description: New York Independent System Operator, Inc and New York 
Transmission Owners submits joint compliance filing pursuant to FERC's 
2/20/07 Orders et al which established pro forma Small Generation 
Interconnection Procedures, ER06-311. 
    Filed Date: 03/22/2007.
    Accession Number: 20070326-0026.
    Comment Date: 5 p.m. Eastern Time on Thursday, April 12, 2007.

    Docket Numbers: ER07-336-001.
    Applicants: San Diego Gas & Electric Company.
    Description: San Diego Gas & Electric correction to Compliance 
Filing.
    Filed Date: 03/22/2007.
    Accession Number: 20070322-5045.
    Comment Date: 5 p.m. Eastern Time on Monday, April 2, 2007.

    Docket Numbers: ER07-639-000.
    Applicants: AEP Generating Company.
    Description: American Electric Power Service Corporation submits 
Unit Power Agreement under which AEP Generating Co proposes to sell all 
of the capacity and associated energy, & ancillary services from MW 
Lawrenceburg generating plant etc. 
    Filed Date: 03/16/2007.
    Accession Number: 20070321-0062.
    Comment Date: 5 p.m. Eastern Time on Friday, April 06, 2007.

    Docket Numbers: ER07-646-000.
    Applicants: Arizona Public Service Company.
    Description: Arizona Public Service Company submits an executed 
transmission Interconnection Agreement with Southwest Transmission 
Cooperative, Inc. 
    Filed Date: 03/23/2007.
    Accession Number: 20070326-0015.
    Comment Date: 5 p.m. Eastern Time on Friday, April 13, 2007.
    Take notice that the Commission received the following foreign 
utility company status filings:
    Docket Numbers: FC07-19-000.

[[Page 15682]]

    Applicants: Terasen Gas Inc.
    Description: Terasen Gas Inc. submits a Notice of Self-
Certification of Foreign Utility Company Status.
    Filed Date: 03/26/2007.
    Accession Number: 20070326-5035.
    Comment Date: 5 p.m. Eastern Time on Monday, April 16, 2007.
    Docket Numbers: FC07-20-000.
    Applicants: Terasen Gas (Vancouver Island) Inc.
    Description: Terasen Gas (Vancouver Island) Inc. submits a notice 
of Self-Certification of Foreign Utility Company Status.
    Filed Date: 03/26/2007.
    Accession Number: 20070326-5035.
    Comment Date: 5 p.m. Eastern Time on Monday, April 16, 2007.
    Take notice that the Commission received the following electric 
reliability filings:
    Docket Numbers: RR07-10-000.
    Applicants: North American Electric Reliability Corporation.
    Description: North American Electric Reliability Corporation 
submits for FERC's approval proposed violation risk factors for 
requirements in Version 1 reliability standards included in its 
reliability standards approved by Order 693.
    Filed Date: 03/23/2007.
    Accession Number: 20070327-0162.
    Comment Date: 5 p.m. Eastern Time on Monday, April 23, 2007.
    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed dockets(s). For assistance 
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. 
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Philis J. Posey,
Acting Secretary.
 [FR Doc. E7-6006 Filed 3-30-07; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.